Permit Information
Permit NumberBLD98-03053
StatusFinaled
Name BOISE CHAMBER OF COMMERCE
Site Address 250 S 5TH ST Unit: 8 FLR
Project NameC W MOORE PLAZA-8TH
Customer Number 
ePlanReviewNo
Description
(BOISE CHAMBER OF COMMERCE) Fire sprinklers used to meet high-rise provisions. To create a 6,967 square foot office tenant space on the 8th floor. Work includes a 1-hr corridor, interior nonbearing walls, interior windows, interior doors, and a suspended ceilings all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-694-98 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  4/20/2007  
(F) Reprint permit  4/20/2007  
Permanent occupancy UNPAID FEE  11/9/1999 DONE
Perm. Occ. Cert. #7985 issued 11-4-99 to the Boise Chamber of Commerce.
FIRE-Final Inspection11/5/199911/5/199911/5/1999APASS
DetailsRick Jackson
Ok for occ. signed perm. col.
BLD-Final11/4/199911/4/199911/4/1999APASS
Details
Ok for occ.
Permanent Occupancy 11/4/199911/4/1999 DONE
Details
CHANGE STATUS TO (TMP)  10/29/1999 DONE
INSP - Final4/30/19995/3/19995/3/1999APART
DetailsRick Jackson
temp occ approved
INSP - Final4/30/19995/3/19995/3/1999APART
Details
made ok for temp occ with full time fire watch by the boise city fire dept. firefighter arrived at 8:30 this a.m. will be on site as long as tenants are in the building
Temporary occupancy  4/30/1999 PASS
Temp. Occ. Cert. #3830 issued 4-30-99 to the Boise Chamber of Commerce in the C.W. Moore Plaza Bldg.
INSP - Wall cover4/21/19994/21/19994/23/1999PPART
Details
04/26/99 338 - madeok to cover with other agencies
INSP - Wall cover4/12/19994/13/19994/13/1999APART
Details
04/13/99 338 - fail un apoproved st5uff for the wood protecton
INSP - Wall cover3/19/19993/19/19993/19/1999PPART
Details
03/19/99 338 - ok to cover
INSP - Framing/Rough-in3/12/19993/15/19993/15/1999PPART
DetailsJim Storey
03/15/99 301 - c/n isued ok to start gyp.
INSP-Conference3/8/19993/8/19993/8/1999 PART
Inspectors review of issued permits resubmittals. For changes in plans and wall placements possible relocation of exit signs, alarm strobes etc, some dampers will be moved also. Delivered same dto the jobsite and walked project with the super of project. STILL NO ALARM PLANS SUBMITTED FOR THIS TENANT.
Plan resubmittals received  3/5/1999
RECEIVED TWO COPIES OF REVISED DRAWINGS, ONE LETTER REGARDING REVISIONS, AND ONE MINI SET. ROUTED TO PERRY P. KMM
INSP-Conference3/4/19993/4/19993/4/1999APART
DetailsRick Jackson
profit meeting
INSP-Final Inspection2/10/19992/10/19992/10/1999PCANC
DetailsRick Jackson
###-#### mike wrong permit number called in
(F) Reprint permit  12/30/1998
Issue PAID IN FULL permit  12/10/1998
Telephone call  10/29/1998
CALLED TALKED TO OTTIS GAVE DOLLAR AMOUNT
Print Occupancy Form  10/29/1998
Inspection Record Card- Bld  10/29/1998
Plan assigned to (CJW)10/8/1998 10/29/1998 PASS
DetailsCarl Westfall
10/29/98 10:23:44 CJW - this action updated by action script from <<>> in Case No. BLD98-3053
PLANS/APPL TAKEN TO FRONT DESK  10/29/1998 PASS
Routing - PLAN CHECK10/21/1998 10/29/1998
Routing - FIRE10/19/1998 10/21/1998 PASS
Plan Review Completed(1st rev)  10/21/1998 PASS
Routing - PLAN CHECK10/9/1998 10/16/1998
testing condition printout  10/16/1998
Print permit w/o conditions  10/16/1998
Plan Reviewer's activity  10/15/1998 PASS
UBC plan review started Oct. 15, 1998 and finished Oct. 16, 1998. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS10/8/1998 10/9/1998 PASS
Plan routing begun/TENANTS  10/8/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Application received  10/6/1998