Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-03060
StatusFinaled
Name THORNTON-OLIVER-KELLER
Site Address 250 S 5TH ST Unit: 2 FLR
Project NameC W MOORE PLAZA-2ND
Customer Number 
ePlanReviewNo
Description
(THORNTON-OLIVER-KELLER) Fire sprinklers used to meet high-rise provisions. To create a 10,342 square foot office tenant space on the 2nd floor. This tenant will occupy the entire floor. Work is to include interior nonbearing walls, interior windows, interior doors, and suspended ceilings all per approved drawings and plan review conditions on file. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. PC-696-98 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  4/20/2007  
(F) Reprint permit  4/20/2007  
Case Summary (BLD)  3/6/2001  
(F) Reprint permit  1/30/2001 DONE
Fee Review-notes1/28/20001/28/20001/28/2000 DONE
additional value from GC
(F) Reprint permit  1/28/2000 DONE
Permanent occupancy  11/9/1999 DONE
Perm. Occ. Cert. #7984 issued 11-4-99 to Thornton Oliver Keller in the C W Moore Plaza.
FIRE-Final Inspection11/5/199911/5/199911/5/1999APASS
DetailsRick Jackson
Ok for occ. signed perm. col.
BLD-Final11/4/199911/4/199911/4/1999APASS
Details
Ok for occ.
Permanent Occupancy 11/4/199911/4/1999 DONE
Details
CHANGE STATUS TO (TMP)  10/29/1999 DONE
INSP - Final4/30/19995/3/19995/3/1999APART
Details
madeok to temporarily occupy with full time fire watch when tenants are in the building.
INSP - Final4/30/19995/3/19995/3/1999APART
DetailsRick Jackson
temp occ approved
INSP - Final4/30/19994/3/19994/30/1999PFAIL
Details
will reschedule for 05-03-99 7:a.m.
Temporary occupancy  4/30/1999 PASS
Temp. Occ. Cert. #3829 issued 4-30-99 to Thornton-oliver-Keller in the C.W. Moore Plaza Bldg.
INSP-Conference4/27/19994/27/19994/27/1999APART
DetailsRick Jackson
strobe to be changed to 75 cd in southwest open office
INSP-Conference3/4/19993/4/19993/4/1999APART
DetailsRick Jackson
profit meeting
INSP - Framing/Rough-in2/19/19992/25/19992/25/1999APART
Details
02/25/99 338 - made ok to cover with ele ok's need penes rechecked for t
Plan resubmittals received  2/19/1999
RECEIVED TWO COPIES PLUS ONE SMALL COPY OF REVISED SHEETS A0.1, A2.1, A3.1, A3.2, A4.1, M1.3. ONE COPY OF LETTER TO PERRY. ROUTED TO PERRY PAYNE. KMM
(F) Reprint permit  12/30/1998
Issue PAID IN FULL permit  12/10/1998
Print Occupancy Form  10/29/1998
Inspection Record Card- Bld  10/29/1998
Telephone call  10/29/1998
CALLED OTIS PERMIT READY
Print Occupancy Form  10/29/1998
PLANS/APPL TAKEN TO FRONT DESK  10/29/1998 PASS
Plan assigned to (CJW)10/8/1998 10/29/1998 PASS
DetailsCarl Westfall
10/29/98 10:28:33 CJW - this action updated by action script from <<>> in Case No. BLD98-3060
Routing - PLAN CHECK10/27/1998 10/29/1998
Routing - FIRE10/22/1998 10/27/1998 PASS
Plan Review Completed(1st rev)  10/27/1998 PASS
Routing - PLAN CHECK10/9/1998 10/21/1998
Print permit w/o conditions  10/21/1998
testing condition printout  10/21/1998
Plan Reviewer's activity  10/19/1998 PASS
UBC plan review started October 19, 1998 and finished October 21, 1998. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS10/8/1998 10/9/1998 PASS
Plan routing begun/TENANTS  10/8/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)10/6/1998 10/8/1998
DetailsMarlene Southard
Application received  10/6/1998
Recd Pcfee & Taken To Pln CK  10/6/1998