Permit Information
Permit NumberBLD98-03079
StatusExpired
Name RANDY LIMANI
Site Address 115 W MAIN ST
Project NameARTHUR BERRY-SHELL
Customer Number 
ePlanReviewNo
Description
ARTHUR BERRY OFFICE * TO CONSTRUCT A 15,056 SQ.FT. TWO STORY WITH BASEMENT OFFICE BUILDING ADDITION. This permit is for the shell and core. Basement is to be equiped with a fire sprinkler system. Construction is wood frame with floor and roof trusses. NO OCCUPANCY CERTIFICATE will be issued under this permit. Additional permits for tenant improvements are required. DRH98-0126 PC#700-98 GRADING PERMIT BLD98-2658 FOUNDATION PERMIT BLD98-2773 ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/22/2016 DONE
Case Summary (BLD)  7/3/2001 DONE
Case Summary (BLD)  7/3/2001 DONE
Receive PAYMENT IN FULL  4/14/2000 DONE
(F) Reprint permit  2/11/2000 DONE
Fee Review-notes10/27/1998 2/11/2000 DONE
Letter of compliance  12/2/1999 DONE
Letter of Compliance #18193 issued 12-2-99.
FIRE-Final Inspection11/29/199911/30/199911/30/1999APASS
DetailsRick Jackson
Rich ###-####
BLD-Final11/29/199911/30/199911/30/1999PFAIL
Details
Rich ###-#### Elec. Permits 99-00861 and 99-00894 not finaled; I have requested these finals in P.Plan system.
CHANGE STATUS TO (TMP)  10/29/1999 DONE
Temporary occupancy  7/6/1999 PASS
Temp. Occ. Cert. #3867 issued 7-6-99 to the Arthur Berry Ofc. Bldg. (shell).
INSP - Final6/29/19997/1/19997/1/1999PPART
Details
07/01/99 338 - made ok for temp
INSP-Final Inspection6/29/19997/1/19997/1/1999APART
DetailsRick Jackson
8:15 as per rick jackson rich ###-#### test elevator recall - temp occ approved
INSP-Conference6/25/19996/25/19996/25/1999AFAIL
DetailsRick Jackson
left c/n with general contractor
INSP-Final Inspection6/24/19996/24/19996/24/1999PFAIL
DetailsRick Jackson
alarms not complete; sprinkler problems; extinguishers; c/n issued
INSP - Final6/17/19996/18/19996/18/1999PFAIL
Details
06/18/99 338 - other agencies not approved
INSP-Final Inspection6/17/19996/18/19996/18/1999PFAIL
DetailsRick Jackson
Rich ###-#### rated corridor not complete; emergency lights and exit signs
INSP-Final Inspection6/16/19996/17/19996/17/1999AFAIL
DetailsRick Jackson
RICH ###-#### not a final inspection - reviewed requirements for shell occupancy and tenant for 2nd floor
INSP - Framing/Rough-in6/15/19996/16/19996/16/1999AFAIL
Details
06/16/99 338 - fyi c/n issued builder has all three copys for finall ins
Routing - FIRE6/10/1999 6/10/1999 PASS
FIRE ALARM PLANS REVIEWED WITH NOTES
INSP-Supply line flush5/21/19995/21/19995/21/1999APASS
DetailsRick Jackson
underground okay
INSP-Conference5/6/19995/6/19995/5/1999APASS
Details
with plan review on the resubmittal repairs of this project
Plan resubmittals received  5/4/1999 PASS
APPROVED RESUBMITTALS RECEIVED 4/30/99 SHEETS A2.0,A2.1,A2.2,A9.1 FOR CORRECTIONS AS REQUESTED BY M SOUTHARD FOR MODIFICATIONS TO STAIRWAYS AND 2ND FLOOR RATED CORRIDOR. LETTER OF EXPLANATION FROM THE ARCHITECT ATTACHED.
SUPER- Supervisor's review5/3/19995/3/19995/3/1999
finish still in progress not ready for final
SUPER- Supervisor's review5/3/19995/3/19995/3/1999
Plan resubmittals received  4/30/1999
RECEIVED TWO COPIES OF REVISED SHEETS A2.0, A2.1, A2.2, A9.1, PLUS COVER LETTER DATED 4-29-99. ROUTED TO MARLENE. KMM
INSP-Conference4/28/19994/28/19994/28/1999APART
DetailsRick Jackson
walk through of site with perry and contractor - reviewed plans; sprinkler plans not on site - requested
SUPER- Supervisor's review4/19/19994/19/19994/19/1999
still in progress working on finish
INSP - Framing/Rough-in3/17/19993/18/19993/18/1999AFAIL
Details
03/18/99 338 - other agencies not approved, approved plans not available
INSP - Framing/Rough-in2/12/19992/12/19992/12/1999 PART
Details
02/12/99 338 - ok for covr of the stair walls inside only
INSP - Framing/Rough-in2/5/19992/8/19992/8/1999AFAIL
Details
02/08/99 338 - c/n issued
INSP - Framing/Rough-in2/4/19992/5/19992/5/1999PFAIL
Details
02/05/99 338 - cancelled again by the contractor
INSP - Framing/Rough-in2/3/19992/4/19992/4/1999PFAIL
Details
02/04/99 338 - cancelled by the contractor
INSP - Framing/Rough-in1/21/19991/22/19991/22/1999PPART
Details
made ok to nail shear walls all nailing to be completed prior to the signoffs.
INSP - Framing/Rough-in12/29/199812/30/199812/30/1998AFAIL
Details
12/30/98 333 - not ready talked to Mike about stair, hoolddown and beari
SUPER- Supervisor's review11/23/199811/23/199811/23/1998
redwood sill plates installed basement frame started looks fine.
INSP - Foundation11/19/199811/20/199811/20/1998APASS
Details
11/20/98 333 - FDN -OK FOUNDATION
INSP - Framing/Rough-in11/13/199811/16/199811/16/1998APART
Details
11/16/98 333 - floor at crawl space area ok
Print Occupancy Form  11/9/1998
Telephone call  11/9/1998
called talked to rich judy and john price gave dollar amount/also told them they could not have permit until fees are paid through achd
PLANS/APPL TAKEN TO FRONT DESK  11/9/1998
Issue PAID IN FULL permit  11/9/1998
Inspection Record Card- Bld  11/9/1998
Inspection Record Card- Bld  11/9/1998
Plan assigned to (ADS)10/8/1998 11/9/1998 PASS
Details
Routing - PLANNING11/5/1998 11/6/1998 PASS
approved per DRH98-0126 and per resubmitted documents, dated 11-6-98.
Routing - PLAN CHECK10/16/1998 11/5/1998 PASS
Routing - FIRE11/3/1998 11/3/1998 PASS
Plan resubmittals received  11/2/1998
RECEIVED 2 COPIES OF REVISED SHEETS A0.0, A2.0, A2.1, A2.2, A2.3, A4.0, A4.1, A5.0, A5.1, A8.0, A8.1, A9.1, S1.1, S2.1, S3.1, S3.2, S3.3, S3.4, P.1, E1.0, E2.0, E3.0 ONE LETTER ADDRESSING PLAN CHENKL COMMENTS AND TWO COPIES OF SUPPLEMENTAL STRUCTURAL CALCULATIONS. ROUTED TO ARLAN. KMM
Plan Review Completed(1st rev)  10/15/1998 FAIL
planning, UBC and UFC issues
Routing - FIRE10/14/1998 10/15/1998 FAIL
elevator, stair enclosure and sprinkler issues
Routing - PLAN CHECK10/12/1998 10/14/1998 FAIL
Plan resubmittals requested  10/14/1998 FAIL
Initial plan review report faxed & mailed to architect.
Routing - PLANNING10/9/1998 10/12/1998 FAIL
Design Review conditions of approval #1a, !b, & 1c have not been met. Discussed with John Price October 12, 1998.
Routing - PLUMBING10/12/1998 10/12/1998 PASS
Routing - PUBLIC WORKS10/8/1998 10/9/1998 PASS
Plan routing begun/NEW & ADDTN  10/8/1998
Plan assigned to (MYS)10/7/1998 10/8/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  10/8/1998 PASS
NO ELEC. OR MECH. PLANS. NO OUTSIDE ENG. PACKAGE
Received Certificate of Value  10/8/1998 FAIL
REQUIRES ELEC. AND PLUMB. AND OR MECH. VALUES. CONTACTED MARK SANDERS OF THIS NEED. KMM
Application received  10/7/1998
Recd Pcfee & Taken To Pln CK  10/7/1998