To remodel a 7,723 sq.ft. space for new office tenant per approved plans on file. Work to include The removal of some walls and the construction of new walls, modifications and repairs to the suspended ceiling, all construction is to be of noncumbustible materials. Additional tenant seperatio walls are t be built. Modifications including new doors are to be made to the fire rated corridor. NOTE: This building is fully fire sprinklered. (P.C.#703-98) ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  10/21/1999 DONE
Perm. Occ. Cert. #7959 issued 10-21-99 to Dain Rauscher Investment Services.
Permanent Occupancy 10/4/199910/4/1999 DONE
Details
FIRE-Final Inspection10/1/199910/4/199910/4/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/01/1999 at 09:58:53. Contact: ###-####. Occupancy approved
INSP - Final8/30/19998/31/19998/31/1999AFAIL
Details
08/31/99 338 - DOOR CO-ORDINATOR WORK TO BE COMPLETED
INSP - Final8/16/19998/17/19998/17/1999AFAIL
Details
ele final not complete inspection fail SCOTT--###-#### FN OCC-WRIGHT BROTHERS-11TH FL-SUITE 1101
INSP-Final Inspection8/16/19998/17/19998/17/1999APASS
DetailsRick Jackson
Scheduled by Hello!. Contact phone is [3717155]. occupancy approved
Print Occupancy Form  8/11/1999
INSP-Alarm Testing8/9/19998/9/19998/9/1999APASS
DetailsRick Jackson
tested alarms for the new corridor - okay
SUPER- Supervisor's review5/11/19995/11/19995/11/1999
still in progress slow
SUPER- Supervisor's review3/30/19993/30/19993/30/1999
finishing corridor to provide protection while completing interior space.
INSP - Final3/26/19993/26/19993/26/1999P
Details
###-#### PAUL//TEMP OCCUPY 11TH FLOOR #1101
INSP - Framing/Rough-in3/17/19993/17/19993/17/1999P
Details
###-#### 11th floor
SUPER- Supervisor's review3/9/19993/9/19993/9/1999
framing door in west corridor for fire resistance. to be maintained while remodel is continuing. corridor fire resistance to be maintained
INSP - Final3/1/19993/2/19993/2/1999PPART
Details
03/02/99 338 - NOT READY FOR FINAL INSP MUST HAVE CORRIDORS COMPLETED PR
INSP-Conference3/2/19993/2/19993/2/1999PPART
DetailsRick Jackson
discussed with Perry and George about requirements for corridor and tenant space - corridor must be complete before occ
SUPER- Supervisor's review3/2/19993/2/19993/2/1999
exit door (new) cut into stair enclosier will be in direct conflict with existing exit door and will not be exceptable as detailed
INSP-Conference1/21/19991/21/19991/21/1999APART
DetailsRick Jackson
requested alarm submittals, reviewed corridor protection with Perry, info needed on exit and emergency lighting signs
INSP - Conference1/20/19991/20/19991/20/1999 PART
Details
/ / 338 - MADE OK NEED TO POSWTPONE INSP UNTIL THE APPROVED PLANS ARE
INSP - Conference1/19/19991/19/19991/19/1999 PART
Details
/ / 338 - WITH SUPER WILL INSPECT AFTER CONFER WITH 337 AND 407
Issue PAID IN FULL permit  12/22/1998
(F) Reprint permit  12/22/1998
Inspection Record Card- Bld  12/21/1998
Telephone call  12/21/1998
CALLED PERMIT READY
Print Occupancy Form  12/21/1998
PLANS/APPL TAKEN TO FRONT DESK  12/21/1998 PASS
Plan assigned to (ADS)10/9/1998 12/21/1998 PASS
Details
12/21/98 07:31:10 ADS - this action updated by action script from <<>> in Case No. BLD98-3091
Routing - PLAN CHECK10/19/1998 12/21/1998 PASS
Routing - FIRE12/18/1998 12/18/1998 PASS
rec'd resubmittal by email
Received Certificate of Value  12/17/1998
12-16-98 RECEIVED ONE DEMO CERT. PLUS A REVISED CERT. OF VALUE. ROUTED TO ARLAN SMITH. KMM
Routing - FIRE12/11/1998 12/15/1998 FAIL
no response to corridor protection item B and vav's have not been demonstrated to be equivalent to 26 ga solid duct.
Plan resubmittals received  12/11/1998
RECEIVED TWO COPIES OF SHEETS M-1 ROUTED TO ARLAN.
Routing - FIRE10/15/1998 10/16/1998 FAIL
corridor extension is not rated, floor now multi-tenant.
Plan Review Completed(1st rev)  10/16/1998 FAIL
UFC issues
Routing - PLAN CHECK10/9/1998 10/15/1998 PASS
Approved with correction attached to the plans.
Plan assigned to (MYS)10/8/1998 10/9/1998
DetailsMarlene Southard
Plan routing begun/TENANTS  10/9/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Routing - PUBLIC WORKS10/9/1998 10/9/1998 PASS
Application received  10/8/1998
Recd Pcfee & Taken To Pln CK  10/8/1998