Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD98-03112
StatusFinaled
Name STOR-IT MINI STORAGE
Site Address 600 N MAPLE GROVE RD
Project NameSTOR-IT MINI STORAGE
Customer Number 
ePlanReviewNo
Description
STOR-IT MINI STORAGE * (SECTION 1 0F 2) A FOUR-HOUR AREA SEPARATION WALL WILL DIVIDE THIS BUILDING INTO TWO SEPARATE BUILDINGS. TO ADD APPROXIMATELY 7800 SQ.FT OF NEW STORAGE AREA TO THE EXISTING 2186 SQ.FT. OFFICE AREA. THIS IS A SINGLE STORY WOOD FRAMED TYPE V NONRATED STRUCTURE. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1994 EDITION OF THE UBC. MJP DR-147-94 PC#707-98 Refer to Bld98-3320 for the additional permit related to this project.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled1/18/20011/18/20011/18/2001PPASS
DetailsRuss Owen
Added by Inspector: 407 On 1/18/2001 4:28:42 PM
INSP - Framing/Rough-in4/22/19994/26/19994/27/2000PFAIL
DetailsCarl Dependahl
04/26/99 340 - ###-#### GEORGE//ROOF COVER; need nails aT BLOCKING
Fee Review-notes3/3/1999 8/24/1999
INSP - Final6/3/19996/3/19996/3/1999 PASS
DetailsCarl Dependahl
06/03/99 340 - ###-#### PGR//FINAL AS EARLY AS POSSIBLE card to cont.
INSP - Final6/2/19996/3/19996/3/1999APASS
DetailsCarl Dependahl
06/03/99 340 - ###-#### PGR//FINAL AS EARLY AS POSSIBLE
INSP - Final6/2/19996/2/19996/2/1999 PART
DetailsJim Storey
06/01/99 301 - temp ok pending p/z
INSP - Final6/2/19996/2/19996/2/1999 PART
DetailsJim Storey
06/01/99 301 - temp ok pending p/z
INSP-Final Inspection5/28/19996/1/19996/1/1999APASS
DetailsJoe Tawney
06/01/99 406 - REINSP OK FOR PERM OCC
SUPER- Supervisor's review6/1/19996/1/19996/1/1999
stor more units finishing up ok
INSP - Final5/26/19995/27/19995/27/1999PFAIL
DetailsCarl Dependahl
05/27/99 340 - Georege###-####
INSP-Final Inspection5/26/19995/27/19995/27/1999PFAIL
DetailsJoe Tawney
05/27/99 406 - REINSP FAIL FIRE EXT FD ACCESS
INSP-Final Inspection5/18/19995/18/19995/18/1999 FAIL
DetailsJoe Tawney
05/18/99 406 - FINAL FAIL PLAN REV NOTES, DOOR HDWRE, FIRE EXT
INSP - Framing/Rough-in5/7/19995/10/19995/11/1999PPART
DetailsCarl Dependahl
05/10/99 340 - framing/George ###-####;anchors added, ok to delete ledge
INSP - Framing/Rough-in5/4/19995/5/19995/5/1999AFAIL
DetailsRuss Owen
05/05/99 407 - has correction notice.
INSP - Framing/Rough-in4/12/19994/13/19994/16/1999APART
DetailsCarl Dependahl
04/13/99 340 - ###-#### GEORGE//PARTIAL ROOF COVER, roof deck ok; need f
INSP - Concrete4/2/19994/7/19994/7/1999APART
DetailsCarl Dependahl
04/07/99 340 - ###-#### GEORGE//GROUTING CMU WALLS, 2nd lift, so. wall
INSP - Concrete4/2/19994/6/19994/6/1999ANR
DetailsTom Arcoraci
###-#### GEORGE//GROUTING CMU WALLS
INSP - Foundation4/6/19994/6/19994/6/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF. ONLY W/ SUPT RE MASONRY AT SOUTH WALL
INSP - Concrete4/2/19994/5/19994/5/1999APART
DetailsCarl Dependahl
04/05/99 340 - ###-#### GEORGE//GROUTING CMU WALLS; 1ST LIFT, SOUTH WALL
INSP - Framing/Rough-in4/2/19994/2/19994/2/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF RE EAST UNITS, OK TO ROOF TO AREA WALL
INSP - Framing/Rough-in3/26/19993/30/19993/30/1999AFAIL
DetailsCarl Dependahl
03/30/99 340 - ###-#### GEORGE//RI FRAMING storage units east side, nail sheathing at sills, add straps at butt jts
INSP - Framing/Rough-in3/29/19993/29/19993/29/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF ONLY W/ FRAMER
INSP - Framing/Rough-in3/22/19993/22/19993/22/1999APART
DetailsCarl Dependahl
office only ok to cover
INSP - Concrete3/19/19993/22/19993/22/1999APART
DetailsCarl Dependahl
03/22/99 340 - ###-#### GEORGE//CEMENT SLAB
INSP - Framing/Rough-in3/19/19993/22/19993/22/1999APART
DetailsCarl Dependahl
03/22/99 340 - ###-#### GEORGE//FINAL FRAMING COVER IN OFFICE office ok to cover
INSP - Framing/Rough-in3/17/19993/18/19993/18/1999AFAIL
DetailsCarl Dependahl
03/18/99 340 - ###-#### GEORGE//PARTIAL COVER OFFICE AREA CN, SHEAR PANELS, OK TO COVER AS NOTED
INSP - Concrete3/15/19993/16/19993/16/1999APART
DetailsCarl Dependahl
03/16/99 340 - ###-#### george SLABS
INSP - Final3/10/19993/12/19993/12/1999AFAIL
DetailsCarl Dependahl
03/12/99 340 - ###-#### GEORGE//FINAL FRAMING IN OFFICE AREA not a final, nr
INSP - Concrete3/10/19993/11/19993/11/1999APART
DetailsCarl Dependahl
03/11/99 340 - int sep wall, 2nd lift
INSP - Concrete3/11/19993/11/19993/11/1999PPART
DetailsCarl Dependahl
MASONARY WALLS\\###-####...cross wall, 2nd lift ok
INSP - Concrete3/8/19993/8/19993/8/1999PPART
DetailsCarl Dependahl
LATE AFTERNOON GEORGE ###-####...part, masonry at west wall, not complete.
INSP - Framing/Rough-in3/5/19993/5/19993/5/1999 PART
INSP - Framing/Rough-in3/5/19993/5/19993/5/1999 PART
DetailsJim Sly
03/05/99 316 - Roof nailing.....OK
INSP - Framing/Rough-in3/4/19993/5/19993/5/1999APART
DetailsJim Sly
03/05/99 316 - Roof nailing only....OK
INSP - Concrete2/16/19992/18/19992/18/1999PFAIL
DetailsJim Sly
02/18/99 316 - slab George ###-#### or ###-#### pager. If rains, will p friday No one at jobsite.
INSP - Concrete2/12/19992/16/19992/16/1999APART
DetailsCarl Dependahl
02/16/99 340 - ###-#### geroge\\###-#### pager\\\stor-it met w/ supt at
INSP - Concrete2/12/19992/12/19992/12/1999 PART
DetailsCarl Dependahl
02/12/99 340 - slab george ###-####-###-#### pager
INSP - Foundation1/28/19991/28/19991/28/1999 PART
DetailsCarl Dependahl
/ / 340 - frost wall ok
INSP - Wall cover1/27/19991/28/19991/28/1999ACANC
DetailsCarl Dependahl
01/28/99 340 - GEORGE..###-####
INSP - Foundation1/25/19991/27/19991/27/1999ANR
DetailsCarl Dependahl
01/27/99 340 - george ###-####, gave to 338
INSP - Foundation1/19/19991/19/19991/19/1999PPART
DetailsTom Arcoraci
01/19/99 408 - GEORGE ###-#### OR ###-#### OFFICE FOUNDATION wall at office ok
INSP - Foundation1/12/19991/14/19991/14/1999ACANC
DetailsTom Arcoraci
01/14/99 408 - GEORGE ###-#### OR ###-#### done by 338
INSP - Foundation1/11/19991/12/19991/12/1999APART
Details
01/12/99 338 - made ok to pour r-bar is placed and weather protection is
INSP - Foundation1/7/19991/8/19991/8/1999APART
Details
01/08/99 338 - madeok to pour concrete with r- bar placed
INSP - Foundation1/6/19991/7/19991/7/1999APART
Details
01/07/99 338 - made ok to pour with the r-bar placed
INSP - Foundation12/14/199812/15/199812/15/1998PFAIL
Details
12/15/98 338 - JIM..###-#### PAGER no call from contr poured w/o insp
Issue PAID IN FULL permit  11/20/1998
Print Occupancy Form  11/13/1998
Telephone call  11/13/1998
CALLED LEFT MESSAGE W/TRENT GAVE DOLLAR AMOUNT/NEEDS ACHD FEES PAID OR WAIVED.
Plan Reviewer's activity  11/13/1998 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/13/1998 PASS
Print Pending Permit.LaserJet4  11/13/1998 PASS
Inspection Record Card- Bld  11/13/1998
Plan assigned to (M_P)10/9/1998 11/13/1998 PASS
DetailsMike Phillips
11/13/98 08:25:50 M_P - this action updated by action script from <<>> in Case No. BLD98-3112
Received Certificate of Value  11/12/1998 PASS
Received up dated certificate.
Plan resubmittals received  11/6/1998
RECEIVED STAMPED AND SIGNED TWO COPIES OF REVISED PRINTS WITH CORRECTED STRUCTURAL DEFICIENCIES. TWO CERT. OF VALUE FORMS FOR 7800 S.R. BLDG. AND 1300 S.F. BLDG. TWO REVISED STRUCTURAL CALC'S. ROUTED TO MIKE P. KMM
Routing - FIRE10/23/1998 10/27/1998 PASS
access not impacted by addition from phase 1 requirements
Plan Review Completed(1st rev)  10/27/1998 FAIL
ubc issues
Plan resubmittals requested  10/23/1998 FAIL
Requested complete set of structural calculations and details to reflect this building.
Print Pending Permit.LaserJet4  10/23/1998 FAIL
Routing - PLANNING10/12/1998 10/20/1998 PASS
approved per DR-147-94 and modification.
Plans ACCEPTED BY PLAN TECH  10/12/1998 PASS
10-09-98 REQUIRES STRUCT. CALCS. CONTACTED TRENT KOCI TO LET HIM KNOW OF THIS NEED. 10-12-98 RECEIVED STRUCT. CALCS. ROUTED TO MIKE P.
Routing - PUBLIC WORKS10/9/1998 10/12/1998 PASS
Plan routing begun/NEW & ADDTN  10/9/1998 PASS
WILL ROUTE TO PW EVEN THOUGH I HAVE NOT RECEIVED STRUC. CALCS.
Received Certificate of Value  10/9/1998 PASS
Plan assigned to (MYS)10/8/1998 10/9/1998
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK  10/8/1998
Application received  10/8/1998