INSP - Final | 7/26/1999 | 7/27/1999 | 7/27/1999 | A | PASS |
Tom Arcoraci
|
|
|
07/27/99 408 - PAT ###-#### REINSPECTION FIRST THING IN THE AM IF POSSIB ELECTRIC FINAL DID PASS, STICKER ON THE PANEL.
|
INSP - Final | 7/26/1999 | 7/26/1999 | 7/26/1999 | P | FAIL |
Tom Arcoraci
|
|
|
07/26/99 408 - key in the weather protected panel joe ###-#### as soon a possible
|
INSP - Final | 5/21/1999 | 5/21/1999 | 5/21/1999 | P | FAIL |
Jim Sly
|
|
|
05/21/99 316 - C/N...Need electr final and Misc.......
|
INSP - Final | 3/25/1999 | 3/25/1999 | 3/25/1999 | P | CANC |
Jim Sly
|
|
|
03/25/99 316 - Done by Tom
|
INSP - Energy code compliance | 2/8/1999 | 2/8/1999 | 2/8/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 2/5/1999 | 2/5/1999 | 2/5/1999 | P | PASS |
Jim Sly
|
|
|
02/05/99 316 - OK to cover per Bob A.
|
INSP - Framing/Rough-in | 2/3/1999 | 2/4/1999 | 2/4/1999 | A | FAIL |
Jim Sly
|
|
|
02/04/99 316 - C/N...Unable to see straps or shear wall nailing......(si
|
SUPER- Supervisor's review | 2/4/1999 | 2/4/1999 | 2/4/1999 | | PASS |
|
|
|
Shear requirements.
|
INSP - Framing/Rough-in | 2/1/1999 | 2/1/1999 | 2/1/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - ok to insulate only.
|
INSP - Framing/Rough-in | 1/29/1999 | 1/29/1999 | 1/29/1999 | A | FAIL |
Jim Sly
|
|
|
01/29/99 316 - C/N...No appr plans
|
INSP - Framing/Rough-in | 1/27/1999 | 1/28/1999 | 1/28/1999 | A | FAIL |
Jim Sly
|
|
|
01/28/99 316 - C/N...No evidence of shear insp...Need appr plans for fra
|
INSP - Foundation | 10/27/1998 | 10/27/1998 | 10/27/1998 | P | FAIL |
Jim Sly
|
|
|
10/27/98 316 - Poured W/O insp...No cont footing per plan....
|
Issue PAID IN FULL permit | | | 10/26/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 10/13/1998 | | 10/23/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/23/1998 | | |
|
|
|
|
Plan assigned to (ADS) | 10/22/1998 | | 10/23/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/23/1998 | | |
|
|
|
|
Telephone call | | | 10/23/1998 | | |
|
|
|
CALLED GAVE DOLLAR AMOUNT
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/1998 | | |
|
|
|
|
Plan assigned to (DJO) | 10/8/1998 | | 10/22/1998 | | PEND |
Dan Overy
|
|
|
|
Routing - PLANNING | 10/12/1998 | | 10/12/1998 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/8/1998 | | 10/12/1998 | | PASS |
|
|
|
|
Application received | | | 10/8/1998 | | |
|
|
|
|