INSP - Final | 6/23/1999 | 6/23/1999 | 6/23/1999 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP - Final | 6/22/1999 | 6/23/1999 | 6/23/1999 | P | PASS |
Carl Dependahl
|
|
|
06/23/99 340 - SHELL BLDG. Contact phone is [8693080].
|
INSP - Framing/ Rough-in | 6/22/1999 | 6/22/1999 | 6/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FILED TRUSS ENG'G & SPEC INSP LOGS
|
INSP - Final | 6/16/1999 | 6/16/1999 | 6/16/1999 | | FAIL |
Joe Tawney
|
|
|
/ / 406 - FINAL FAIL ALARM SYSTEM
|
INSP - Final | 6/15/1999 | 6/16/1999 | 6/16/1999 | P | FAIL |
Carl Dependahl
|
|
|
06/16/99 340 - Scheduled by Hello!. Contact phone is [8693080].
|
Code Occupancy Approval | | | 5/17/1999 | | |
|
|
|
Final Occupancy requested by Jim, ###-####
|
INSP - Framing/Rough-in | 4/26/1999 | 4/27/1999 | 4/27/1999 | A | PART |
Carl Dependahl
|
|
|
04/27/99 340 - CLG OK WEST SIDE, REC'D SPEC INSP REPORTS FOR STRUCT. OK
|
INSP-Supply line flush | 3/30/1999 | 3/30/1999 | 3/30/1999 | P | PART |
Joe Tawney
|
|
|
03/30/99 406 - OK ON SUPPLY LINE FLUSH
|
INSP - Framing/Rough-in | 3/26/1999 | 3/29/1999 | 3/29/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/29/99 340 - c/n, need spec insp reports, roof calcs, elec r/i...ok to
|
INSP-Supply line flush | 3/26/1999 | 3/29/1999 | 3/29/1999 | P | PART |
Joe Tawney
|
|
|
03/29/99 406 - OK FOR UNDERGROUND HYDRO TEST
|
INSP - Framing/Rough-in | 3/5/1999 | 3/8/1999 | 3/8/1999 | A | PART |
Carl Dependahl
|
|
|
03/08/99 340 - pend spec insp, roof deck
|
INSP - Foundation | 2/5/1999 | 2/5/1999 | 2/5/1999 | P | PART |
Carl Dependahl
|
|
|
02/05/99 340 - Petra fnd wall east side ok
|
INSP - Foundation | 2/4/1999 | 2/5/1999 | 2/5/1999 | A | PART |
Carl Dependahl
|
|
|
02/05/99 340 - Scheduled by Hello!. Contact phone is [8693080]. pilaste
|
INSP - Foundation | 2/1/1999 | 2/3/1999 | 2/3/1999 | A | PART |
Carl Dependahl
|
|
|
02/03/99 340 - Scheduled by Hello!. Contact phone is [8693080]. part, e good!
|
INSP - Foundation | 2/1/1999 | 2/2/1999 | 2/2/1999 | A | PART |
Carl Dependahl
|
|
|
02/02/99 340 - Scheduled by Hello!. Contact phone is [8693080]. ftgs, p
|
INSP - Foundation | 1/29/1999 | 1/29/1999 | 1/29/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - fnd wall, pending spec insp report, took for wes,
|
INSP - Foundation | 1/28/1999 | 1/29/1999 | 1/29/1999 | A | FAIL |
Wes Worcester
|
|
|
01/29/99 342 - Scheduled by Hello!. Contact phone is [8693080]. given t
|
INSP - Foundation | 1/25/1999 | 1/26/1999 | 1/26/1999 | A | PART |
|
|
|
made ok to pour the north wall for the found
|
INSP - Foundation | 1/21/1999 | 1/22/1999 | 1/22/1999 | A | PART |
Russ Owen
|
|
|
01/22/99 407 - will change out some number #4 with #5 uprights between c
|
INSP - Foundation | 1/18/1999 | 1/19/1999 | 1/19/1999 | A | PART |
Tom Arcoraci
|
|
|
01/19/99 408 - Scheduled by Hello!. Contact phone is [8693080]. north side footing ok
|
INSP-Sprinkler Rough-in/Hydro | 1/8/1999 | 1/8/1999 | 1/8/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON UNDERGROUND PIPE INSPECTION OK TO COVER
|
Print Occupancy Form | | | 12/28/1998 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/28/1998 | | |
|
|
|
|
(F) Reprint permit | | | 11/25/1998 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/24/1998 | | |
|
|
|
|
Plan assigned to (JCM) | 11/10/1998 | | 11/13/1998 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/13/1998 | | 11/13/1998 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 11/13/1998 | | |
|
|
|
|
Print Occupancy Form | | | 11/13/1998 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 11/12/1998 | | PASS |
|
|
|
|
Routing - FIRE | 11/6/1998 | | 11/12/1998 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/6/1998 | | 11/10/1998 | | |
|
|
|
SENT OUR COPY TO CH2MHILL, DONE BY JOHN LEVIEN AS THEY HAD MISPLACED THE PREVIOUS COPY SENT TO THEM. DAR 11/06/98. SENT BY PDQ CH2MHILL RETURNED OUR COPY OF THE PLANS 11/10/98 DAR
|
Routing Off Site - STRUCTURAL | 10/20/1998 | | 11/10/1998 | | |
|
|
|
GAVE PLANS TO JOHN M TO DECEIDE IF OUTSIDE ENG. REQUIRED. KMM CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL FOR OUTSIDE ENG. PDQ CONFIRMS THAT THE DELEVERY WAS MADE ON 10/20 BUT CH2MHILL HAS NO KNOWLEGDE OF RECIEVING THEM. THEREFORE OUR SECOND SET IS BEING RESENT WITH THE INSTRUCTION THAT THEY BE RETURNED WHEN THE REVIEW IS COMPLETED. JML 11/6/98
|
Plan assigned to (JML) | 10/20/1998 | | 11/10/1998 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 11/5/1998 | | 11/5/1998 | | PEND |
|
|
|
NEEDS FIRE AND OUTSIDE STRUCTURAL APPROVAL
|
Routing - PLUMBING | 10/29/1998 | | 11/4/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/30/1998 | | |
|
|
|
RECEIVED REVISED SHEETS L1.1, L1.2, A2.0, A2.2, A4.0, A5.0, M1.2 AND ONE COPY OF SOILS REPORT. ROUTED TO JOHN L. KMM
|
Routing - PUBLIC WORKS | 10/22/1998 | | 10/29/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 10/29/1998 | | 10/29/1998 | | PASS |
|
|
|
approved per DRH98-0154.
|
Telephone call | | | 10/28/1998 | | FAIL |
|
|
|
I CONTACTED THE ARCH ASKING FOR TWO SEPARATE CERT OF VALUE/ ONE FOR SHELL/ ONE FOR FAMOUS FOOTWEAR TENANT
|
Routing - PLAN CHECK | 10/20/1998 | | 10/21/1998 | | FAIL |
|
|
|
needs arch resub. faxed and mailed review findings
|
Plans ACCEPTED BY PLAN TECH | | | 10/20/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 10/20/1998 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 10/20/1998 | | 10/20/1998 | | PASS |
John Menard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/20/1998 | | PASS |
|
|
|
|
Application received | | | 10/19/1998 | | PASS |
|
|
|
10-19-98 REQUIRES RECORD DECLARATION FORM. FAXED ONE TO SCOTT HENSON 10-23-98 RECEIVED RECORD DECLARATION FORM. PUT WITH JOHN L. DESK AND ONE IN FILE. KMM
|
INSP - Concrete | 1/13/1999 | 1/14/1999 | 1/14/1998 | A | PASS |
|
|
|
01/14/99 338 - made ok to pour concrete on the inner col footings r-bar
|