Case Summary (BLD) | | | 3/11/2014 | | DONE |
|
|
|
|
Fee Review-notes | 6/20/2003 | 6/20/2003 | 6/20/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/20/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8794 issued 8-20-01 to the Idaho Elks Rehabilitation Hospital.
|
BLD-Conference | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/15/2001 5:47:32 PM w/Tim, c/n ok.
|
Permanent Occupancy | | 8/15/2001 | 8/15/2001 | | DONE |
|
|
|
|
BLD-Final | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Carl Dependahl
|
|
|
Tim Wilcomb, ###-#### - all items are now finished - reinspect; c/n ok...ok for c/o 8/16/2001 10:55:48 AM
|
BLD-Conference | 8/3/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/3/2001 8:13:49 AM w/ Cathy W. re status of c/n..will chk w/ contractor.
|
BLD-Conference | 7/11/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/11/2001 9:07:52 AM w/GS...need inform Wilcomb that c/n in effect and req's response ASAP.
|
BLD-Final | 6/20/2001 | 6/20/2001 | 6/20/2001 | A | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/20/2001 9:21:33 AM c/n issued per G.S...ADA restrms 1st fl...boots at traps, w.c.to wall< 18" at 3rd fl; door at stair enclosure undercut at 3rd fl... astragal or? at 1st fl stair.
|
BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 | A | CANC |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/6/2001 11:09:54 AM rec'd eng's letter
|
BLD-Final | 5/21/2001 | 5/24/2001 | 5/24/2001 | P | FAIL |
Carl Dependahl
|
|
|
Please call Tim Wilcomb @ ###-#### 1st so he can meet you there...c/n need all plans/ notes 5/25/2001 11:03:26 AM
|
BLD-Conference | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/24/2001 4:19:09 PM w/ Mike of Jordan-Wilcomb
|
FIRE-Final Inspection | 5/7/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | PASS |
Jim Storey
|
|
|
###-#### ceilling on 1 and 4 floors at main entry ceilling ok. 3/26/2001 9:55:44 AM
|
Override - Parcel Holds | | | 3/23/2001 | | |
|
|
|
|
BLD-Conference | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Carl Dependahl
|
|
|
ceiling insp and conference ###-####...submit as built for floor/curtain wall detail by arch. 3/16/2001 12:13:49 PM
|
BLD-Framing/Rough-in | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/16/2001 12:19:27 PM north side elev lobby grid & walls ok
|
Override - Parcel Holds | | | 3/15/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | CANC |
Tony Young
|
|
|
ceiling seismic Mike Mason ###-####
Carl will do 3/14/2001 1:02:14 PM
|
Override - Parcel Holds | | | 3/13/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 3/9/2001 | 3/12/2001 | 3/12/2001 | A | CANC |
Tony Young
|
|
|
###-####
Carl has scheduled to go this afternoon per contractor, thanks Carl !!!! 3/12/2001 12:30:20 PM
|
BLD-Conference | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/12/2001 4:39:24 PM w/ arch, Steve Turney re curtain wall/ floor firestop, keep c/n....Contractor to recall insp
|
Override - Parcel Holds | | | 3/9/2001 | | |
|
|
|
|
BLD-Conference | 1/2/2001 | 1/2/2001 | 1/2/2001 | P | PASS |
George Slane
|
|
|
PROPANE EXPLOSION REAR STORAGE PORTION OF NEW ELKS REHAB BUILDING. WALL IN CONOPY AREA DISPLACED OVER 3 FEET, ONE SET OF DOUBLE DOORS BLOWN OFF WALL, MAJOR DAMAGE TO 2 EXTERIOR WALLS AND 2 INTERIOR WALLS AND CEILING. OK TO CLEAR AND STATE REBUILD ONCE FIRE AND POLICE COMPLETE INVESTIGATIONS AND RELEASE. OSHA IS ALSO IVOLVED. ONE WORKMAN INJURED.
|
Fee Review-notes | 8/31/2000 | 8/31/2000 | 11/27/2000 | | DONE |
|
|
|
|
Voucher Form | | | 8/31/2000 | | DONE |
|
|
|
|
Voucher Form | | | 8/30/2000 | | DONE |
|
|
|
|
Voucher Form | | | 8/30/2000 | | DONE |
|
|
|
|
Voucher Form | | | 8/30/2000 | | DONE |
|
|
|
|
FIRE-Conference | 5/17/2000 | 5/17/2000 | 5/17/2000 | A | PART |
Rick Jackson
|
|
|
|
BLD-Final | 5/12/2000 | 5/16/2000 | 5/16/2000 | A | PART |
|
|
|
###-#### GREEN MARKED AREAS OK FOR TEMP POOL AREA STILL NEED FINAL ON THE POOL 5/17/00 2:57:17 PM
|
FIRE-Final Inspection | 5/12/2000 | 5/16/2000 | 5/16/2000 | A | PART |
Rick Jackson
|
|
|
###-#### Shell okay; exiting issued. 5/17/00 1:53:56 PM
|
FIRE-Sprinkler Rough-in | 5/9/2000 | 5/11/2000 | 5/11/2000 | A | NR |
Rick Jackson
|
|
|
Mike ###-#### Will reschedule. 5/12/00 8:42:50 AM
|
Temporary occupancy | | | 4/17/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4006 issued 4-17-00 to the Idaho Elks PM & R.
|
FIRE-Final Inspection | 4/14/2000 | 4/14/2000 | 4/14/2000 | P | PART |
Rick Jackson
|
|
|
okay to occupy 2nd floor a nad b areas only
|
BLD-Final | 4/12/2000 | 4/14/2000 | 4/14/2000 | P | PART |
|
|
|
Scheduled by Inspector: 338 On 04/12/2000 per mike made ok for temp on this section of 2rd and 2nd floors 04/17/2000
|
FIRE-Conference | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | NR |
Rick Jackson
|
|
|
Mike ###-#### Contractor called- not ready- door hardware 4/14/00 11:00:46 AM
|
BLD-Final | 4/7/2000 | 4/12/2000 | 4/12/2000 | A | FAIL |
|
|
|
###-#### need other agencies signoffs 04/12/2000
|
FIRE-Final Inspection | 4/7/2000 | 4/11/2000 | 4/11/2000 | A | FAIL |
Rick Jackson
|
|
|
###-#### Rated doors; exit signs; extinguishers; stail enclosures. 4/17/00 1:55:45 PM
|
BLD-Conference | 3/28/2000 | 3/29/2000 | 3/29/2000 | P | PART |
|
|
|
###-#### conf with 337, mike (jw) rob (me), rep of (tml) on the return air in the corridors, all area above ceiling cannot be used as a plenun -no execptions 3/30/00 10:11:29 AM
|
FIRE-Conference | 3/28/2000 | 3/29/2000 | 3/29/2000 | P | PART |
Rick Jackson
|
|
|
###-#### OK to keep fire damper at elevator machine room 3/30/00 11:03:02 AM
|
BLD-Conference | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
|
|
|
mike mason ###-#### with 409 and mike on the temp occ of portions of the 2nd and 3rd floors, exit signage etc 03/27/2000 3:46:56 PM
|
FIRE-Conference | 3/27/2000 | 3/27/2000 | 3/27/2000 | A | PART |
Rick Jackson
|
|
|
discussed exit signs for 2 and 3 floors for phasing occupancy
|
BLD-Final | 3/17/2000 | 3/20/2000 | 3/20/2000 | A | PART |
|
|
|
###-#### exit sign clarification needed 03/20/2000 1:25:05 PM
|
BLD-Final | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PART |
|
|
|
blue markings on the ele plans are ok per discussion with drs each plan sheet is signed by me 03/21/2000 7:11:51 AM
|
Temporary occupancy | | | 3/20/2000 | | PART |
|
|
|
Temp. Occ. Cert. #3993 issued 3-20-00 to Intermountain Orthopedics in the Elks Rehabilitation Hospital.
|
FIRE-Final Inspection | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PART |
Rick Jackson
|
|
|
###-#### mike Phase 1 ok. 3/20/00 10:27:34 AM
|
BLD-Final | 3/13/2000 | 3/16/2000 | 3/16/2000 | A | FAIL |
|
|
|
Mike Mason ###-#### no one on site for insp 03/17/2000 9:08:19 AM
|
FIRE-Final Inspection | 3/13/2000 | 3/16/2000 | 3/16/2000 | A | PART |
Rick Jackson
|
|
|
Mike Mason ###-#### phase 1 okay
|
BLD-Framing/Rough-in | 2/2/2000 | 2/4/2000 | 2/4/2000 | A | PART |
|
|
|
ceiling grid insp--mike ###-#### ok to start laying in tiles as work proceeds in the first phase 2/10/00 10:17:50 AM
|
FIRE-Conference | 1/20/2000 | 1/21/2000 | 1/21/2000 | A | PART |
Rick Jackson
|
|
|
Mike Mason ###-#### Dampers require access doors; some not working. 1/21/00 1:54:25 PM
|
Override - Parcel Holds | | | 1/20/2000 | | |
|
|
|
|
BLD-Conference | 1/14/2000 | 1/18/2000 | 1/18/2000 | A | PART |
|
|
|
at 9am Mike Mason ###-#### with mike and tim with jordan, with ymc and with bargreen ellison also isi 1/18/00 12:01:56 PM
|
BLD-Conference | 1/14/2000 | 1/18/2000 | 1/18/2000 | A | PASS |
|
|
|
###-####--mike for conf
|
BLD-Conference | 11/28/1999 | 12/28/1999 | 12/28/1999 | P | PART |
|
|
|
with mike with jordan wilcomb and ken with ymc the mech contractor, on the requirements for the domestic close dryer duct/vent penetrations of the 2-hour rated shaft. some protective work was done without approvals or resubmittals to the building dept. We discussed the required submittals for these changes. Contractors are submit assemblies for the penetrations and the type of ducting that is allowed for a domestic dryer with a booster fan. also the proper terminatio of the required rated construction of the shaft protection as the duct cannot have a fire/smoke damper.
|
BLD-Conference | 12/8/1999 | 12/8/1999 | 12/8/1999 | A | FAIL |
|
|
|
with arch steve turney on the submittals from the mech eng stating that with the eng seal that all would be well. I asked before I approved the submittal that the calculations done to arrive at the conclusion that the booster fan for the oversized over length to this date un approved spiral ducting that is proposed would be acceptable per the uniform mechanical code 1997. Also discussion on the rejection of the submittal for u.l. assembly for the penetration of this same duct through an required 2-hour shaft. it is ul/cul system no. wl7040. As this system utilizes #8x 3/4 sheet metal screws, and the umc states in 504.3.2 that " ducts for exausting clothes dryers shall not be connected or installed with sheet metal screws or fasteners which will obstruct the flow. Mr Turney suggested that rivits would be used. This is not acceptable without being part of the tested assy.
|
BLD-Other | 12/2/1999 | 12/2/1999 | 12/2/1999 | P | FAIL |
|
|
|
recieved submittal of penetration protection for 2-hour shaft wall using a square duct. as the duct has screws in it, it will not meet the requirements of a dryer duct which must be smooth. the fax submittal was marked not approved and re-faxed to steve t with zga arch. with a copy of the code section in chapter 5.
|
BLD-Conference | 11/29/1999 | 12/1/1999 | 12/1/1999 | P | PART |
|
|
|
with architect Steve on the assemblies and duct and shaft types and the assemblies required. He is to do research on the availability of an approved assembly for duct through a 2-hour rated shaft wall assy. Agreed that the new 3-m wrap material built shaft can terminate at the location just above the wall of the dryer/washer room and just above the booster fan as to not require demolition of the existing wall.
|
BLD-Conference | 11/30/1999 | 11/30/1999 | 11/30/1999 | A | PART |
|
|
|
questions on the dryer duct and penetrations of the 2-hour mech shaft.
|
BLD-Conference | 11/29/1999 | 11/29/1999 | 11/29/1999 | A | PART |
|
|
|
with mech contractor discussion of the rated system by 3M company. he is to get mech eng blessing before any more work done
|
FIRE-Sprinkler Rough-in | 10/21/1999 | 10/25/1999 | 10/25/1999 | A | FAIL |
Rick Jackson
|
|
|
MIKE-- ###-#### FIRE R/I Verified damper locations & sprinkler R/I
|
INSP - Framing/Rough-in | 8/23/1999 | 8/24/1999 | 8/24/1999 | A | PART |
|
|
|
madeo k to cover with other agencies approvals 08/24/99 407 - MIKE ###-####
|
Fee Review-notes | 10/28/1998 | | 8/24/1999 | | |
|
|
|
|
SUPER- Supervisor's review | 8/23/1999 | 8/23/1999 | 8/23/1999 | | |
|
|
|
perry settin conferance on job timetable and inspection
|
INSP - Framing/Rough-in | 8/18/1999 | 8/19/1999 | 8/23/1999 | A | PEND |
|
|
|
jorden ###-#### cell fr insp-- NO ACTION TAKEN FOR CALLED INSP BY 407 THIS IS UPDATE BY 338 CONTR WILL CALL FOR INSP FOR 08/24/99
|
SUPER- Supervisor's review | 8/19/1999 | 8/19/1999 | 8/19/1999 | | |
|
|
|
back on track progress has been slow but frame called in and now proceeding
|
INSP - Framing/Rough-in | 6/14/1999 | 6/14/1999 | 6/14/1999 | P | CANC |
Russ Owen
|
|
|
06/14/99 407 - trans to 338.
|
INSP - Framing/Rough-in | 5/7/1999 | 5/7/1999 | 5/10/1999 | P | PART |
|
|
|
05/07/99 338 - ok to cover with ele div blessing
|
INSP-Conference | 4/7/1999 | 4/7/1999 | 4/7/1999 | P | PART |
Rick Jackson
|
|
|
profit meeting
|
INSP-Conference | 4/2/1999 | 4/2/1999 | 4/2/1999 | P | |
|
|
|
he just wants you to call him so he know when to get everything together mike mason/###-####
|
Issue PAID IN FULL permit | | | 3/24/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/23/1999 | | |
|
|
|
|
Telephone call | | | 3/23/1999 | | |
|
|
|
linda called asked about value of permit. permit ready left message
|
Print Occupancy Form | | | 3/23/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/1999 | | PASS |
|
|
|
To permit desk for issuance of permit
|
Print Pending Permit.LaserJet4 | | | 3/19/1999 | | PASS |
|
|
|
routing to permit desk for issuance of permit.
|
Routing - PLAN CHECK | 3/18/1999 | | 3/19/1999 | | PASS |
|
|
|
pLAN APPROVED FOR ISSUANCE BASED ON NOTES AND ATTACHMENTS AND CONDITION OF PLUMBING APPROVAL IN FIELD. PLUMBING PLAN REVIEWER UNAVAILABLE TO RESPOND TO RESUBMITTALS SO WE ARE ISSUING WITH THIS CONDITION PER DISCUSSION WITH LEE RICE & MARLENE SOUTHARD.
|
Plan assigned to (DRS) | 10/28/1998 | | 3/19/1999 | | PASS |
Dan Stuart
|
|
|
03/19/99 15:24:39 DRS - this action updated by action script from <<>> in Case No. BLD98-3343
|
Routing - FIRE | 3/11/1999 | | 3/11/1999 | | PASS |
|
|
|
approved based on modifications rec'd 3/10/99
|
Routing - PLUMBING | 2/25/1999 | | 3/3/1999 | | FAIL |
|
|
|
ONE SET OF PLANS SENT TO PLUBMING. DAR 1/25/99
|
Routing - PLAN CHECK | 3/3/1999 | | 3/3/1999 | | PARK |
|
|
|
Plans parked behind desk waiting for submittals to fire dept. for plan review and set of plans with Bill Alexander to assist in review of sprinkler & alarm plans.
|
Routing - FIRE | 2/25/1999 | | 3/2/1999 | | FAIL |
|
|
|
SENT ONE SET OF PLANS TO FIRE. DAR 2/25/99 4th floor medical gas room, dictation rooms on 2 and 3
|
Routing - PUBLIC WORKS | 2/24/1999 | | 2/25/1999 | | PASS |
|
|
|
SENT ONE SET OF PLANS TO PW. DAR 2/24/99 BOTH SETS SIGNED OFF. DAR 1/25/99
|
Plan resubmittals received | | | 2/23/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM STEVE TURNEY, ZGA ARCHITECTS, FORWARDED SAME TO DAN STUART. DAR 2/23/99
|
Plan resubmittals received | | | 2/22/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTAL INFORMATION, CORRESPONDENCE, FROM STEVE TURNEY OF ZGA ARCHITECTS FOR FLOYD VARLEY, FORWARDED SAME TO FLOYD VARLEY. DAR 2/23/99
|
Plan Review Completed(1st rev) | | | 12/30/1998 | | FAIL |
|
|
|
all fail
|
Routing - FIRE | 12/24/1998 | | 12/30/1998 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/24/1998 | | 12/23/1998 | | FAIL |
|
|
|
Completed plan review process in between other projects. Sent plan review comments to architects Paul Marcolina & Steve Turney, ZGZ, for response. Plan is being forwarded to Fire Dept. for review pending resubmittals from architect,
|
Plan resubmittals requested | | | 12/23/1998 | | FAIL |
|
|
|
Routing to Fire Dept. for review.
|
Print Pending Permit.LaserJet4 | | | 12/23/1998 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 12/22/1998 | | |
|
|
|
Sent copy of first seven plan review comment sheets to Steve Turney so he could begin to assemble needed re-submittals.
|
Telephone call | | | 12/22/1998 | | |
|
|
|
Discussed FAX received from Steve Turney on proposals to solve travel distance proplem on the first floor area. Choices are to install a two-hour horizontal exit between suite areas, provide rated corridor system between stair enclosures or a rated corridor from an new occupancy separation wall through the elevator lobby/reception/waiting areas.
|
Meeting | | | 12/17/1998 | | |
|
|
|
Met with Steve Turney to review major concerns of review process for hospital T.I. Steve will work on these items while I complete my review.
|
Routing - PLAN CHECK | 11/20/1998 | | 11/24/1998 | | |
|
|
|
Began plan review process.
|
Routing - PLUMBING | 11/9/1998 | | 11/20/1998 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 10/30/1998 | | 11/6/1998 | | FAIL |
|
|
|
geothermal, minor, questions, size and possible location of relocation of meter size of line in building. Kent Johnson 11/06/98
|
Routing Off Site - C.D.H | 10/30/1998 | | 10/30/1998 | | NREQ |
|
|
|
CDH WILL NOT REVIEW THESE PLANS. THEY ARE UNDER THE STATES JURISDICITION. PER DEBBIE MORAN FROM BOB JUE. DAR 103098
|
Plan assigned to (MYS) | 10/26/1998 | | 10/28/1998 | | |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 10/28/1998 | | PASS |
|
|
|
RECEIVED REVISED CERT. OF VALUE FOR $8,846,074 ELECT. $2,250,000 PLUMB. $2,000,000 FIRE SPRINKLER $156,000
|
Plan routing begun/TENANTS | | | 10/28/1998 | | |
|
|
|
Route to CENTRAL DISTRICT HEALTH, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Application received | | | 10/26/1998 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/26/1998 | | |
|
|
|
|