Permanent Occupancy | | 5/27/1999 | 5/27/1999 | | DONE |
|
|
|
|
INSP - Final | 5/27/1999 | 5/27/1999 | 5/27/1999 | P | PASS |
Carl Dependahl
|
|
|
05/27/99 340 - Lafe ###-####; ok card to cont.
|
Receive PAYMENT IN FULL PRINT | | | 5/27/1999 | | |
|
|
|
|
Code Occupancy Approval | | | 5/27/1999 | | PASS |
|
|
|
final requested by Lafe ###-#### sITYE INSPECTION SHOWED ALL CONDITIONS OF DRH98-0214 HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
|
Permanent occupancy | | | 5/27/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7777 issued 5-27-99 to Big Twin Cycles.
|
INSP-Final Inspection | 5/25/1999 | 5/25/1999 | 5/25/1999 | P | PASS |
Joe Tawney
|
|
|
05/25/99 406 - REINSP OK FOR CERT OF COMPLETION
|
INSP-Final Inspection | 5/18/1999 | 5/18/1999 | 5/18/1999 | | FAIL |
Joe Tawney
|
|
|
05/18/99 406 - FINAL FAIL DOOR HDWRE, ADDRESS, RESTROOMS
|
INSP-Final Inspection | 5/14/1999 | 5/17/1999 | 5/17/1999 | P | FAIL |
Carl Dependahl
|
|
|
05/18/99 340 - Lase ###-####; need other sig's, recall
|
INSP - Framing/Rough-in | 5/3/1999 | 5/3/1999 | 5/3/1999 | P | PART |
Tom Arcoraci
|
|
|
05/03/99 408 - ok to cover eletric panel
|
INSP - Framing/Rough-in | 4/19/1999 | 4/19/1999 | 4/19/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - OK TO COVER EXT WALLS; KEEP C/N
|
INSP - Framing/Rough-in | 4/15/1999 | 4/15/1999 | 4/15/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - OK TO COVER ALL LID, WALLS AT STAIR; KEEP C/N
|
INSP - Framing/Rough-in | 4/9/1999 | 4/9/1999 | 4/9/1999 | P | PASS |
Wes Worcester
|
|
|
04/09/99 342 - Lafe ###-####
|
Fee Review-notes | 4/8/1999 | | 4/8/1999 | | |
|
|
|
ADDITIONAL AMOUNT FROM SUBS
|
INSP - Energy code compliance | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | PART |
Carl Dependahl
|
|
|
04/05/99 340 - Lafe ###-####; ins ok, keep c/n for frame, ok to cover li
|
INSP - Framing/Rough-in | 4/5/1999 | 4/5/1999 | 4/5/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - KEEP CN, OK TO COVER LID , HOLDBACK FROM 1HR WALL.
|
INSP - Framing/Rough-in | 4/1/1999 | 4/1/1999 | 4/2/1999 | P | FAIL |
Carl Dependahl
|
|
|
04/01/99 340 - ###-#### LAIF//FRAMING; need all spec insp, complete 1hr
|
INSP - Framing/Rough-in | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | PART |
Carl Dependahl
|
|
|
03/10/99 340 - lase ###-#### ok to rock ext n. wall; need detail or maintain 1hr at fl & roof interse
|
INSP - Framing/Rough-in | 3/8/1999 | 3/9/1999 | 3/9/1999 | P | NR |
Carl Dependahl
|
|
|
03/09/99 340 - complete nailing, recall
|
INSP - Foundation | 3/1/1999 | 3/1/1999 | 3/1/1999 | | PART |
Carl Dependahl
|
|
|
02/26/99 340 - foundation and re-bar /// inspect by MTI Gary Adams pend spec insp
|
INSP - Foundation | 2/25/1999 | 2/26/1999 | 2/28/1999 | P | NH |
|
|
|
02/26/99 338 - done by 316
|
INSP - Foundation | 2/26/1999 | 2/26/1999 | 2/26/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - FOUND WALL ...POURED W/O CITY INSP...OK PENDING SPECIAL INSP
|
INSP - Foundation | 2/24/1999 | 2/25/1999 | 2/25/1999 | A | PART |
Carl Dependahl
|
|
|
02/25/99 340 - late am please rod ###-#### footing
|
INSP - Foundation | 2/23/1999 | 2/24/1999 | 2/24/1999 | P | FAIL |
Carl Dependahl
|
|
|
rod will have a special inspector there. mti will inspect footing and steel. soil also bob jones/###-####...not formed, no steel.
|
INSP - Foundation | 2/22/1999 | 2/23/1999 | 2/23/1999 | P | CANC |
Carl Dependahl
|
|
|
footing/ rod ###-#### not ready as of yet
|
Issue PAID IN FULL permit | | | 2/2/1999 | | |
|
|
|
|
Print Occupancy Form | | | 2/1/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/1/1999 | | |
|
|
|
|
Telephone call | | | 2/1/1999 | | |
|
|
|
talked to matt told him he needed something from achd before we can issue
|
Telephone call | 2/1/1999 | | 2/1/1999 | | |
|
|
|
|
Plan assigned to (MLO) | 11/4/1998 | | 1/29/1999 | | PASS |
Mike Otto
|
|
|
01/21/99 11:05:58 MLO - this action updated by action script from <<>> in Case No. BLD99-0186 THIS NOTE PERTAINS TO THE DEMO PERMIT. MLO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/29/1999 | | 1/29/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/28/1999 | | 1/29/1999 | | PASS |
|
|
|
RESUBMITTALS SENT TO ENGINEER AS REQUESTED FOR REVIEW. MLO
|
Plan resubmittals received | | | 1/28/1999 | | |
|
|
|
RECEIVED TWO COPIES OF SUPPLEMENTAL CALCULATIONS FOR INCREASE IN LATERAL LOADS ON MEZZANINE WEST OF GRID LINE 3, AND COVER LETTER. ROUTED TO MIKE O. KMM
|
Plan resubmittals requested | | | 1/27/1999 | | FAIL |
|
|
|
ADDITIONAL CORRECTIONS FROM STRUCTRUAL ENGINEER FAXED AND MAILED TO ARCHITECT. MLO
|
Routing Off Site - STRUCTURAL | 1/19/1999 | | 1/27/1999 | | FAIL |
|
|
|
SENT TO ENGINEERS VIA PDQ. 1/19/99 DAR
|
Plan resubmittals received | | | 1/25/1999 | | |
|
|
|
RECEIVED FOUR COPIES OF REVISED SHEETS A.2, M.1, P.1, ROUTED TO MIKE O. KMM
|
Plan resubmittals received | | | 1/21/1999 | | |
|
|
|
RECEIVED FOUR COPIES OF REVISED SHEETS A.4. ROUTED TO MIKE O. KMM
|
Plan Reviewer's activity | | | 1/20/1999 | | PEND |
|
|
|
RECEIVED COPY OF LETTER FROM CENTAL DISTRICT HEALTH IN REGARDS TO THE SEPTIC SYSTEM SERVING THIS PROPERTY. COPY OF LETER GIVEN TO CITY PUBLIC WORKS SEWER RATING OFFICE. MLO
|
Plan resubmittals received | | | 1/15/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM TROUT ARCHITECTS, FORWARDED SAME TO MIKE OTTO.
|
Routing - FIRE | 1/13/1999 | | 1/14/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/11/1999 | | 1/13/1999 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 1/13/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FOR DEMO PERMIT FROM TROUT ARCHITECTS. DAR 1/12/99
|
Plan resubmittals requested | | | 1/13/1999 | | FAIL |
|
|
|
INTIAL PLAN REVIEW COMPLETED. CORRECTIONS MAIELD AND FAXED TO ARCHITECT. MLO
|
Routing - PLANNING | 1/8/1999 | | 1/11/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 1/8/1999 | | 1/8/1999 | | PASS |
|
|
|
Pending DR approval, as per CVA98-0019.
|
Routing - PLUMBING | 1/7/1999 | | 1/7/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/4/1999 | | |
|
|
|
RECEIVED FOUR COPIES OF P.1, M.1, AND E.1 SHEETS ROUTED TO MIKE O. KMM
|
Routing Off Site - STRUCTURAL | 12/10/1998 | | 12/31/1998 | | FAIL |
|
|
|
0ESUBS SENT OUT TO CH2MHILL VIA PDQ. KMM 12-09-98 12-22-98 SENT OUT TO CH2MHILL REVISED STRUCT. CALCS. ONLY DATED RESUB 12-09-98---CALCS WERE MISSING SOME SHEETS. MLO 12-31-98 ROUTED TO MIKE O 0113-99 NON-STRUCTRUAL REVIEW REVEALED INCORRECT LOADS FOR STORAGE AREA 2ND FLOOR. ARCHITECT AND ENGINEER NOTIFIED TO RESUBMIT FOR CORRECT LOADS.
|
Plan resubmittals received | | | 12/9/1998 | | |
|
|
|
RECEIVED 3 COPIES OF STRUCTURAL CALCS, ONE LETTER, ONE LETTER FROM BRIGGS, AND FOUR REVISED SHEETS A.10. ROUTED TO MIKE O. RESPONSE TO STRUCTRUAL REVIEW COMMENTS - SENT TO ENGINEER FOR REVIEW. MLO
|
Plan Review Completed(1st rev) | | | 11/27/1998 | | FAIL |
|
|
|
plan set not complete... no mech elec or plumbing... no door schedule
|
Routing - FIRE | 11/20/1998 | | 11/25/1998 | | FAIL |
|
|
|
can not review incomplete plans... need ubc occupancy review
|
Plan resubmittals received | | | 11/20/1998 | | |
|
|
|
RECEIVED THREE COPIES OF S TRUCTURAL NOTES AND SPECIFICATIONS. ONE BLUELINE SET. ROUTED TO MIKE O. KMM
|
Routing Off Site - STRUCTURAL | 11/13/1998 | | 11/18/1998 | | FAIL |
|
|
|
SENT TO CH2MHILL BY PDQ 11/13/98 DAR
|
Plan resubmittals requested | | | 11/18/1998 | | FAIL |
|
|
|
CORRECTIONS FROM STRUCTRUAL REVIEW MAILED AND FAXED TO ARCHITECT. MLO
|
Routing - PLAN CHECK | 11/6/1998 | | 11/13/1998 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 11/13/1998 | | FAIL |
|
|
|
PLANS INCOMPLETE: CALLED ARCHITECT AND REQUESTED PLUMBIMG, MECHANCIAL AND ELECTRICAL DRAWINGS BE PROVIDED. PLANS ROUTED TO OUTSIDE STRUCTURAL REVIEW FOR STEEL FRAMING DESIGN. MLO
|
Routing - PUBLIC WORKS | 11/5/1998 | | 11/6/1998 | | PASS |
|
|
|
|
Routing - PLANNING | 11/5/1998 | | 11/5/1998 | | PEND |
|
|
|
A Design Review Modification has been approved. Buildin permit documents must be reviewed for compliance with the modification application. Discussed this January 6, 1999 with Matt at Trout Architects office.
|
Plan routing begun/TENANTS | | | 11/4/1998 | | |
|
|
|
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 11/3/1998 | | PEND |
|
|
|
11-03-98 COVER SHEETS LISTS A SHEET A.11. HOWEVER THAT SHEET IS MISSING FROM SUBMITTAL. CONTACTED MATT REDDY OF THIS NEED. WILL HOLD UNTIL I HEAR FROM MATT. KMM 11-04-98 RECEIVED A CALL FROM MATT. THEY ARE WORKING ON A.11 (ELECTRICAL SHEET) AND WILL SUBMIT PLAN AS SOON AS POSSIBLE. I TOLD HIM I WOULD ROUTE TO MARLENE AND THAT WE DO NOT DESIGN BUILD. ELEC. WILL BE FIELD VERIFIED SO WE COULD WAIT FOR THE ELECT. PLANS AND START ROUTING BEFORE THEY ARE RECEIVED. KMM
|
Recd Pcfee & Taken To Pln CK | | | 11/2/1998 | | |
|
|
|
|
Application received | | | 11/2/1998 | | PASS |
|
|
|
|