Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD98-03425
StatusFinaled
Name GRICE JOHN E & PHYLLIS E
Site Address 2816 S ORCHARD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A 2703 SQ. FT. TWO STORY ADDITION TO AN EXISTING BUILDING CONSTRUCTION WILL BE TYPE VN, WOOD AND STEEL FRAME WITH A ONE-HOUR RATED EXTERIOR WALL ON THE NORTH SIDE. ALL WORK PER APPROVED PLANS AND ATTACHMENTS, DRH98-0127. 1753 SQ. FT. FIRST FLOOR , 950 SQ. FT. SECOND FLOOR. OCCUPANT LOAD ON SECOND FLOOR LIMITED TO 9 FOR ONE EXIT. OCCUPANT LOAD FOR SECOND FLOOR PER APPROVED PLAN IS 8.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 5/27/19995/27/1999 DONE
Details
INSP - Final5/27/19995/27/19995/27/1999PPASS
DetailsCarl Dependahl
05/27/99 340 - Lafe ###-####; ok card to cont.
Receive PAYMENT IN FULL PRINT  5/27/1999
Code Occupancy Approval  5/27/1999 PASS
final requested by Lafe ###-#### sITYE INSPECTION SHOWED ALL CONDITIONS OF DRH98-0214 HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF.
Permanent occupancy  5/27/1999 PASS
Perm. Occ. Cert. #7777 issued 5-27-99 to Big Twin Cycles.
INSP-Final Inspection5/25/19995/25/19995/25/1999PPASS
DetailsJoe Tawney
05/25/99 406 - REINSP OK FOR CERT OF COMPLETION
INSP-Final Inspection5/18/19995/18/19995/18/1999 FAIL
DetailsJoe Tawney
05/18/99 406 - FINAL FAIL DOOR HDWRE, ADDRESS, RESTROOMS
INSP-Final Inspection5/14/19995/17/19995/17/1999PFAIL
DetailsCarl Dependahl
05/18/99 340 - Lase ###-####; need other sig's, recall
INSP - Framing/Rough-in5/3/19995/3/19995/3/1999PPART
DetailsTom Arcoraci
05/03/99 408 - ok to cover eletric panel
INSP - Framing/Rough-in4/19/19994/19/19994/19/1999 PART
DetailsCarl Dependahl
/ / 340 - OK TO COVER EXT WALLS; KEEP C/N
INSP - Framing/Rough-in4/15/19994/15/19994/15/1999 PART
DetailsCarl Dependahl
/ / 340 - OK TO COVER ALL LID, WALLS AT STAIR; KEEP C/N
INSP - Framing/Rough-in4/9/19994/9/19994/9/1999PPASS
DetailsWes Worcester
04/09/99 342 - Lafe ###-####
Fee Review-notes4/8/1999 4/8/1999
ADDITIONAL AMOUNT FROM SUBS
INSP - Energy code compliance4/5/19994/5/19994/5/1999PPART
DetailsCarl Dependahl
04/05/99 340 - Lafe ###-####; ins ok, keep c/n for frame, ok to cover li
INSP - Framing/Rough-in4/5/19994/5/19994/5/1999 FAIL
DetailsCarl Dependahl
/ / 340 - KEEP CN, OK TO COVER LID , HOLDBACK FROM 1HR WALL.
INSP - Framing/Rough-in4/1/19994/1/19994/2/1999PFAIL
DetailsCarl Dependahl
04/01/99 340 - ###-#### LAIF//FRAMING; need all spec insp, complete 1hr
INSP - Framing/Rough-in3/10/19993/10/19993/10/1999PPART
DetailsCarl Dependahl
03/10/99 340 - lase ###-#### ok to rock ext n. wall; need detail or maintain 1hr at fl & roof interse
INSP - Framing/Rough-in3/8/19993/9/19993/9/1999PNR
DetailsCarl Dependahl
03/09/99 340 - complete nailing, recall
INSP - Foundation3/1/19993/1/19993/1/1999 PART
DetailsCarl Dependahl
02/26/99 340 - foundation and re-bar /// inspect by MTI Gary Adams pend spec insp
INSP - Foundation2/25/19992/26/19992/28/1999PNH
Details
02/26/99 338 - done by 316
INSP - Foundation2/26/19992/26/19992/26/1999 PART
DetailsJim Sly
/ / 316 - FOUND WALL ...POURED W/O CITY INSP...OK PENDING SPECIAL INSP
INSP - Foundation2/24/19992/25/19992/25/1999APART
DetailsCarl Dependahl
02/25/99 340 - late am please rod ###-#### footing
INSP - Foundation2/23/19992/24/19992/24/1999PFAIL
DetailsCarl Dependahl
rod will have a special inspector there. mti will inspect footing and steel. soil also bob jones/###-####...not formed, no steel.
INSP - Foundation2/22/19992/23/19992/23/1999PCANC
DetailsCarl Dependahl
footing/ rod ###-#### not ready as of yet
Issue PAID IN FULL permit  2/2/1999
Print Occupancy Form  2/1/1999
Inspection Record Card- Bld  2/1/1999
Telephone call  2/1/1999
talked to matt told him he needed something from achd before we can issue
Telephone call2/1/1999 2/1/1999
Plan assigned to (MLO)11/4/1998 1/29/1999 PASS
DetailsMike Otto
01/21/99 11:05:58 MLO - this action updated by action script from <<>> in Case No. BLD99-0186 THIS NOTE PERTAINS TO THE DEMO PERMIT. MLO
PLANS/APPL TAKEN TO FRONT DESK  1/29/1999 PASS
Routing - PLAN CHECK1/29/1999 1/29/1999 PASS
Routing Off Site - STRUCTURAL1/28/1999 1/29/1999 PASS
RESUBMITTALS SENT TO ENGINEER AS REQUESTED FOR REVIEW. MLO
Plan resubmittals received  1/28/1999
RECEIVED TWO COPIES OF SUPPLEMENTAL CALCULATIONS FOR INCREASE IN LATERAL LOADS ON MEZZANINE WEST OF GRID LINE 3, AND COVER LETTER. ROUTED TO MIKE O. KMM
Plan resubmittals requested  1/27/1999 FAIL
ADDITIONAL CORRECTIONS FROM STRUCTRUAL ENGINEER FAXED AND MAILED TO ARCHITECT. MLO
Routing Off Site - STRUCTURAL1/19/1999 1/27/1999 FAIL
SENT TO ENGINEERS VIA PDQ. 1/19/99 DAR
Plan resubmittals received  1/25/1999
RECEIVED FOUR COPIES OF REVISED SHEETS A.2, M.1, P.1, ROUTED TO MIKE O. KMM
Plan resubmittals received  1/21/1999
RECEIVED FOUR COPIES OF REVISED SHEETS A.4. ROUTED TO MIKE O. KMM
Plan Reviewer's activity  1/20/1999 PEND
RECEIVED COPY OF LETTER FROM CENTAL DISTRICT HEALTH IN REGARDS TO THE SEPTIC SYSTEM SERVING THIS PROPERTY. COPY OF LETER GIVEN TO CITY PUBLIC WORKS SEWER RATING OFFICE. MLO
Plan resubmittals received  1/15/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM TROUT ARCHITECTS, FORWARDED SAME TO MIKE OTTO.
Routing - FIRE1/13/1999 1/14/1999 PASS
Routing - PLAN CHECK1/11/1999 1/13/1999 FAIL
Plan resubmittals received  1/13/1999 PEND
RECEIVED RESUBMITTALS FOR DEMO PERMIT FROM TROUT ARCHITECTS. DAR 1/12/99
Plan resubmittals requested  1/13/1999 FAIL
INTIAL PLAN REVIEW COMPLETED. CORRECTIONS MAIELD AND FAXED TO ARCHITECT. MLO
Routing - PLANNING1/8/1999 1/11/1999 PASS
Routing - PLANNING1/8/1999 1/8/1999 PASS
Pending DR approval, as per CVA98-0019.
Routing - PLUMBING1/7/1999 1/7/1999 PASS
Plan resubmittals received  1/4/1999
RECEIVED FOUR COPIES OF P.1, M.1, AND E.1 SHEETS ROUTED TO MIKE O. KMM
Routing Off Site - STRUCTURAL12/10/1998 12/31/1998 FAIL
0ESUBS SENT OUT TO CH2MHILL VIA PDQ. KMM 12-09-98 12-22-98 SENT OUT TO CH2MHILL REVISED STRUCT. CALCS. ONLY DATED RESUB 12-09-98---CALCS WERE MISSING SOME SHEETS. MLO 12-31-98 ROUTED TO MIKE O 0113-99 NON-STRUCTRUAL REVIEW REVEALED INCORRECT LOADS FOR STORAGE AREA 2ND FLOOR. ARCHITECT AND ENGINEER NOTIFIED TO RESUBMIT FOR CORRECT LOADS.
Plan resubmittals received  12/9/1998
RECEIVED 3 COPIES OF STRUCTURAL CALCS, ONE LETTER, ONE LETTER FROM BRIGGS, AND FOUR REVISED SHEETS A.10. ROUTED TO MIKE O. RESPONSE TO STRUCTRUAL REVIEW COMMENTS - SENT TO ENGINEER FOR REVIEW. MLO
Plan Review Completed(1st rev)  11/27/1998 FAIL
plan set not complete... no mech elec or plumbing... no door schedule
Routing - FIRE11/20/1998 11/25/1998 FAIL
can not review incomplete plans... need ubc occupancy review
Plan resubmittals received  11/20/1998
RECEIVED THREE COPIES OF S TRUCTURAL NOTES AND SPECIFICATIONS. ONE BLUELINE SET. ROUTED TO MIKE O. KMM
Routing Off Site - STRUCTURAL11/13/1998 11/18/1998 FAIL
SENT TO CH2MHILL BY PDQ 11/13/98 DAR
Plan resubmittals requested  11/18/1998 FAIL
CORRECTIONS FROM STRUCTRUAL REVIEW MAILED AND FAXED TO ARCHITECT. MLO
Routing - PLAN CHECK11/6/1998 11/13/1998 FAIL
Plan resubmittals requested  11/13/1998 FAIL
PLANS INCOMPLETE: CALLED ARCHITECT AND REQUESTED PLUMBIMG, MECHANCIAL AND ELECTRICAL DRAWINGS BE PROVIDED. PLANS ROUTED TO OUTSIDE STRUCTURAL REVIEW FOR STEEL FRAMING DESIGN. MLO
Routing - PUBLIC WORKS11/5/1998 11/6/1998 PASS
Routing - PLANNING11/5/1998 11/5/1998 PEND
A Design Review Modification has been approved. Buildin permit documents must be reviewed for compliance with the modification application. Discussed this January 6, 1999 with Matt at Trout Architects office.
Plan routing begun/TENANTS  11/4/1998
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  11/3/1998 PEND
11-03-98 COVER SHEETS LISTS A SHEET A.11. HOWEVER THAT SHEET IS MISSING FROM SUBMITTAL. CONTACTED MATT REDDY OF THIS NEED. WILL HOLD UNTIL I HEAR FROM MATT. KMM 11-04-98 RECEIVED A CALL FROM MATT. THEY ARE WORKING ON A.11 (ELECTRICAL SHEET) AND WILL SUBMIT PLAN AS SOON AS POSSIBLE. I TOLD HIM I WOULD ROUTE TO MARLENE AND THAT WE DO NOT DESIGN BUILD. ELEC. WILL BE FIELD VERIFIED SO WE COULD WAIT FOR THE ELECT. PLANS AND START ROUTING BEFORE THEY ARE RECEIVED. KMM
Recd Pcfee & Taken To Pln CK  11/2/1998
Application received  11/2/1998 PASS