Fee Review-notes | 2/16/1999 | | 8/20/1999 | | |
|
|
|
|
Permanent occupancy | | | 8/17/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7871 issued 8-17-99 to ATS Wheelchair & Medical.
|
INSP - Final | 7/20/1999 | 7/21/1999 | 7/21/1999 | A | PASS |
Carl Dependahl
|
|
|
07/21/99 340 - ###-#### voice pager kelly reinspection; ok to sign for p
|
Permanent Occupancy | | 7/21/1999 | 7/21/1999 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 7/15/1999 | | PASS |
|
|
|
ALL CONDITIONS OF DRH98-0047 HAVE BEEN MET, FINAL OCCUPANCY SIGNED OFF AND ALSO THE RELEASE OF BOND.
|
Temporary occupancy | | | 7/2/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3863 issued 7-2-99 to ATS Wheelchair & Medical.
|
INSP-Final Inspection | 6/29/1999 | 6/30/1999 | 6/30/1999 | P | PASS |
Rick Jackson
|
|
|
KELLY ###-#### PAGER. READY AT 2:30 occ approved
|
INSP - Final | 6/25/1999 | 6/28/1999 | 6/28/1999 | P | FAIL |
Carl Dependahl
|
|
|
06/28/99 340 - late pm kelly ###-####
|
INSP - Final | 6/28/1999 | 6/28/1999 | 6/28/1999 | A | FAIL |
Carl Dependahl
|
|
|
conf w/ Joe T re final...nr
|
INSP-Final Inspection | 6/25/1999 | 6/28/1999 | 6/28/1999 | A | FAIL |
Joe Tawney
|
|
|
06/28/99 406 - REINSP FAIL DUCT DET, BARRICADE, EXIT SIGNS
|
INSP-Final Inspection | 6/24/1999 | 6/24/1999 | 6/24/1999 | P | FAIL |
Joe Tawney
|
|
|
06/24/99 406 - FINAL FAIL DOORS, EXIT LIGHTS, ADDRESS, TEST DET
|
INSP - Framing/ Rough-in | 6/24/1999 | 6/24/1999 | 6/24/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - ALL FRAME OK TO COVER
|
Code Occupancy Approval | | | 6/24/1999 | | |
|
|
|
Temporary Occupancy requested by Kelly ###-#### pager
|
INSP - Framing/Rough-in | 5/25/1999 | 5/27/1999 | 5/27/1999 | A | PART |
Carl Dependahl
|
|
|
05/27/99 340 - ###-#### KELLY//SEISMIC; clg ok to tile, firestop occ sep
|
INSP - Framing/Rough-in | 5/26/1999 | 5/26/1999 | 5/26/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - BEAM AT 1HR WALL
|
INSP - Framing/Rough-in | 5/18/1999 | 5/18/1999 | 5/18/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - PROTECT BEAM & FIRESTOP AT 1HR OCC. SEP. C/N.
|
INSP - Framing/Rough-in | 5/18/1999 | 5/18/1999 | 5/18/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - KEEP C/N
|
INSP - Framing/Rough-in | 4/29/1999 | 4/29/1999 | 4/29/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF W/ BLDR...WRAP BEAM AT 1HR WALL
|
INSP - Framing/Rough-in | 4/29/1999 | 4/29/1999 | 4/29/1999 | P | PART |
Carl Dependahl
|
|
|
04/29/99 340 - framing/ Kelly ###-####; int walls ok, need detail for be
|
INSP - Framing/Rough-in | 4/28/1999 | 4/28/1999 | 4/28/1999 | P | PART |
Carl Dependahl
|
|
|
04/28/99 340 - framing/ Kelly ###-####; sales are ok to ins. need firebl
|
INSP - Framing/Rough-in | 4/23/1999 | 4/26/1999 | 4/26/1999 | P | FAIL |
Carl Dependahl
|
|
|
04/26/99 340 - framing/ Kelly ###-####, need plbg, elec
|
INSP - Framing/Rough-in | 4/22/1999 | 4/22/1999 | 4/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - SW NAILING, SO. & WEST. OK EXC. AT TOP, OK TO CONTINUE. KEEP
|
INSP - Framing/Rough-in | 4/21/1999 | 4/21/1999 | 4/21/1999 | P | FAIL |
Carl Dependahl
|
|
|
04/21/99 340 - ###-#### KELLY//FRAMING. need nailing at top of diaphragm
|
INSP - Framing/Rough-in | 4/20/1999 | 4/20/1999 | 4/20/1999 | P | FAIL |
Carl Dependahl
|
|
|
04/20/99 340 - kelly ###-####; c/n nail sw 1-2 per eng, o.d. fasteners,
|
INSP - Framing/Rough-in | 4/16/1999 | 4/16/1999 | 4/16/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - NEED ENGS LETTER/CALCS FOR MASONRY W/I 10 DAYS OR SWO, INFOR
|
INSP - Framing/Rough-in | 4/14/1999 | 4/14/1999 | 4/14/1999 | P | PART |
Carl Dependahl
|
|
|
04/14/99 340 - nailinng ok for roof
|
INSP - Framing/Rough-in | 4/12/1999 | 4/13/1999 | 4/13/1999 | P | FAIL |
Carl Dependahl
|
|
|
04/13/99 340 - ###-#### KELLY//ROOF NAILING; renail, recall
|
INSP - Framing/Rough-in | 4/1/1999 | 4/2/1999 | 4/2/1999 | A | PART |
Carl Dependahl
|
|
|
04/02/99 340 - Kelly ###-#### late am...upper lift east wall
|
INSP - Framing/Rough-in | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | PART |
Carl Dependahl
|
|
|
03/30/99 340 - ###-#### KELLY//MASONARY WALLS LATE AM nerth end east wall onlt 3rd lift ok
|
INSP - Foundation | 3/29/1999 | 3/29/1999 | 3/29/1999 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - MASONRY, C/N, NEED ENG'S LETTER, MAT'L CERTS PER 2105 UBC
|
INSP - Concrete | 3/25/1999 | 3/26/1999 | 3/26/1999 | P | PART |
Carl Dependahl
|
|
|
###-#### KELLY//MASONARY FOR WALLS
|
INSP - Concrete | 3/26/1999 | 3/26/1999 | 3/26/1999 | | PART |
Carl Dependahl
|
|
|
03/26/99 340 - ###-#### KELLY//MASONARY FOR WALLS east wall
|
INSP - Concrete | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | PART |
Carl Dependahl
|
|
|
03/25/99 340 - ###-#### kelly 1st lift masonry east side ok
|
INSP - Foundation | 3/25/1999 | 3/25/1999 | 3/25/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF. W/ KELLY, SUPT. RE MASONRY INSP REQ'S
|
INSP - Foundation | 3/11/1999 | 3/12/1999 | 3/12/1999 | A | PART |
Carl Dependahl
|
|
|
03/12/99 340 - ###-#### KELLY int, grade beams & pads, looks ok; pending spec insp report
|
INSP - Foundation | 3/3/1999 | 3/4/1999 | 3/4/1999 | A | PART |
Carl Dependahl
|
|
|
03/04/99 340 - west/north fdn wall...pend spec insp
|
INSP - Foundation | 3/2/1999 | 3/3/1999 | 3/3/1999 | A | PART |
Carl Dependahl
|
|
|
03/03/99 340 - east side fdn wall ok, pending spec insp reports ( per sp
|
INSP - Foundation | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | PART |
Carl Dependahl
|
|
|
03/01/99 340 - footing\\###-####
|
INSP - Foundation | 2/25/1999 | 2/25/1999 | 2/25/1999 | P | |
Carl Dependahl
|
|
|
###-#### Kelly
|
INSP - Foundation | 2/22/1999 | 2/22/1999 | 2/24/1999 | P | PART |
Carl Dependahl
|
|
|
footing ###-#### pager Kelly..east side ftgs, bar ok, MTI to do cylinders.
|
(F) Reprint permit | | | 2/8/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/5/1999 | | |
|
|
|
|
Telephone call | | | 1/8/1999 | | |
|
|
|
CALLED PERMIT READY NEED ACHD CERT
|
Inspection Record Card- Bld | | | 1/8/1999 | | |
|
|
|
|
Print Occupancy Form | | | 1/8/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/1999 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 11/6/1998 | | 1/8/1999 | | PASS |
Mike Otto
|
|
|
|
Routing - PUBLIC WORKS | 1/5/1999 | | 1/6/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/5/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS PLUS THREE SETS AUTOMATIC ENTRANCE SPEC. ROUTED TO MIKE O. KMM
|
Routing - FIRE | 12/10/1998 | | 12/10/1998 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 12/8/1998 | | FAIL |
|
|
|
PLAN CHECK CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Routing - PLAN CHECK | 11/25/1998 | | 12/7/1998 | | FAIL |
|
|
|
|
Routing - PLUMBING | 11/24/1998 | | 11/25/1998 | | PASS |
|
|
|
12.566"min vtr, fixture sch. should list 2" min waste for wb, air gap or indirect waste for dish washer, tenant space needs a separate water supply from premis protection and shutoff valve in that space.
|
Routing - PLANNING | 11/10/1998 | | 11/24/1998 | | PASS |
|
|
|
x-ref. DRH98-0047
|
Routing - PUBLIC WORKS | 11/6/1998 | | 11/10/1998 | | FAIL |
|
|
|
NEEDS DRAINAGE PLAN REVISIONS PER BM, 11/10/98 DAR
|
Plan assigned to (MYS) | 11/5/1998 | | 11/6/1998 | | PEND |
Marlene Southard
|
|
|
|
Received Certificate of Value | | | 11/6/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/6/1998 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 11/6/1998 | | PASS |
|
|
|
|
Application received | | | 11/5/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/5/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 1/7/1999 | | 1/8/1998 | | PASS |
|
|
|
|