Case Summary (BLD) | | | 12/11/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/15/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/4/2004 | | |
|
|
|
|
Fee Review-notes | 6/20/2003 | 6/20/2003 | 6/20/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/3/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8780 issued 8-3-01 to the YMCA.
|
Permanent Occupancy | | 8/2/2001 | 8/2/2001 | | DONE |
|
|
|
|
BLD-Conference | 6/7/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/7/2001 8:34:40 AM ok to delete panic at activity rm... floor area is marginal & largely occupied by semi-fixed tables; consulted w/ Mike Otto. Also rec'd eng's & spec. insps reports ok. 6/7/2001 8:35:15 AM
|
BLD-Final | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/6/2001 3:53:49 PM w/ Jordan Wilcomb re final
|
BLD-Conference | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/21/2001 3:57:25 PM no final til eng's letters approved
|
BLD-Conference | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/1/2001 4:39:07 PM w/ arch re c/n
|
BLD-Final | 4/24/2001 | 4/25/2001 | 4/25/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; c/n, need panic at doors from rm 107 & eng's /spec insp's affidavits. 4/25/2001 2:01:42 PM
|
Code Occupancy Approval | | | 4/24/2001 | | PASS |
|
|
|
Passed today. Jim (Jordan Wilcomb) ###-####
|
FIRE-Final Inspection | 2/14/2001 | 2/16/2001 | 2/16/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
FIRE-Final Inspection | 10/23/2000 | 10/31/2000 | 10/31/2000 | A | FAIL |
Rick Jackson
|
|
|
FIRE FN -JIM ###-#### c/n issued 10/31/2000 11:13:41 AM
|
Code Occupancy Approval | | | 10/4/2000 | | FAIL |
|
|
|
Still need to complete: 2 planters at NE cor. (10th St) neaar trailer. Concrete at north end of parking along 11th st.Gate (screening) at area being used as "dumpster enclosure" and screen gas mec. at the wast side of bldg. (10th St.).
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PART |
|
|
|
###-#### ceiling grid ceiling. rated ok on the 2nd floor rated 9/19/2000 9:58:38 AM
|
FIRE-Conference | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | PART |
Rick Jackson
|
|
|
###-#### okay to occupy the womens locker and roof playground. 9/14/2000 9:48:45 AM
|
Additional plans submitted | | | 9/13/2000 | | |
|
|
|
RECEIVED SMALL DOCUMENTS FROM ROBERT HOWARD, HOSFORD, LARSON, RUDEEN, FORWARDED SAME TO PERRY PAINE. 9/13/00 DAR
|
BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | FAIL |
|
|
|
###-#### 2nd floor rated ceiling, must follow eng to the letter, c/n issued 9/12/2000 10:01:54 AM
|
BLD-Other | 12/15/2000 | 12/15/2000 | 9/9/2000 | | DONE |
|
|
|
After consult with m otto I approved 81/2 by 11 submittals for the area "b" classroo 183 through old storage room closing off exist 2nd exit etc..pep 12/15/2K
|
BLD-Conference | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PART |
|
|
|
FOR CONF JIM-- ###-#### must review with m otto 9/7/2000 3:13:30 PM
|
FIRE-Conference | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PART |
Rick Jackson
|
|
|
###-#### Jim checked life safety for the new pool area; exits and alarms okay. gave approval to use the pool effective 9/5/00 9/1/2000 2:41:49 PM
|
BLD-Conference | 8/28/2000 | 9/1/2000 | 9/1/2000 | A | PART |
|
|
|
###-#### madeok to occ upy the pool area 9/1/2000 4:05:52 PM
|
FIRE-Conference | 8/28/2000 | 8/31/2000 | 8/31/2000 | A | PART |
Rick Jackson
|
|
|
###-#### diwscussed requireements of opening pool area 8/31/2000 10:54:13 AM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PART |
|
|
|
JIM ###-#### CEILING GRID ceiling room adj to the pool 8/24/2000 10:15:17 AM
|
BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
|
|
|
Jim ###-#### on the type of assy to use on the 2nd floor corridor assy 8/2/2000 10:41:16 AM
|
FIRE-Conference | 7/31/2000 | 8/2/2000 | 8/1/2000 | A | PART |
Rick Jackson
|
|
|
###-#### Jim okay to occupy basement offices 8/1/2000 3:36:06 PM
|
Plan resubmittals received | | | 7/27/2000 | | DONE |
|
|
|
RECEIVED ONE COPY OF PROPOSAL REQUEST FOR A NEW RATED GYPSUM SHAFTWALL CEILING IN CORRIDOR 203. ROUTED TO PERRY. KMM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | PART |
|
|
|
JIM ###-#### FR on the stair rated ceiling system. 7/26/00 11:13:10 AM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | CANC |
Russ Owen
|
|
|
###-####
|
FIRE-Conference | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | PART |
Rick Jackson
|
|
|
###-#### Do not occupy basement until 1hr corridor is complete 7/19/00 10:07:22 AM
|
FIRE-Conference | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | PART |
Rick Jackson
|
|
|
###-####
|
FIRE-Conference | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
Rick Jackson
|
|
|
###-####; okay to occupy the cardio vascular room
|
FIRE-Conference | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | PART |
Rick Jackson
|
|
|
Jim ###-#### REquirements to open cardio room- exit sign; proper stores; exit path unobstructed; C/N issued. 7/11/00 11:38:38 AM
|
BLD-Framing/Rough-in | 6/30/2000 | 7/3/2000 | 7/3/2000 | A | PART |
|
|
|
###-#### ceiling grid ceiling made ok to drop in tiles igh ceiling adj to the pool 7/6/00 2:00:20 PM
|
BLD-Framing/Rough-in | 6/26/2000 | 6/26/2000 | 6/26/2000 | P | PART |
|
|
|
###-#### ceiling grid ceilings in the 1st and bsmt verbal need to confirm all slack wireing 6/27/00 4:31:18 PM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 6/19/00 ceiling grid jim made ok with other agencies approvals 6/20/00 10:19:01 AM
|
BLD-Framing/Rough-in | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | CANC |
|
|
|
jim ###-#### ceiling grid insp out of time 6/19/00 6:50:08 AM
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | PASS |
|
|
|
CEILING GRID--- JIM ###-#### ok to drop in the tiles 5/31/00 4:41:24 PM
|
FIRE-Conference | 5/17/2000 | 5/18/2000 | 5/18/2000 | P | PART |
Rick Jackson
|
|
|
jim ###-#### fire conf--around 1:00 Okay to occupy front lobby office area. 5/22/00 9:01:08 AM
|
BLD-Framing/Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PART |
|
|
|
ceiling grid jim ###-#### ok to dropin the tiles for the new gymnewhall ok 4/24/00 2:35:50 PM
|
FIRE-Final Inspection | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Rick Jackson
|
|
|
reinspection jim ###-#### Conference to determine criteria to use new gymnasium. 4/26/00 11:58:05 AM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PART |
|
|
|
ceiling grid---jim ###-#### c/n issued slack wires required on diffusers or attach positively to the main runner or crosstee that is supported by wires 04/21/2000 10:33:48 AM
|
BLD-Framing/Rough-in | 4/11/2000 | 4/12/2000 | 4/12/2000 | P | PART |
|
|
|
###-#### ceiling oktto drop in tiles with secure of the diffusers (no caddy clips) gym ceiling 04/12/2000
|
BLD-Conference | 3/28/2000 | 3/29/2000 | 3/29/2000 | A | PART |
|
|
|
###-#### with jim (jw) robert (hlr) and myself conf on the occupancy of the new 2nd floor gym for the temp exercise room, will be ok to use if there are two complete exits. also.discussed the use of existing doors in rated walls, if doors are moved they must be replaced; all doors are to have approved hardware aemblies; all glazing is to be in proper frames... 3/30/00 10:04:22 AM
|
FIRE-Final Inspection | 3/28/2000 | 3/29/2000 | 3/29/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### Not a final- ok to occupy west activity room. 3/30/00 11:02:29 AM
|
Telephone call | | | 3/23/2000 | | DONE |
|
|
|
left message with bob and Perry
|
BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PART |
|
|
|
ceiling grid Jim ###-#### ceiling grid at main level entry 03/22/2000 2:00:14 PM
|
FIRE-Final Inspection | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | FAIL |
Rick Jackson
|
|
|
JIM ###-#### FIRE FN Not a final inspection- conferencce. 3/20/00 10:27:52 AM
|
BLD-Framing/Rough-in | 3/9/2000 | 3/9/2000 | 3/9/2000 | P | FAIL |
|
|
|
jim ###-#### c/n issued confirn F R of the display cabinets in wall between RR-163 and corridor158...stasir 143 ..94ubc sec 1009.3 pp 1no piping other than standpipe etc allowed. 3/9/00 10:41:08 AM
|
FIRE-Conference | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PART |
Rick Jackson
|
|
|
jim ###-#### fire conf fire extinguisher placement with architect. 3/8/00 10:09:19 AM
|
BLD-Framing/Rough-in | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PART |
|
|
|
jim ###-#### fr ok to cover behind ele mech and plmg this area 3/2/00 3:48:54 PM
|
BLD-Framing/Rough-in | 2/24/2000 | 2/25/2000 | 2/25/2000 | P | PART |
|
|
|
###-####
|
FIRE-Sprinkler Rough-in | 2/10/2000 | 2/11/2000 | 2/11/2000 | P | PART |
Rick Jackson
|
|
|
jim ###-#### ; need 1 hour corridor to use north addition
|
BLD-Framing/Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | PART |
|
|
|
jim ###-#### made ok to cover tis selected area 2/14/00 11:13:01 AM
|
FIRE-Conference | 2/3/2000 | 2/3/2000 | 2/3/2000 | | PART |
Rick Jackson
|
|
|
discussed location of annunciator panel
|
BLD-Framing/Rough-in | 1/26/2000 | 1/27/2000 | 1/27/2000 | P | PART |
|
|
|
ceiling grid \###-#### made ok to drop in tiles this area 1/27/00 6:33:47 PM
|
BLD-Other | 1/6/2000 | 1/11/2000 | 1/11/2000 | A | PASS |
|
|
|
jobsitewalkthrough with arch and contr.about handrails and fire resistive req for saunas
|
BLD-Conference | 1/6/2000 | 1/11/2000 | 1/11/2000 | A | PASS |
|
|
|
###-####- jim for conf with architects and the contractor on stairrails and for combustability of cedar in saunas
|
BLD-Conference | 1/6/2000 | 1/6/2000 | 1/6/2000 | A | PASS |
|
|
|
with john larsen to set up time for walk through an tues 1/11/00 with all parties involved.
|
BLD-Framing/Rough-in | 12/21/1999 | 12/22/1999 | 12/23/1999 | P | PART |
|
|
|
jim ###-####. Ok to cover.
|
FIRE-Sprinkler Rough-in | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | PART |
Rick Jackson
|
|
|
special needs and janitor closet okay to cover
|
FIRE-Conference | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | PART |
Rick Jackson
|
|
|
jim ###-#### conf To use new locker room- exiting requirements must be required before using.
|
BLD-Conference | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | PART |
|
|
|
jim ###-#### Received plan schedule for phased occupancy.
|
Telephone call | | | 11/22/1999 | | DONE |
|
|
|
called ###-####3. Left message with receptionist for Bob Howard.
|
Routing - PLAN CHECK | 11/10/1999 | | 11/19/1999 | | PASS |
|
|
|
plan modifications ok.
|
Plan Reviewer's activity | | | 11/19/1999 | | PASS |
|
|
|
memo sent to inspector regarding approval of modifications and that four hour column protection at exterior columns at entrance walk-way has been eliminated in accordance with board of appeals ruling of 9-22-1999. mlo
|
BLD-Framing/Rough-in | 11/16/1999 | 11/17/1999 | 11/17/1999 | P | PART |
|
|
|
JIM ###-#### made ok for 2nd floor ceiling frame around elevator shaft.
|
Routing - PLUMBING | 10/25/1999 | | 11/10/1999 | | PASS |
|
|
|
PLAN MODIFICATION PLAN REVIEW
|
BLD-Framing/Rough-in | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | PART |
|
|
|
JIM-- ###-#### -CEILING GRID INSP Ok to drop in ceiling tiles basement room ok to cover outside of Ele. Shaft @ W side.
|
BLD-Foundation | 11/2/1999 | 11/3/1999 | 11/3/1999 | A | PART |
|
|
|
grid line A 7-3 made ok w/sp insp approval.
|
Routing - PUBLIC WORKS | 10/15/1999 | 10/15/1999 | 10/25/1999 | | PEND |
|
|
|
PLAN MODIFICATION PLAN REVIEW
|
Plans ACCEPTED BY PLAN TECH | | | 10/15/1999 | | PEND |
|
|
|
PLAN MODIFICATION PREPARED FOR ROUTING. 10/15/99 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 10/15/1999 | | |
|
|
|
|
BLD-Conference | 10/12/1999 | 10/14/1999 | 10/14/1999 | A | PART |
|
|
|
at 9 am Jim ###-#### Smoke conf. Post poned until 10/18/99
|
Plan resubmittals received | | | 10/14/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM HOSFORD LARSON RUDEEN, FORWARDED SAME TO PERRY PAINE. 10/14/99 DAR
|
Plan resubmittals received | | | 10/14/1999 | | PEND |
|
|
|
RECEIVED PLAN MODIFICATION APPLICATION AND PLANS FROM HOSFORD LARSON RUDEEN,FORWARDED SAME TO PERRY PAINE. 10/14/99 DAR
|
Plan Modification Accepted | | | 10/14/1999 | | PASS |
|
|
|
modification completed on 11/19/1999. mlo
|
CHANGE STATUS TO (F) | | | 10/13/1999 | | DONE |
|
|
|
Appeal filed and lost by applicant - appeal fee of $50.00 added 10/13/99.
|
Receive PAYMENT IN FULL | | | 10/13/1999 | | DONE |
|
|
|
|
MISC ACTIONS | | | 10/12/1999 | | DONE |
|
|
|
added a plan modification fee $500.00
|
BLD-Concrete | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | PART |
|
|
|
JIM-- ###-####--REBAR & CONCRETE--GRID LINE A LINE FROM 12 TO 7 Made ok with sp. Msp. Approval
|
BLD-Conference | 9/23/1999 | 9/24/1999 | 9/24/1999 | A | PART |
|
|
|
JIM-- ###-#### CONF Jim/JW Bob H/Larson stair #172 A2.15 address light box penetration
|
INSP - Conference | 9/8/1999 | 9/10/1999 | 9/10/1999 | A | PART |
|
|
|
ONSITE CONFERANCE, JIM and moke otto walked jobsite and discusses lifesafety and exiting requirements and for the protection of the building occupants during construction ###-####
|
INSP - Foundation | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PART |
|
|
|
REBAR AND CONCRETE, GRID LINE 12, D-A, JIM ###-#### sp insp made ok
|
SUPER- Supervisor's review | 9/3/1999 | 9/3/1999 | 9/3/1999 | | |
|
|
|
perry is watching this no constuction on walkway at this time
|
SUPER- Supervisor's review | 9/1/1999 | 9/1/1999 | 9/1/1999 | | |
|
|
|
support colums for exterior overhang are to be 4 hour per plan contractor is apealing
|
INSP - Concrete | 8/30/1999 | 8/31/1999 | 8/31/1999 | A | PART |
|
|
|
08/31/99 338 - REBAR POUR GRID LINE 12 D TO A JIM ###-#### SP INSP APP
|
Fee Review-notes | 4/2/1999 | | 8/24/1999 | | |
|
|
|
AS PER MIKE OTTO PLEASE REVIEW FEES FOR MECH/PLUMBING 4/8/99 per jordan-wilcomb new cert. project value 5,659,963.00 lh
|
INSP - Concrete | 8/20/1999 | 8/20/1999 | 8/20/1999 | P | PART |
Jim Storey
|
|
|
08/20/99 301 - JIM ###-####. GRID LINE 2 FROM D-C. covered by special in
|
Plan resubmittals received | | | 8/20/1999 | | PEND |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM ROBERT HOWARD OF HOSFORD LARSON RUDEEN ARCHITECT, FORWARDED SAME TO DAVID LIGHTFOOT. 8/20/99 DAR DAVE LIGHTFOOT RETURNED PLANS STATING THE CHANGE WAS BEYOND WHAT HE HAD TALKED TO THE CONTRACTOR ABOUT. FORWARDED PLANS TO MIKE OTTO FOR A DETERMINATION ON HOW TO HANDLE THE RESUBMITTAL. 8/23/99 DAR
|
INSP - Concrete | 8/9/1999 | 8/10/1999 | 8/10/1999 | P | PART |
|
|
|
08/10/99 338 - JIM ###-####. ENTERY WALLS OF NORTH ADDITION-SHEET F2 C ON S14. r-bar placed sp insp on site
|
INSP-Conference | 8/4/1999 | 8/4/1999 | 8/4/1999 | | PART |
|
|
|
Received letter of transmittal from arch on the project for an appeal on fire protection rating of exterior columns. Per supervisor an appeal shall be taken to the appeals board. This paperwork is delivered to M. Southard.
|
INSP - Concrete | 7/28/1999 | 7/29/1999 | 7/29/1999 | P | PART |
|
|
|
07/29/99 338 - MADE OK WITH SP INSP APPROVALS
|
Plan resubmittals received | | | 7/28/1999 | | PASS |
|
|
|
RECEIVED PLUMBING PLAN RESUBMITTALS FROM ELKHORN ENGINEERS. THEY WERE APPROVED BY GARY ZIEGLER. THEN ONE SET TO RECORD AREA AND ONE SET TO JOB SET TO JOB SITE VIA HOSFORD LARSON AND RUDEEN. 7/28/99 DAR DS
|
INSP - Foundation | 7/20/1999 | 7/21/1999 | 7/21/1999 | P | PART |
|
|
|
07/21/99 338 - BEAMS AND FOUNDATION NORTH ADDITION JIM ###-#### made ok
|
INSP-Conference | 7/21/1999 | 7/21/1999 | 7/21/1999 | | PART |
|
|
|
With Bob Howard, recieved details of the proposed tempory stairs from the natatorium when the doors at the southwest corner are made unsafe to use. Wood is allowed in this type of construction as long as it is of 2" nom thickness. All other requirements for the stairs must comply with ubc chap. 10. will relay answer on the forms submitted by fax and return by fax to arch. see file.
|
INSP-Conference | 7/21/1999 | 7/21/1999 | 7/21/1999 | P | PART |
|
|
|
bob with the Arch, firm of Hosford-Larson-Rudeen with questions on the temp stairs at the pool area near the new elevator shaft. wood framing is acceptable as long as all codes for rise run, rails and landings comply. also confirmed that two (2) exits are required for the pool area if it is in use. Covered walkway protection may be required for the main exit from the pool area.
|
INSP - Foundation | 7/7/1999 | 7/8/1999 | 7/7/1999 | P | PART |
|
|
|
REBAR JIM ###-#### COLUMN PADS 11.3 12 LINE AND N SP INSP MADE OK 338
|
INSP - Concrete | 6/28/1999 | 6/29/1999 | 6/28/1999 | P | PART |
|
|
|
06/29/99 338 - grid line N and 8 and 9 made ok with sp insp approvals
|
Plan resubmittals received | | | 6/24/1999 | | PEND |
|
|
|
Received plan resubmittals from Hosford Larson Rudeen, forwarded same to Gary Ziegler. DAR 6/24/99
|
INSP - Foundation | 6/18/1999 | 6/21/1999 | 6/21/1999 | A | PART |
|
|
|
06/21/99 338 - Grid Line L and 6 Jim ###-#### ok with sp insp
|
Routing - FIRE | 6/11/1999 | | 6/11/1999 | | FAIL |
|
|
|
FIRE ALARM PLAN REVIEW ISSUES
|
INSP - Concrete | 6/9/1999 | 6/10/1999 | 6/10/1999 | A | PART |
Wes Worcester
|
|
|
06/10/99 342 - JIM ###-#### no answer, still tying bar,spec insp??? FOUN
|
INSP - Foundation | 6/3/1999 | 6/4/1999 | 6/4/1999 | A | PART |
|
|
|
06/04/99 338 - madeok to pour with sp insp approvals
|
INSP - Foundation | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | PART |
|
|
|
06/03/99 338 - ###-####//REBAR FOOTING & WALL ON GRID 6 & L sp insp made
|
INSP - Foundation | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
|
|
|
06/02/99 338 - madeok conf with sp insp eng ctr and arch on concrete sch
|
INSP - Foundation | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
|
|
|
06/02/99 338 - conf on the concrete design placement and insp with arch,
|
Issue PAID IN FULL permit | | | 4/9/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/1999 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/2/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/2/1999 | | |
|
|
|
|
Telephone call | | | 4/2/1999 | | |
|
|
|
CALLED TALKED TO BOB GAVE DOLLAR AMOUNT TOLD HIM ABOUT ACHD
|
Plan assigned to (MLO) | 12/1/1998 | | 4/2/1999 | | PASS |
Mike Otto
|
|
|
|
Routing - FIRE | 3/29/1999 | | 4/1/1999 | | PASS |
|
|
|
FIRE ALARMS ON DELAYED - NO ROUGH IN
|
Routing - PLAN CHECK | 3/29/1999 | | 3/29/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/26/1999 | | PEND |
|
|
|
resubmittals for plan review received late PM.
|
Routing - FIRE | 3/24/1999 | | 3/25/1999 | | FAIL |
|
|
|
no or incomplete response to all 4 resubmittals
|
Routing Off Site - STRUCTURAL | 12/11/1998 | | 3/24/1999 | | PASS |
|
|
|
12-11-98 RECEIVED ONE COPY OF PLANS FOR OUTSIDE ENG. WITH ONE COPY OF PROJECT MANUAL. CONTACTED PDQ TO TAKE PLANS OUT TO ATWOOD, HINZMAN, AND JONES PER MIKE O. KMM
|
Plan resubmittals requested | | | 3/24/1999 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Routing - PLAN CHECK | 3/17/1999 | | 3/24/1999 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 3/17/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED ARCHITECTURAL DRAWINGS THREE COPIES OF REVISED STRUCTURAL DRAWINGS THREE COPIES OF REVISED POOL DRAWINGS THREE COPIES OF REVISED MECH., PLUMB., AND ELECT. DRAWINGS ONE COPY OF ARCHITECTURAL RESPONSE LETTER ONE COPY OF MECH. RESPONSE LETTER ONE COPY OF ELECT. RESPPONSE LETTER ROUTED TO MIKE OTTO. KMM
|
Routing - FIRE | 3/2/1999 | | 3/4/1999 | | FAIL |
|
|
|
|
Plan Review Completed(1st rev) | | | 3/4/1999 | | FAIL |
|
|
|
ubc & UFC issues
|
Routing - PLAN CHECK | 2/12/1999 | | 3/2/1999 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 3/2/1999 | | FAIL |
|
|
|
CORRECTIONS MAILED TO ARCHITECT. MLO
|
Routing - PLANNING | 2/4/1999 | | 2/12/1999 | | PASS |
|
|
|
x-ref. DRH98-0136. Also subject to submittal of a revised landscape plan including landscaping along 11th Street and Forestry's comments per Design Review approval.
|
Routing - PLANNING | 2/4/1900 | | 2/8/1999 | | PASS |
|
|
|
Revised landscaping plan needs to be submitted reflecting Conditional Use Permit conditions, particularly sidewalk locations and landscaping along sidewalks. TAC 2/8/99
|
Routing - PLUMBING | 2/3/1999 | | 2/4/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/19/1999 | | 2/3/1999 | | PASS |
|
|
|
|
Routing Off Site - C.D.H | 11/27/1998 | | 1/15/1999 | | PASS |
|
|
|
12-11-98 RECEIVED A CALL FROM MR. LARSON ABOUT GETTING ADD. PLANS TO CDH SO WE COULD ROUTE ORIGINAL SET TO PW. I HAD MR. LARSON SPEAK WITH MIKE. MIKE STATED THAT WAS NOT OUR PROCEDURE. WE WILL KEEP AS IS. KMM
|
Received Certificate of Value | | | 1/11/1999 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 11/24/1998 | | 11/30/1998 | | PASS |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | 11/27/1998 | | 11/27/1998 | | |
|
|
|
|
Application received | | | 11/24/1998 | | |
|
|
|
|
Plan assigned to (MYS) | 11/24/1998 | | 11/24/1998 | | PASS |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/24/1998 | | |
|
|
|
|