Case Summary (BLD) | | | 4/8/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/16/2005 | | |
|
|
|
|
INSP - Framing/Rough-in | 6/23/1999 | 6/24/1999 | 6/1/2000 | A | NR |
Carl Dependahl
|
|
|
06/24/99 340 - shaft wall Roger ###-####
|
Permanent Occupancy | | 12/21/1999 | 12/21/1999 | | DONE |
|
|
|
|
BLD-Final | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | PASS |
Alan Hauser
|
|
|
Final on Albertson's Ok for perm. occ.
|
Permanent occupancy UNPAID FEE | | | 12/21/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #8056 issued 12-20-99 to Albertson's.
|
Code Occupancy Approval | | | 12/20/1999 | | PASS |
|
|
|
Meets compliance with CUP98-128/CU-71-94 MOD
|
BLD-Final | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | PART |
Jim Sly
|
|
|
ROGER--- ###-#### FN OCC INSP C/N need req. signatures and obstain perm. Occ. Status within 90 days of this notice.
|
FIRE-Final Inspection | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | PASS |
Joe Tawney
|
|
|
###-####-- ROGER FIRE INSP Reinsp. Ok for perm. Occ.
|
Temporary occupancy | | | 11/2/1999 | | PART |
|
|
|
Temp. Occ. Cert. #3938 issued 11-2-99 to Albertson's.
|
FIRE-Final Inspection | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | FAIL |
Joe Tawney
|
|
|
ROGER ###-#### Reinsp. Fail fire hydrants and sprkl. Obstructions.
|
BLD-Final | 10/28/1999 | 10/29/1999 | 10/29/1999 | P | FAIL |
Jim Sly
|
|
|
ROGER ###-#### need all req. signatures
|
FIRE-Final Inspection | 10/12/1999 | 10/13/1999 | 10/13/1999 | P | NR |
Joe Tawney
|
|
|
Roger ###-#### Contractor not ready
|
FIRE-Final Inspection | 10/6/1999 | 10/11/1999 | 10/11/1999 | P | FAIL |
Joe Tawney
|
|
|
roger ###-#### final fail c/n issued
|
BLD-Final | 10/7/1999 | 10/8/1999 | 10/8/1999 | A | FAIL |
Jim Sly
|
|
|
CORRECTION NOTICE TOILETS TO BE 18" FROM WALL'###-#### FN OCC
|
BLD-Final | 10/8/1999 | 10/8/1999 | 10/8/1999 | | FAIL |
Joe Tawney
|
|
|
FINAL FAILED WORK NO COMPLETED
|
FIRE-Final Inspection | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | PASS |
Rick Jackson
|
|
|
terry ###-#### hydro test o.h u.g
|
BLD-Framing/Rough-in | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | PART |
Jim Sly
|
|
|
ROGER-- ###-#### CEILING INSP Ceiling grid ok
|
BLD-Framing/Rough-in | 9/23/1999 | 9/24/1999 | 9/24/1999 | A | FAIL |
Jim Sly
|
|
|
ROGER CEILING ALSO ###-#### C/N ceiling grid seismic pods.
|
Receive PAYMENT IN FULL | | | 9/22/1999 | | DONE |
|
|
|
|
Sprinkler Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PART |
Joe Tawney
|
|
|
ok on supply line flush
|
INSP-Supply line flush | 9/1/1999 | 9/1/1999 | 9/1/1999 | | NR |
Joe Tawney
|
|
|
/ / 406 - FLUSH NOT READY KEY BOX OBSTRUCTED
|
INSP-Conference | 8/26/1999 | 8/26/1999 | 8/26/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - CONF ON SPKLR ISSUES
|
Fee Review-notes | 3/3/1999 | | 8/20/1999 | | |
|
|
|
|
INSP - Framing/Rough-in | 7/29/1999 | 8/2/1999 | 8/2/1999 | A | PASS |
Jim Sly
|
|
|
08/02/99 316 - All framing appears OK pending special insp approvals
|
Telephone call | | | 7/22/1999 | | PASS |
|
|
|
craig ###-####
|
Routing - PLAN CHECK | 7/14/1999 | | 7/22/1999 | | PASS |
|
|
|
plan taken to front desk this date.mlo
|
INSP - Framing/Rough-in | 7/19/1999 | 7/20/1999 | 7/20/1999 | A | PART |
Jim Sly
|
|
|
07/20/99 316 - All interior Frame OK except North soffit ...and ext cano
|
INSP-Sprinkler Rough-in/Hydro | 7/16/1999 | 7/16/1999 | 7/16/1999 | | PART |
Joe Tawney
|
|
|
/ / 406 - OK ON PARTIAL ROUGH IN FRONT & REAR ROOMS
|
Plan resubmittals received | | | 7/14/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA ARCHITECTS, FORWARDED SAME TO MIKE OTTO. DAR 7/14/99
|
INSP - Framing/Rough-in | 6/30/1999 | 7/2/1999 | 7/2/1999 | A | PART |
Jim Sly
|
|
|
07/02/99 316 - Canopy, draftstop 90% compl, rear wall by Mezzanine & N.w
|
SUPER- Supervisor's review | 6/28/1999 | 6/28/1999 | 6/28/1999 | | PEND |
|
|
|
Effis or drivit system allowed on exterior of north wall, (exterior side), at this time. When adjacent building is constructed no combustible materials will be allowed at parapet.
|
SUPER- Supervisor's review | 6/25/1999 | 6/25/1999 | 6/25/1999 | | PEND |
|
|
|
Site review of plans and requirements. Sly has a good handle on this project. Construction not as difficult as project on Federal Way.
|
INSP - Framing/Rough-in | 6/24/1999 | 6/24/1999 | 6/24/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - 1HR SHAFT AT BAKERY....OK
|
INSP - Framing/Rough-in | 6/14/1999 | 6/15/1999 | 6/16/1999 | P | PART |
Carl Dependahl
|
|
|
06/15/99 340 - ###-#### ROGER//FRAMING 316 area, conf only: 1hr shaft, f
|
Routing - FIRE | 6/10/1999 | | 6/11/1999 | | PASS |
|
|
|
Field check hazards in storage room addressed in reviews. Provide letter of limits for storage of hazardous materials 9/17/1999. JWA
|
Plan Review Completed(1st rev) | | | 6/11/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 6/2/1999 | | 6/9/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/23/1999 | | 6/2/1999 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 6/2/1999 | | FAIL |
|
|
|
REQUESTED REVISED ELECTRICAL SHEET FOR PLACEMENT OF REQUIRED EXIT SIGNAGE. MLO
|
Plan Modification Accepted | | | 5/21/1999 | | |
|
|
|
|
INSP - Foundation | 4/1/1999 | 4/2/1999 | 4/2/1999 | A | PART |
Jim Sly
|
|
|
04/02/99 316 - North and West foot appears OK Pending special insp appro
|
(F) Reprint permit | | | 3/9/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/5/1999 | | |
|
|
|
|
Plan assigned to (MLO) | 11/25/1998 | | 2/4/1999 | | PASS |
Mike Otto
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/1999 | | PASS |
|
|
|
|
Telephone call | | | 2/4/1999 | | |
|
|
|
left message
|
Inspection Record Card- Bld | | | 2/4/1999 | | |
|
|
|
|
Print Occupancy Form | | | 2/4/1999 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/1/1999 | | 2/3/1999 | | PASS |
|
|
|
|
Routing - FIRE | 1/26/1999 | | 1/29/1999 | | PASS |
|
|
|
refer machine room is not required. open cell meets requirements if 12" cells
|
Routing Off Site - STRUCTURAL | 12/30/1998 | | 1/25/1999 | | PASS |
|
|
|
Resubs sent via PDQ DAR 12/30/98
|
Routing - PLAN CHECK | 1/25/1999 | | 1/25/1999 | | PASS |
|
|
|
PUTTING STATUS TO PENDING DUE TO POSSIBLE MACHINERY ROOM REQUIEMENTS FOR EXCEEDING ALLOWALBE AMOUNT OF REFRIG. IN SINGLE SYSTEM PER FV, FIRE. 01\28\99 MLO
|
Plan resubmittals received | | | 1/25/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS 3.0A, 3.0B, 3.1 3.2, 3.3A, 3.7A, 3.8, AND 3.9A. ONE COPY OF MODIFICATIONS IN RESPONSE TO MIKE OTTO'S LETTER DATED JAN. 7-99. ROUTED TO MIKE O. KMM
|
Routing - FIRE | 1/8/1999 | | 1/13/1999 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 1/13/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEET 1.7A. WITH COVER LETTER FROM CSHQA. PUT WITH THE PLANS WHICH WERE IN THE FIRE DEPARTMENT. FLOYD THEN TOOK TO MIKE O. KMM
|
Plan Review Completed(1st rev) | | | 1/13/1999 | | FAIL |
|
|
|
failed UBC, PW, UFC
|
Routing - PLAN CHECK | 12/31/1998 | | 1/7/1999 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Plan resubmittals requested | | | 1/7/1999 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Plan resubmittals received | | | 1/4/1999 | | |
|
|
|
RECEIVED DESIGNER RESPONSES, REVISED CALCULATIONS, AND REVISED PLANS. ROUTED TO MIKE O.
|
INSP - Final | 7/14/1999 | 7/16/1999 | 1/1/1999 | A | FAIL |
Alan Hauser
|
|
|
07/16/99 350 - #316 to check monday
|
Routing - PUBLIC WORKS | 12/30/1998 | | 12/31/1998 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/14/1998 | | 12/30/1998 | | PEND |
|
|
|
REVIEW INCOMPLETE PROPERTY LINES IN QUESTION PLANS SENT TO PUBLIC WORKS MLO
|
Plan resubmittals received | | | 12/29/1998 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS 2.0A, 2.2B, 2.3, AND ONE COPY OF LETTER ADDRESSING YOUR COMMENTS FOR THE ALBERTSON'S STORE #177. ROUTED TO MIKE 0. KMM
|
Plan resubmittals received | | | 12/15/1998 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM CSHQA, FORWARDED SAME TO MIKE OTTO. DAR 12/15/98
|
Routing - PLANNING | 12/11/1998 | | 12/14/1998 | | PASS |
|
|
|
|
Routing - PLUMBING | 12/11/1998 | | 12/11/1998 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 12/11/1998 | | FAIL |
|
|
|
STRUCTURAL REVIEW COMMENTS FAXED TO CSHQA. MLO
|
Routing - PUBLIC WORKS | 12/3/1998 | | 12/10/1998 | | FAIL |
|
|
|
PRODUCE AREA DISPOSER TO BE ELIMINATED. RESUBMITT NEW SHEET. WALT REQUIRES STREET LIGHT PLAN. WWC REQUIRES DRAINAGE PLAN ( ADDITIONAL COPIES) BM
|
Routing Off Site - STRUCTURAL | 11/25/1998 | | 12/10/1998 | | FAIL |
|
|
|
SENT FOR REVIEW 11/25/98 BY PDQ. DAR PLANS AND COMMENTS RETURNED. ROUTED TO MIKE O. KMM
|
Routing Off Site - C.D.H | 11/25/1998 | | 12/3/1998 | | PASS |
|
|
|
CALLED RICK SINNARD TO TAKE THE PLANS TO CDH.11/25/98 DAR
|
Plans ACCEPTED BY PLAN TECH | 11/25/1998 | | 11/25/1998 | | |
|
|
|
|
Plan assigned to (MYS) | 11/24/1998 | | 11/25/1998 | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/24/1998 | | |
|
|
|
|
Application received | | | 11/24/1998 | | |
|
|
|
|