Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD98-03705
StatusExpired
Name BOISE TOWER
Site Address 800 W MAIN ST
Project NameBOISE TOWER-SHELL/CORE
Customer Number 
ePlanReviewNo
Description
BOISE TOWER (SHELL & CORE)* TO CONSTRUCT A NEW 387,380 SQ. FT., 25 STORY WITH 18,800 SQ. FT. BASEMENT SHELL AND CORE BUILDING. THIS BUILDING WHEN FINISHED WILL CONTAIN RETAIL, OFFICE, PARKING AND RESIDENTIAL. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF CONCRETE STRUCTURAL FRAME AND STEEL ROOF FRAME, MASONRY AND METAL STUD NONBEARING EXTERIOR WALLS. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THIS IS A SHELL AND CORE PERMIT ONLY. THERE IS NO PLUMBING, ELECTRICAL, MECHANICAL OR FIRE SUPPRESSION SYSTEMS APPROVED UNDER THIS PERMIT, THESE ARE ALL DEFERRED ITEMS THAT MUST BE REVIEWED AND APPROVED BEFORE INSTALLATION. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH EACH TENANT SPACE. DRH#98-0071/98-0132/98-0217/98-0233/PC#809-98/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired9/15/20109/15/20109/15/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection9/10/20109/10/20109/15/2010 PASS
DetailsDave Hannah
BLD-Conference11/29/200711/29/200712/5/2007ACANC
DetailsDave Hannah
per your request
Office Staff conference/action  10/24/2007 DONE
Spoke with Gary Rogers regarding permit expiration. Informed Mr. Rogers that the last activity at the site by the City was an inspection performed on April 17, 2007. Unless there is work that is unknown by the the City, the permit would have expired on October 15, 2007. Asked Mr. Rogers to produce documentation that work has occurred on the site since April 17, 2007.
BLD-Conference10/18/200710/18/200710/18/2007PFAIL
DetailsDave Hannah
I check project no work has been done that I can see
BLD-Concrete4/17/20074/17/20074/17/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/17/2007 at 12:33:36 AM. Contact: ###-####. crew pour a peice of slab on grad about 8x8 in the ne corner
BLD-Foundation4/11/20074/12/20074/12/2007APART
DetailsDave Hannah
Dan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus talked with dan from mcalvain jenifer gilliland and bruce chatterton. mcalvain will pour a section of slab on grade
(F) Reprint permit  3/22/2007  
BLD-Concrete10/16/200610/17/200610/17/2006PPART
DetailsDave Hannah
gary; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles slab on grade grid lines 2-3 and g-f ok to pour 4inch slab after rebar is removed
BLD-Concrete10/13/200610/16/200610/16/2006APASS
DetailsDave Hannah
gary rogers - Pleae call 1/2 hr prior inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles meet on site crew is going to pour slab on grade
BLD-Concrete4/3/20064/4/20064/4/2006APART
DetailsDave Hannah
###-#### - gary rebar ok ok to set forms for column b1 ground level
BLD-Concrete10/12/200510/13/200510/14/2005APART
DetailsDave Hannah
kent; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa two columns nw corner ok after spec signs off
BLD-Footing4/28/20054/28/20054/28/2005PPART
DetailsDave Hannah
carl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore george and I talk to mr peterson they are going to pour the slab for the elec room some time in the next week
Reopen Permit (ISS)  11/4/2004  
permit re-opened per Jenifer G.
BLD-Footing5/2/20045/3/20045/3/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/2/2004 at 9:43:38 PM. Contact: ###-####. crew on site preping rebar for backfilling along main crew has removed all wood forms rebar trash ect and placed 3/4 chips up to top off bldg pad and stacked 2x3x4 concrete blocks along main 5/3/2004 10:59:23 AM
BLD-Concrete4/20/20044/21/20044/21/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/20/2004 at 12:04:14 PM. Contact: ###-####. crew placed concrete along south 10 ft of main foundation for retainning wall 4/21/2004 10:08:42 AM
BLD-Conference4/14/20044/14/20044/14/2004ADONE
DetailsDave Hannah
on site at around 10:00am with George slane and Chuck rauch chuck had mti on site friday the 9th they had issued a c/n to clean and get clearance on rebar mat chuck had crew complete this work and rescheduled spec inspection for this morning 4/14/2004 10:34:28 AM
BLD-Other4/14/20044/14/20044/14/2004PPART
DetailsDave Hannah
on site to look at rebar chuck and mike spiker on site with me rebar looks ok meeds trash cleaned out and clearances in one or to areas 4/14/2004 4:23:26 PM
Inspection Record Card- Bld  3/17/2004 DONE
Print Occupancy Form  3/17/2004 DONE
BLD-Framing/Rough-in10/17/200310/17/200310/17/2003PPART
DetailsDave Hannah
brianbrian rebar; Phone #: ###-#### Internet Inspection Request from: Annette Moore got ok from john menard on change of pt slab to rebar for 19 x 9 area at exit called brian burford and gave him the ok to pour monday 10/20/2003 8:32:13 AM
Plan Reviewer's activity  10/17/2003 PASS
Approved faxed plan modification for slab #2 (9'x20') reinforced concrete slab located a grade level between grid lines E&F and north of grid line 1.
BLD-Concrete10/13/200310/14/200310/14/2003APART
DetailsDave Hannah
slab on grade north side of bld and walls of elec valt along 8th street 10/14/2003 11:14:09 AM 10/14/2003 11:15:10 AM
BLD-Concrete10/10/200310/13/200310/13/2003ANR
DetailsDave Hannah
BLD-Concrete10/13/200310/13/200310/13/2003PNR
DetailsDave Hannah
BLD-Foundation10/10/200310/10/200310/10/2003PNR
DetailsDave Hannah
BRYAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Concrete10/10/200310/10/200310/10/2003ACANC
DetailsDave Hannah
BLD-Conference10/9/200310/9/200310/9/2003PDONE
DetailsDave Hannah
met with engineer walked site talked about what he is putting on his site evaluation I told him and rick to submet all changes to plan reveiw mti not on site 10/9/2003 12:40:44 PM
BLD-Conference10/8/200310/8/200310/8/2003ADONE
DetailsDave Hannah
had a meeting with Rick Peteron his engineer Guy Conversano Tory McAlvain and his construction team George Slane and Jim Storey from city of boise. we disscussed gitting the project restarted and what we from the city needed . the engineer will walk site and make a list of site requirerment .there will be another meeting between engineer spec inspetion group myself on that needs to be done befor any concrete con be placed also rick still needs to send a letter to the city outlining up coming work also need a meeting with plan reveiw abut how changes to plans will be handled 10/8/2003 2:19:18 PM
BLD-Conference10/7/200310/7/200310/7/2003 DONE
DetailsGeorge Slane
reviewed area for pour which is upper slab at street level which provides exiting from the stair tower. Rebar to be cleaned and steel for slab mat is on site. Exterior form which was existing has been removed and will be reset to encompass new steel mat. There is a question by the contractor about changing the section which is a pt slab to reinforced concrete. The original plan is for a pt slab and that is what has been approved. To change would require a plan modifcation and would have to go through the approval process. Work is in progress on this area, A meeting with all design team member should occur on the 8th.
BLD-Conference10/3/200310/6/200310/6/2003APASS
DetailsJim Storey
letter of scope of work and engineers evalueation archived from site insp. form and rebar instalation in progess. 10/10/2003 1:54:00 PM insp. performed on 10/6/03 am 10/10/2003 1:54:51 PM
BLD-Footing10/3/200310/3/200310/3/2003PCANC
DetailsTony Young
bryan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
per 305, rescedule to 305 for 10/06/03 am 10/3/2003 3:41:57 PM
UnFreeze Case  4/9/2003 DONE
per council decision to uphold the appeal from Boise Tower Associates concerning the expiration of this permit, reactivated this permit per Tim Hogland & Jenifer Gilliland /lh
Meeting  3/11/2003  
Permit EXPIRED  2/13/2003 DONE
per Tim Hogland Letter hand delivered to Rick Peterson on Feb. 11, 2003. JG/LH
BLD-Footing1/8/20031/9/20031/9/2003ANR
DetailsCarl Dependahl
chuck 3426641,###-####, verify spec insp 1/9/2003 11:29:07 AM
BLD-Footing1/8/20031/9/20031/9/2003ANR
DetailsCarl Dependahl
chuck 3426641,###-####
BLD-Footing1/9/20031/9/20031/9/2003PPART
DetailsCarl Dependahl
bottom foundation mat ok pend spec insp report 1/9/2003 4:08:08 PM
BLD-Footing1/7/20031/8/20031/8/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/07/2003 at 15:49:59. Contact: ###-####. ...need spec insp ok prior to pour. 1/9/2003 9:36:42 AM
BLD-Footing12/11/200212/12/200212/12/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/11/2002 at 11:26:57. Contact: ###-####....observed wip...all pending Special Insp. reports. 12/12/2002 1:11:23 PM
BLD-Footing12/11/200212/11/200212/11/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/11/2002 at 11:26:10. Contact: ###-####.
BLD-Conference12/10/200212/10/200212/10/2002PPASS
DetailsCarl Dependahl
w. G.S. re agreement & observation at site...work conditionally ok'd to continue 1 2/10/2002 2:36:02 PM 12/10/2002 2:39:00 PM
BLD-Conference7/18/20027/19/20027/19/2002PPASS
DetailsCarl Dependahl
Dustin ; rec'd MTI reports, column conc. comp. test failed, awaiting eng's analysis 7/19/2002 3:26:52 PM
BLD-Conference6/26/20026/26/20026/26/2002PPASS
DetailsCarl Dependahl
NOTE: WORK IS STOPPED...NO CONCRETE BEING PLACED AT THIS TIME ...WORK CREWS APPEAR TO BE "PULLED"...CRANE STILL IN PLACE 6/26/2002 12:29:20 PM 6/26/2002 12:32:19 PM
BLD-Conference5/1/20025/3/20025/3/2002PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/01/2002 at 09:23:36. Contact: ###-####. cancel pour 5/3/2002 5:55:55 PM
BLD-Concrete5/3/20025/3/20025/3/2002APART
DetailsCarl Dependahl
pad, wip, pend reports
BLD-Conference5/3/20024/29/20025/3/2002APASS
DetailsCarl Dependahl
w/ supt re concrete & exits 5/3/2002 5:55:19 PM
BLD-Foundation5/1/20025/2/20025/2/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/01/2002 at 09:22:42. Contact: ###-####.wip cols, pad forms...pend reports 5/2/2002 6:42:53 PM
BLD-Foundation5/1/20025/1/20025/1/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/01/2002 at 09:21:55. Contact: ###-####.wip, cols 5/1/2002 5:14:11 PM
BLD-Concrete4/30/20024/30/20024/30/2002PPART
DetailsCarl Dependahl
col forms, wip...beginning forms for 5' deep pad
BLD-Foundation4/22/20024/24/20024/24/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/22/2002 at 07:50:00. Contact: ###-####. pile caps & wall north side...pend report. 4/24/2002 3:16:40 PM
BLD-Footing4/22/20024/22/20024/22/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/22/2002 at 07:48:03. Contact: ###-####. wall, col's at NW side. 4/22/2002 3:15:58 PM
BLD-Footing4/15/20024/17/20024/17/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/15/2002 at 08:01:32. Contact: . Subject to special inspection I have not been to site this day. 4/17/2002 3:50:01 PM
BLD-Conference4/15/20024/16/20024/16/2002ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/15/2002 at 08:07:50. Contact: ###-####.reveiwed inspection reports 4/16/2002 10:16:59 AM
BLD-Foundation4/15/20024/16/20024/16/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/15/2002 at 08:00:44. Contact: .west basement wall north 40ft 4/16/2002 10:16:28 AM
BLD-Footing4/10/20024/12/20024/12/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/10/2002 at 08:52:02. Contact: . pending spec insp 4/12/2002 1:35:01 PM
BLD-Conference4/11/20024/11/20024/11/2002APASS
DetailsCarl Dependahl
rec'd "crack monitoring" report of adjacent bldgs , ok
BLD-Foundation4/8/20024/11/20024/11/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/08/2002 at 15:12:22. Contact: . cols, wip...ok pend report. looks ok. 4/11/2002 2:32:12 PM
BLD-Footing4/8/20024/10/20024/10/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/08/2002 at 15:11:36. Contact: . pending report, looks ok. 4/10/2002 10:16:41 AM
BLD-Conference4/10/20024/10/20024/10/2002PPASS
DetailsCarl Dependahl
met onsite w new supt...Ron, discussed ongoing exit issues
BLD-Foundation4/8/20024/9/20024/9/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/08/2002 at 15:11:09. Contact: . column/wall/ ftg...ok pend spec insp report. 4/9/2002 1:29:37 PM
BLD-Footing4/8/20024/8/20024/8/2002PPART
DetailsCarl Dependahl
ok to put in for today per carl dependahl allen ###-#### pend report 4/8/2002 4:57:05 PM
BLD-Foundation4/8/20024/8/20024/8/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/8/2002 4:18:25 PM ok pend MTI report
BLD-Foundation4/2/20024/5/20024/5/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/02/2002 at 12:07:05. Contact: . pend report 4/5/2002 5:41:56 PM
BLD-Foundation4/2/20024/4/20024/4/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/02/2002 at 12:06:24. Contact: . wall north side; pend Mti report. 4/4/2002 1:22:01 PM
BLD-Foundation4/2/20024/3/20024/3/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/02/2002 at 12:05:41. Contact: . 4/3/2002 12:46:47 PM
BLD-Conference4/2/20024/2/20024/2/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/2/2002 4:17:16 PM rec'd soils & concrete tests re wall const & backfill, wip
BLD-Conference4/1/20024/1/20024/1/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 4/1/2002 10:36:03 AM Chuck re c/n...rec'd temp exit plan & crack monitoring as requested; discussed w/ plan chk 4/1/2002 5:16:42 PM
BLD-Conference3/26/20023/27/20023/27/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/26/2002 2:54:30 PM
BLD-Foundation3/26/20023/26/20023/26/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/26/2002 at 08:01:22. Contact: . wall/ftgs ok pend MTI report 3/26/2002 3:38:31 PM
BLD-Footing3/20/20023/22/20023/22/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/20/2002 at 09:36:06. Contact: .ftg ok pend MTI report; keep c/n re exit maintenence proposal & ecology block retaining wall. 3/22/2002 12:14:42 PM
BLD-Foundation3/20/20023/21/20023/21/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/20/2002 at 09:35:33. Contact: . rebar placement in progress at north wall; correction issued re maintenence of s.w. stair tower exit from bank bldg...need proposal for exit "protection" by 3-29 3/21/2002 11:17:48 AM
BLD-Footing3/15/20023/20/20023/20/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/15/2002 at 15:57:40. Contact: . pend report from mti 3/20/2002 2:03:46 PM
BLD-Footing3/20/20023/20/20023/20/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/20/2002 at 09:34:06. Contact: . wip...MTI onsite. 3/20/2002 2:08:38 PM
BLD-Footing3/15/20023/19/20023/19/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/15/2002 at 15:56:56. Contact: .Mti onsite, ok pend report. 3/19/2002 11:28:42 AM
BLD-Footing3/15/20023/18/20023/18/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/15/2002 at 15:56:16. Contact: . MTI onsite, ok pend report. 3/18/2002 11:13:45 AM
BLD-Footing3/11/20023/14/20023/14/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/11/2002 at 11:37:30. Contact: . col ftg/pile cap ok pend report. 3/14/2002 11:20:51 AM
BLD-Footing3/11/20023/13/20023/13/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/11/2002 at 11:36:55. Contact: . north side int col ftgs ok pend report 3/13/2002 2:58:46 PM
BLD-Footing3/11/20023/12/20023/12/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/11/2002 at 11:36:13. Contact: . int ftg/ pile caps. 3/12/2002 1:31:35 PM
BLD-Footing3/11/20023/11/20023/11/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/11/2002 4:26:59 PM int. column ftgs/pile cap assy...MTI onsite,tie steel detail discrepancy noted,repair made ok.
BLD-Conference3/4/20023/4/20023/4/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/4/2002 3:18:35 PM crane erection underway
BLD-Concrete2/27/20022/27/20022/27/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/27/2002 4:18:33 PM Tower crane pad; add'l vertical steel for close col's in place; MTI onsite, ok to proceed.
BLD-Conference2/8/20022/8/20022/8/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/8/2002 11:34:46 AM 2pm at PDS, excavation permit modification to follow per Marlene; rec'd eng's soils test approval. 2/8/2002 4:25:28 PM
Print permit w/o conditions  2/4/2002  
BLD-Conference1/30/20021/30/20021/30/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/30/2002 9:57:57 AM w/ Alan Gammel; submit exit plans for S.W. stair tower from exist bank bldg (during const.)
BLD-Conference1/24/20021/24/20021/24/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/24/2002 10:22:19 AM w Marlene re excavation review/reports...addl pemit issued MIS 01- 00012?
BLD-Conference1/23/20021/23/20021/23/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/23/2002 11:32:20 AM w/ Allan Gamel at site; keep c/n re soils test & excavation methodology...response in progress. Work is halted temporarily.
BLD-Concrete1/4/20021/4/20021/4/2002AFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 1/4/2002 12:07:40 PM met w/ Alan G.& MTI at site,c/n: need eng's approval of caisson soils brg tests & clarify if control need for heat at 2800 yd. mat. Crane/auger for caissons being removed
Routing Off Site - STRUCTURAL12/27/2001 1/4/2002 PASS
H-PILE SHORING ALONG 8TH STREET. 12/27/2001-Sent resubmittals from CSHQA/Strata to outside engineering for review. 1/3/2002-Received confirmation from outside engineer that shoring is approved. Notified Jim Otradosky at CSHQA that resubmittal is approved. Called contractor to pick up approved plans. Did not charge any additional fees. (MSouthard)
BLD-Concrete12/27/200112/31/200112/31/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/27/2001 at 13:34:50. Contact: . rec'd mti reports, need cores sampled/tested as req'd; caisson ok pend reports & eng's ok as previously asked. 12/31/2001 2:01:19 PM
BLD-Concrete12/27/200112/31/200112/31/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/27/2001 at 13:34:50. Contact: . rec'd mti reports, need cores as spec'd for caisson E-6? pend report for caisson in progress. 12/31/2001 12:28:09 PM
BLD-Conference12/28/200112/30/200112/31/2001APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 2:32:13 PM caissons...w/ Dave Cram re soils report methods...eng'r to approve. 12/31/2001 8:59:44 AM
BLD-Concrete12/27/200112/28/200112/28/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/27/2001 at 13:35:30. Contact: .N.W. caisson, pend spec insp reports & eng's ok 12/28/2001 2:31:40 PM
BLD-Concrete12/19/200112/21/200112/21/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/19/2001 at 07:20:07. Contact: .work stopped due to equip. failure; met w/ Chuck Rausch & Alan Gammel, req'd design eng'r to review soils test methodology...KSF #'s for caisson end bearing must be generated br MTI 12/21/2001 7:05:40 PM
BLD-Conference12/21/200112/21/200112/21/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/21/2001 11:45:03 AM w/ Dave Cram of MTI...need eng's (d'Amato & Conversano) ok for soils methodology; verify actual brg pressures encountered vs. req'd.
BLD-Concrete12/19/200112/20/200112/20/2001ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/19/2001 at 07:19:18. Contact: .
BLD-Concrete12/19/200112/19/200112/19/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/19/2001 at 07:18:34. Contact: . caisson, pend geo tech & conc reports 12/19/2001 12:15:03 PM
BLD-Foundation12/17/200112/18/200112/18/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/17/2001 at 09:58:35. Contact: .caisson ...pend geo-tech report 12/18/2001 12:14:02 PM
BLD-Foundation12/17/200112/17/200112/17/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/17/2001 at 09:57:44. Contact: .caissons pending report; rec'd initial MTI conc. report...exceeds 5100psi at 7 days, 4000 psi req'd 12/17/2001 5:35:41 PM
BLD-Footing12/13/200112/14/200112/14/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/13/2001 at 12:13:41. Contact: ###-####.
BLD-Foundation12/13/200112/13/200112/13/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/13/2001 5:28:47 PM caisson grid line 4...pend mti reports
BLD-Conference12/13/200112/13/200112/13/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/13/2001 9:38:28 AM meet new supt. Alan Gammel ...jobsite safety, etc 12/14/2001 8:54:20 AM 12/14/2001 8:55:12 AM
BLD-Conference12/12/200112/12/200112/12/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/12/2001 2:35:28 PM w/ Alan Gammel; new proj. supt. re insp. policy and spec insp req's...logs to be onsite.
Routing Off Site - STRUCTURAL12/5/2001 12/12/2001 FAIL
12/5/01- PLAN RESUBMITTALS for H-pile shoring along 8th Street sent to outside engineering for review. 12/12/01- Plan review received from outside engineer - Not Approved. Faxed a copy of review to Jim Otradosky at CSHQA.
BLD-Foundation12/11/200112/11/200112/11/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/11/2001 12:02:41 PM observed 12th (of 30) caisson pour...met w/ Chris Schiappa & Mike Spiker of MTI onsite....Mike recommends coring caissons at SW corner for add'l test; Chris states soil bearing numbers are ok...there is a clay layer that will impact mat bearing, contractor has been informed. Contractor is using pump/tremmie to displace ground water. Eng'r to address soil depth/ protection of Eastman garage ftgs...grade beam is partially exposed
BLD-Conference12/10/200112/10/200112/10/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/10/2001 5:52:04 PM w/ Jim Rogers re MTI soils report
BLD-Foundation12/7/200112/7/200112/7/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/07/2001 at 07:28:35. Contact: ###-####.
BLD-Conference12/7/200112/7/200112/7/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 12/7/2001 5:06:18 PM w/ Jim Rogers re soils testing methodology.
BLD-Foundation12/6/200112/6/200112/6/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/6/2001 12:02:36 PM Observed poured caissons at west ext wall line, MTI onsite, pending all reports, including geo-tech
Plan resubmittals received  12/4/2001  
PLAN RESUBMITTALS AFTER PERMIT ISSUANCE. Received engineered plans by Dan Gado (Strata) submitted by CSHQA (Architect of Record) for the H-pile shoring along 8th street. Routed to outside engineering for review. (msouthard)
BLD-Concrete11/30/200111/30/200111/30/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/30/2001 at 05:47:38. Contact: ###-####. initial caisson at SW corner...rec'd geo report regarding req'd depth for brg...met w/ Mti insp Mike Spiker & geolgist at site...observed boring and placement of slip form, rebar cage made onsite to be lowered into partial filled caisson. 4000psi conc req'd...(pending report) need remainder blow tests as req'd 11/30/2001 1:42:58 PM 11/30/2001 1:43:05 PM 11/30/2001 1:43:30 PM
BLD-Conference11/29/200111/29/200111/29/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/29/2001 5:08:11 PM w/ Marlene, John & GS...need exact reports/plans for piles-foundations or stop work until resubmittals rec'd/approved.
BLD-Grading Inspection11/13/200111/14/200111/14/2001ANR
DetailsRita DeYoung
Scheduled by a contractor via Hello! on 11/13/2001 at 16:57:38. Contact: ###-####. bldr needs to consult plan chk re other plans , grading permit, other trade permits/plans. 11/14/2001 2:29:45 PM
BLD-Conference11/13/200111/14/200111/14/2001PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 11/13/2001 6:11:45 PM ###-#### By george! 11/14/2001 2:27:02 PM
BLD-Grading Inspection11/11/200111/12/200111/12/2001ACANC
DetailsRita DeYoung
Scheduled by a contractor via Hello! on 11/11/2001 at 10:23:28. Contact: ###-####.
BLD-Conference9/12/20019/12/20019/12/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/12/2001 3:51:50 PM w/ supt re insp process...still need all other hvac, elec, plbg, & finish plans
BLD-Conference9/11/20019/11/20019/11/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/11/2001 4:39:17 PM w/ Mike Z...awaiting add'l temp exit info.
BLD-Conference9/5/20019/5/20019/5/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/5/2001 8:33:32 AM elec/util relocation work in progress; need consult w/ supt re exits...which path chosen as not apparent onsite
BLD-Conference8/9/20018/9/20018/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/9/2001 8:19:22 AM w/Mike, supt. for Mortensen re temp exit proposal.
BLD-Conference8/2/20018/2/20018/2/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 8/2/2001 4:07:40 PM c/n: maintain exits from existing bldg & provide pedestrian protection as needed (canopies,boardwalk, or exit passageways)...again, submit utility & hvac plans; some site work being performed... and elec power being brought in by Id. Power. Site fenced.
BLD-Conference7/13/20017/13/20017/13/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 7/13/2001 8:45:45 AM rec'd letter from Chuck Rauch, Mortenson proj mgr re c/n of 6-01; plans are to be forthcoming thru CHSQA; also rec'd MTI letter of scope for spec. insp.
(F) Reprint permit  7/5/2001 DONE
BLD-Conference6/25/20016/25/20016/25/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/25/2001 2:49:35 PM w/ Mortenson const. supt Zangara (?) re necessity of add'l plbg, hvac, & other plans
Plan Reviewer's activity  6/14/2001 DONE
Received Arch. of record change on 6/14/2001. John Maulin of CSHQA designated. KMM
BLD-Footing6/13/20016/13/20016/13/2001 FAIL
DetailsCarl Dependahl
c/n issued 6/13/2001 4:50:51 PM
CHANGE STATUS TO (ISS)  6/13/2001 DONE
per George
BLD-Conference5/17/20015/17/20015/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/17/2001 8:59:20 AM mtg w/ developer & PDS; need add'l plans for infrastructure & bldg sprinkler connections/system.
Routing - PLAN CHECK5/1/2000 5/3/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/3/2000 PASS
Inspection Record Card- Bld  5/3/2000 DONE
Print Occupancy Form  5/3/2000 DONE
Issue PAID IN FULL permit  5/3/2000 DONE
Plan assigned to (JCM)11/30/1998 5/3/2000 PASS
DetailsJohn Menard
5/3/00 11:25:50 JCM - activity updated through activity BLDA022 from case BLD98-03705.
Routing - PLUMBING4/24/2000 5/1/2000 DONE
MISC ACTIONS  4/27/2000 DONE
Tim heard that the value was 36,000,000.00 not 18,000,000.00 I was told to raise value to the 36,000,000.00. the fees were different than what Tim worked up, I added the fees that Tim H. had per Tim H. lh
Routing - PLAN CHECK3/23/2000 4/24/2000 PEND
Routing - PUBLIC WORKS3/22/2000 3/23/2000 DONE
Routing - PLAN CHECK1/19/2000 3/22/2000 PEND
Routing - PLANNING1/19/20001/19/20001/19/2000 PASS
Approved per DRH98-71, DRH98-132, DRH98-217, and revised plans in the Design Review files.
Plan Reviewer's activity  1/19/2000 FAIL
REVIEWED LEGAL AGREEMENTS BETWEEN THE TOWER AND ADJOINING BUILDINGS. AFTER REVIEW, I ATTACHED MY COMMENTS AND FORWARDED THE PACKAGE TO MARLENE SOUTHARD.
Routing - PUBLIC WORKS12/22/1999 12/23/1999 FAIL
REQUIRES DRAINAGE PLAN REVISIONS. 12/23/99 DAR
Additional plans submitted  12/22/1999 DONE
RECEIVED ADDITIONAL COLOR MATERIAL KEY LISTS FROM THE ARCHITECT THROUGH THE GENERAL CONTRACTOR,FORWARDED SAME TO JOHN MENARD. 12/22/99 DAR
Routing - PLAN CHECK7/12/1999 12/22/1999 PEND
FORWARDED TO PUBLIC WORKS AT THEIR REQUEST. 12/22/99 DAR
Routing - PLANNING7/12/1999 7/12/1999 PEND
Plans do not comply with the approved Design Review documents. Contacted Norm Peterson with Boise Tower LLC and informed him of the defeciencies; also sent him a letter outlining the items (copy of letter sent to Rick Peterson, Ed Peterson, Don Belts and Brian Jorgenson).
Routing - PLANNING7/8/1999 7/9/1999 PEND
Approved pending Design Review approval.
Routing - PLAN CHECK6/18/1999 7/8/1999 PEND
Plan Reviewer's activity  6/25/1999 PEND
REVIEWED RESUBMITTALS WAITING FOR SUBMITTAL OF ALL REQUESTED INFORMATION.
Plan resubmittals received  6/16/1999 PASS
Received cover sheet and comment sheets for the boise tower (shell and core) Received cover sheet A2.1,A3.1.1 2 sets forward to John M. mps
Plan resubmittals received  6/15/1999 PASS
Received resubmittals for Boise Tower 30 x42 Vellum Reproducible drawing sheets mpf2., mpf2.2,mpf2.3, mpf2.4, mpf2.5, mpf2.6, mpf2.7 all sheets indicated as rev #1, city prc-Routed to john m.
Routing - FIRE6/2/1999 6/14/1999 PASS
FED EXED OFFICE COPY TO FLOYD. PUT ISSUE COPY WITH BILL TO HOLD. KMM 6-15-99 FLOYD FAXED BACK RESPONSE. HE PASSED WITH CONDITIONS. I FAXED TO THE ARCH. AND GAVE BILL A. A HARD COPY THE PLANS SHOULD BE COMING BACK TO ME SOON. KMM 6-17-99 RECEIVED PLANS BACK FROM FLOYD, AND ROUTED BACK TO BILL. KMM
Routing - PLAN CHECK1/27/1999 6/2/1999 PEND
Plan resubmittals requested  6/1/1999 FAIL
MAILED ED PETERSON A COPY OF THE COMMENT LIST REQUESTING ADDITIONAL RESUBMITTALS.
Telephone Call  5/4/1999
SPOKE WITH NORM PETERSON ABOUT THE TWO SETS OF PLANS HE SUBMITTED CONCERNING MECH. PLUMB. AND FIRE PROTECTION SCHEDULES. THESE ARE SCHEMATIC IN NATURE ONLY. I DATE STAMPED THEM AND ROUTED TO JOHN M.
Plan resubmittals received  4/26/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM ED PETERSON, EHRLICH - ROMININGER, FORWARDED SAME TO JOHN MENARD. DAR 3/23/99
Routing Off Site - STRUCTURAL3/22/1999 3/23/1999 PASS
SENT RESUBS TO CONSULTING STRUCTURAL ENGINEER. DAR 3/22/99
Plan resubmittals received  3/22/1999
Plan resubmittals received  3/19/1999 PEND
RECEIVED RESUBMITTALS FROM DCI ENGINEERS VIA NORM PETERSON, TOWER ASSOCIATION, FORWARDED SAME TO JOHN MENARD. DAR 3/19/99
Routing Off Site - STRUCTURAL3/1/1999 3/15/1999 FAIL
SENT RESUBMITTALS TO STRUCTUAL ENGINEER CONSULTANT VIA PDQ
Plan resubmittals received  2/24/1999 PEND
RECEIVED ADDITIONAL STRUCTUAL CACULATIONS FROM NORM PETERSON, OF BOISE TOWER ASSOCIATES, FORWARDED SAME TO JOHN MENARD. DAR 2/24/99
Routing Off Site - STRUCTURAL2/8/1999 2/17/1999 FAIL
Plan resubmittals requested  2/17/1999 PEND
FAXED ED PETERSON A COPY OF THE CONSULTING ENGINEER'S COMMENT LIST REQUESTING ADDITIONAL INFORMATION ON THE RESUBMITTED STRUCTURAL PLANS AND CALCULATIONS.
Plan resubmittals received  2/5/1999
FIRST REVISED COPIES RECEIVED ON 2-2-99. HOWEVER PLANS WERE NOT STAMPED OR SIGNED. 2-5-99 RECEIVED THREE COPIES OF REVISED STAMPED AND SIGNED SHEETS S1.0,S2.0, S2.3, S2.3A, S2.4, S2.5, S2.6, S2.7, S2.7A, S2.26, S3.0, S3.1, S3.2, S3.10, S3.11, S3.20, S3.30, S3.40, S3.50, S3.60, S4.1, S5.1, S5.3. THREE COPIES OF ADDITIONAL STRUC. CALCS. AND ONE CPOPY OF RESPONSE LETTER. ROUTED TO JOHN M. KMM
Telephone Call  2/2/1999
PUT A CALL INTO NORM PETERSON. THE RESUBMITTED PLANS HE BROUGHT IN WERE NOT STAMPED OR SIGNED. HE CAME IN ON 2-03-99 AND PICKED UP PLANS TO GET THEM TAKEN CARE OF. KMM
Routing - FIRE1/21/1999 1/26/1999 FAIL
incomplete
Plan Review Completed(1st rev)  1/26/1999 FAIL
all fail
Routing - PLAN CHECK12/17/1998 1/21/1999 PEND
Plan resubmittals requested  1/21/1999 PEND
MAILED ED PETERSON AT EHRLICH-ROMINGER A COPY OF THE PRELIMINARY COMMET LIST REQUESTING REVISIONS.
Plan resubmittals requested  1/4/1999 PEND
Received stuctural review comments from the consulting engineer on December 29th and forwarded those comments to Ed Peterson at Ehrlich-Rominger for required revisions.
Routing Off Site - STRUCTURAL12/1/1998 12/31/1998 FAIL
CONTACTED PDQ TO TAKE PLANS OUT TO CH2MHILL. 12-31-98 ROUTED RESPONSE TO JOHN M.
Routing - PLUMBING12/11/1998 12/17/1998 FAIL
Routing - PLANNING12/10/1998 12/11/1998 PEND
Pending CCDC Design Review approval (modification of approved 24 story design to add a floor, to change parking and exterior finishes). The CCDC Board will hear the application at the December 14, 1998 meeting, then a 10 day appeal period must lapse.
Routing - PUBLIC WORKS12/1/1998 12/10/1998 FAIL
REQUIRES DRAINAGE PLAN APPROVAL ACHD PER BM. ALSO FAILED BY KENT JOHNSON.
Plans ACCEPTED BY PLAN TECH  12/1/1998 PASS
12-01-98 REQUIRES SITE PLAN CONTACTED ED PETERSON OF THIS NEED. I SPOKE WITH JOHN. HE STATED HE WILL DECIDE IF SITE PLAN SHEET A1 IS NEEDED WHEN HE LOOKS AT PLANS. CIVIL SHEET MAY BE ENOUGH. KMM
Plan routing begun/NEW & ADDTN  12/1/1998 PASS
Application received  11/27/1998 PEND
11-30-98 WILL BE FAXING OVER RECORD DECLARATION FORM.
Received Certificate of Value  11/27/1998 PASS
Recd Pcfee & Taken To Pln CK  11/27/1998
Fee Review-notes2/26/1999  
Freeze Case