Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-03707
StatusFinaled
Name STARGATE INVESTMENTS
Site Address 3676 N HARBOR LN
Project NameSTARGATE INVESTMENTS
Customer Number 
ePlanReviewNo
Description
STARGATE INVESTMENTS OFFICE BUILDING * TO CONSTRUCT A ONE STORY wood frame 4,953 SQ. FT. OFFICE BUILDING. This building contains 3 tenant spaces. The center space is to be finished, the other spaces (suite 1 & 3) will require additional permit and inspection before occupancy. PC#810-98 DRH98-0235 ads
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/18/2004  
Fee Review-notes3/15/20003/15/20003/15/2000 DONE
BLD-Final9/23/19999/24/19999/24/1999PPASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 09/23/1999 at 09:56:17. Contact: ###-####.
FIRE-Final Inspection9/23/19999/24/19999/24/1999APASS
DetailsJoe Tawney
Dennis, ###-#### - final reinspection OK for perm occ. & letter of completion
Permanent occupancy  9/24/1999 DONE
Perm. Occ. Cert. #7916 issued 9-24-99 to Stargate Investments.
FIRE-Final Inspection9/22/19999/23/19999/23/1999AFAIL
DetailsJoe Tawney
DENNIS-- CELL ###-#### FN FIRE Bldg address door closer
Permanent Occupancy 9/23/19999/23/1999 DONE
Details
Permanent occupancy UNPAID FEE  9/23/1999 JWS
FIRE-Final Inspection9/21/19999/21/19999/21/1999PFAIL
DetailsJoe Tawney
Dennis, ###-#### or ###-#### plan review notes not on site
BLD-Final9/16/19999/17/19999/17/1999AFAIL
DetailsWes Worcester
NOT READY
BLD-Final9/15/19999/16/19999/16/1999AFAIL
DetailsWes Worcester
NEED OTHER SIGNATURES
Plan resubmittals received  8/13/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM MARK SANDERS, FORWARDED SAME TO WES WORCESTER, 8/13/99 DAR
INSP - Framing/Rough-in7/26/19997/26/19997/26/1999PPASS
DetailsWes Worcester
07/26/99 342 - Scheduled by Hello!. Contact phone is [8701717]. 2PM APT
INSP - Framing/Rough-in7/22/19997/22/19997/22/1999PFAIL
DetailsWes Worcester
07/23/99 342 - Scheduled by Hello!. phone is [8701717]. NEED ENGINEERI
INSP - Framing/Rough-in7/21/19997/21/19997/21/1999PFAIL
DetailsWes Worcester
07/21/99 342 - ###-#### shear incorrect, truss eng not done, draft stop
INSP - Framing/Rough-in7/14/19997/14/19997/14/1999PFAIL
DetailsWes Worcester
NEED MECHANICAL INSPECTION. Contact phone is [8701717].
INSP - Foundation6/10/19996/10/19996/10/1999PPASS
DetailsWes Worcester
06/10/99 342 - after 1pm Dane ###-####
INSP - Foundation6/8/19996/9/19996/9/1999APART
DetailsWes Worcester
06/08/99 342 - ###-#### DANE/ architect to address transom rebar not on
(F) Reprint permit  5/24/1999
Issue PAID IN FULL permit  5/21/1999
Plan assigned to (ADS)11/30/1998 3/30/1999 PASS
Details
Record of suvey recorded on 3/29/99 so permit can be issued.
Plan Reviewer's activity  3/30/1999
THE RECORD OF SURVEY 4573 WAS RECORDED ON 3/29/99 SO THE PERMIT CAN BE ISSUED.
Telephone call  3/30/1999
called talked to mark sanders/achd needed told mark
PLANS/APPL TAKEN TO FRONT DESK  3/30/1999 PASS
Inspection Record Card- Bld  3/30/1999
Print Occupancy Form  3/30/1999
Routing - PLAN CHECK2/10/1999 3/30/1999 PASS
Routing - PUBLIC WORKS2/9/1999 2/10/1999 PASS
Routing - PLAN CHECK2/4/1999 2/9/1999 PENA
Routing - PUBLIC WORKS1/29/1999 2/4/1999 FAIL
REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. DAR 2/4/99
Routing - PLAN CHECK1/19/1999 1/29/1999
need reduction in density to combine lots. Building Code review approved.
Routing - PLANNING1/15/1999 1/15/1999 PASS
approved per DRH98-0235 and revised landscape plan dated approved 1/14/99.
Routing - FIRE1/13/1998 1/14/1999 PASS
Plan resubmittals received  1/14/1999
RECEIVED THREE COPIES OF REVISED SHEETS A2.0, A2.1, A2.2, A2.4, A4.1, A10.0 ROUTED TO ARLAN. KMM
Plan Review Completed(1st rev)  1/14/1999 FAIL
fail UBC, planning, PW
Routing - PLAN CHECK1/12/1999 1/13/1999 FAIL
Plan resubmittals requested  1/13/1999 FAIL
notice faxed & mailed to architect
Routing - PLANNING1/11/1998 1/12/1999 FAIL
Revised plans indicating compliance with Community Forestry must be submitted to Staff for review and approval, per condition #1b of DRH98-0235.
Routing - PLUMBING1/8/1999 1/11/1999 PASS
Routing - PLAN CHECK12/10/1998 1/8/1999
PUT IN DAVE AND MY HOLD BIN UNTIL LAST WK IN DEC. DUE TO PEND. STATUS ON DR. AND PW'S PROBLEM. 12-28-98 DR#SILL PEND.
Routing - PUBLIC WORKS12/10/1998 12/10/1998 FAIL
REQUIRES DRAINAGE PLAN. PER BRIAN MURPHY WHO SPOKE TO MARK SANDERS ABOUT THIS NEED. WILL PUT PLANS IN OUR BIN TO HOLD UNTIL THE LAST WEEK IN DEC. DUE TO DR WAS JUST PUT IN FOR ON THE 9TH OF DECEMBER. KMM 12-28-98 DR# STILL PEND. 01-11-99 DR APPROVED ROUTED PLANS TO PLUMB. THEN ARLAN.
Plans ACCEPTED BY PLAN TECH  12/10/1998 PASS
Routing Off Site - STRUCTURAL12/10/1998 12/10/1998
ENG. WILL BE DONE INHOUSE.
Application received  12/9/1998 PASS
RECEIVED DR # DRH98-0235
Plan assigned to (MYS)11/27/1998 12/1/1998
DetailsMarlene Southard
Received Certificate of Value  12/1/1998 PASS
Plans ACCEPTED BY PLAN TECH  12/1/1998 FAIL
CONTACTED MARK SANDERS TO LET HIM KNOW WE DO NOT ACCEPT PLANS STAMPED PRELIMINARY NOT FOR CONSTRUCTION. HE WILL COME IN AND CROSS OUT AND INITIAL. KMM 12-09-98 CALLED MARK TO LET HIM KNOW AS SOON AS I RECEIVE DIFF. PLANS NOT STAMPED NOT FOR CONSTRUCTION I CAN START ROUTING. KMM 12-09-98 MARK SANDERS CAME IN THE PM AND TOOK PLANS WITH HIM TO HAVE DOUG CROSS OUT NOT FOR CONSTRUCTION AND INITIAL. PLANS RETURNED BY AFTERNOON. KMM
Plan routing begun/NEW & ADDTN  12/1/1998 PEND
SEE ACTION A 006 DATED 12-01-98 12-10-98 SEE A216 12-28-98 DR# STILL PEND. 01-11-99 Dr issued. REQUIRES DENSITY REDUCTION SURVEY PER MARLENE.
Application received  11/27/1998 PEND
12-01-98 REQUIRES DESIGN REVIEW. TEMPRA CONTACTED MARK SANDERS OF THIS NEED. I SPOKE WITH MARK TO LET HIM KNOW THAT ROUTING WILL NOT BEGIN UNTIL HE RECEIVES HIS DR#.AND WITHIN HIS 10 DAY APPEAL PERIOD. KMM
Recd Pcfee & Taken To Pln CK  11/27/1998