Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-03727
StatusFinaled
Name MENYHARTH BUILDING
Site Address 1101 W GROVE ST
Project NameMENYHARTH BLDG
Customer Number 
ePlanReviewNo
Description
MENYHARTH COMMERCIAL BUILDING CONDITIONAL PERMIT * TO CONSTRUCT A NEW TWO STORY 9,268 SQ. FT. TYPE VN OFFICE\RETAIL SHELL ONLY BUILDING WITH FINISHES, MECHANCIAL, PLUMBING AND ELECTRICAL PER APPROVED PLANS. DRH98-0199 PC#821-98 NOTE: THE ATTACHED CONDITION MUST BE FULLY APPROVED PRIOR TO FRAMING INSPECTION. THIS PERMIT IS FOR A SHELL BUIDLING ONLY WITH NO OCCUPANCY. SEPARATE PERMITS ARE REQUIRED FOR COMPLETETION AND OCCUPANCY FOR EACH TENANT SPACE. 4517 SQ. FT. FIRST FLOOR 4751 SQ. FT. SECOND FLOOR.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference10/3/200210/4/200210/4/2002APASS
DetailsCarl Dependahl
done deal 10/4/2002 2:56:43 PM
DOC - Permit Finaled  10/4/2002 DONE
BLD-Final10/3/200210/3/200210/3/2002PNR
DetailsCarl Dependahl
here is the other part--it has a final but not doc final...unable to verify 10/3/2002 8:23:53 PM
Case Summary (BLD)  10/2/2002  
Receive PAYMENT IN FULL  1/13/2000 DONE
(F) Reprint permit  1/10/2000 DONE
Routing Off Site - STRUCTURAL2/2/1999 12/12/1999 FAIL
CONTACTED PDQ TO TAKE REVISED PLANS TO OUTSIDE ENG. KMM
Fee Review-notes3/19/1999 11/23/1999 DONE
CERT OF VALUE 360,000.00 LH
(F) Reprint permit  11/23/1999 DONE
Letter of compliance  11/9/1999 DONE
Letter of Compliance #18175 issued 11-9-99.
BLD-Final10/27/199910/27/199910/27/1999PPASS
Details
Menyharth shell bldg. Signed perm col. Occ. Req. card ok for L/C
BLD-Framing/Rough-in10/19/199910/20/199910/20/1999AFAIL
Details
menyharth---###-#### --- Need P/Z signoff handrail corrections.
FIRE-Final Inspection9/27/19999/27/19999/27/1999PPASS
DetailsRick Jackson
KEITH ###-#### Occupancy approved
FIRE-Final Inspection9/24/19999/24/19999/24/1999PNR
DetailsRick Jackson
Keith ###-#### Not ready
FIRE-Final Inspection9/22/19999/23/19999/23/1999AFAIL
DetailsRick Jackson
KEITH-- ###-#### FN FIRE Elevator Recall system needs test; elevator lobby door not installed
Code Occupancy Approval  8/5/1999 FAIL
Fail - Does not comply - Bike rack not in, lighting and steel verticles NOT ACCEPTABLE.
Office Staff conference/action  7/30/1999 PASS
cathy has card with her no temp was issued on shell.
Code Occupancy Approval  7/30/1999
Final Occupancy requested by: Paul Menyharth ###-####
DOC - T/O Approved7/27/19997/27/19997/27/1999 PART
Details
/ / 338 - SIGNED THE TEMP COL OF THE OCC REQ CARD FOR THE SHELL ONLY
SUPER- Supervisor's review7/20/19997/20/19997/20/1999
corrections include sheetrock on stairs and cover visqueen on walls not approved
INSP-Final Inspection7/16/19997/19/19997/19/1999AFAIL
DetailsRick Jackson
KEITH ###-#### LIFE SAFETY mechanical resubmittal needed; address; stair completed
INSP - Final7/16/19997/19/19997/19/1999PFAIL
Details
07/19/99 338 - need other agencies signoffs c/n issued address, flame sp
Code Occupancy Approval  7/16/1999 FAIL
Bonded for remaining - stripping, landscaping and steel piping (vertical) on structure.
Code Occupancy Approval  7/15/1999
Temporary occupancy requested by Keith Fickard ###-####
INSP - Framing/Rough-in6/18/19996/18/19996/18/1999P
DetailsJim Storey
framing
INSP - Framing/Rough-in6/8/19996/9/19996/9/1999PPART
DetailsJim Storey
06/09/99 301 - truss repair ok
INSP - Framing/Rough-in6/7/19996/8/19996/8/1999ANR
DetailsJim Storey
06/08/99 301 - roof framing Keith ###-####
INSP - Framing/Rough-in6/8/19996/8/19996/8/1999PCANC
DetailsJim Storey
06/08/99 301 - Keith ###-####
INSP-Conference6/7/19996/7/19996/7/1999PPASS
Details
INSP - Foundation4/9/19994/9/19994/9/1999PPART
Details
made ok with sp insp approvals r-bar is placed
INSP - Foundation4/7/19994/7/19994/7/1999 PART
Details
04/07/99 338 - made ok with sp insp for the s.w. corner to install power
INSP - Foundation4/5/19994/5/19994/5/1999PPART
Details
04/05/99 338 - made ok for pour with sp insp approval
INSP - Foundation4/1/19994/2/19994/2/1999PCANC
Details
04/02/99 338 - cancelled by the conc ctr. not per approved plans
INSP - Foundation3/29/19993/30/19993/30/1999PCANC
Details
03/30/99 338 - ###-#### KEITH//FOOTING//LATE PM cancelled by the cont pe
(F) Reprint permit  3/24/1999
Issue PAID IN FULL permit  3/23/1999
Print Occupancy Form  3/22/1999
Inspection Record Card- Bld  3/22/1999
Telephone call  3/22/1999
TALKEDT TO PAUL WILL FED X CHECKS
Plan assigned to (MLO)12/3/1998 3/19/1999 PASS
DetailsMike Otto
Routing - FIRE3/19/1999 3/19/1999 PASS
Shell only LAN SMITH APPROVED HYDRANDT LOCATIONS
PLANS/APPL TAKEN TO FRONT DESK  3/19/1999 PASS
APPROVED PER CONDITION, ATTACHMENTS AND AS NOTED MLO
Plan Review Completed(1st rev)  3/19/1999 PASS
Routing - PLAN CHECK3/17/1999 3/19/1999 PASS
Plan resubmittals received  3/17/1999 PEND
Plan resubmittals requested  3/12/1999 FAIL
CORRECTIONS SENT TO ARCHITECT. MLO
Routing - PLAN CHECK2/16/1999 3/12/1999 FAIL
Plan resubmittals received  3/11/1999 PEND
Plan resubmittals received  3/4/1999 PEND
RECEIVED RESUBMITTALS FROM PATRICK McKEEGAN ARCHITECTS, FORWARDED SAME TO MIKE OTTO. DAR 3/4/99
Routing Off Site - STRUCTURAL2/24/1999 2/26/1999 PASS
STRUCTURAL RESUBMITTALS SENT TO STRUCTURAL ENGINEER CONSULTANT. 2-26-99 received one copy ofthe response letter from atwood. One copy of designer responses. Structural calculations, and plans. routed to mike o. kmm
Plan resubmittals received  2/23/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM PATRICK McKEEGAN, ARCHITECH, FORWARDED SAME TO MIKE OTTO. DAR 2/24/99
Routing - PLANNING2/3/1999 2/16/1999 PASS
X-REF. DRH99-0014 (MODIFICATION TO DRH98-0199)
Plan resubmittals requested  2/12/1999 FAIL
COMMENTS FORM CONSUTLING ENGINEER FAXED TO ARCHITECT. MLO
Routing - PUBLIC WORKS2/1/1999 2/3/1999 PASS
Plan resubmittals received  2/2/1999 PEND
RECEIVED ONE COPY OF ORIGINAL VELLUMS OF THE STRUCTURAL DRAWINGS AND ONE COPY OF STRUCTURAL CALCULATIONS. ROUTED TO MIKE O. KMM ALSO RECEIVED APPLICATION WITH TWO COPIES OF PLANS FOR T.I. WILL SPEAK TO MIKE O ON HOW TO PROCEED WITH T.I. KMM
Plan resubmittals requested  2/1/1999 PEND
RESUBMITTALS SHORT SET OF PLANS FOR STRUCTURAL CHECK, APPLICATION FOR TI WITH CERTIFICATE OF VALUE NOT INCLUDED. ARCHITECT SENT FAX. MLO
Plan resubmittals received  1/29/1999 PEND
received two copies of revised plans and revised engineering calculations. I did not receive a new cert. of value for the T.I. portion for the liquor store. routed to Mike O. kmm
Routing - PLUMBING1/15/1999 1/15/1999 PASS
PLANS SENT TO PLUMBING FOR GRAIDING APPROVAL ONLY AT THIS TIME. KMM
Routing - FIRE1/13/1999 1/13/1999 PASS
1-13-99 SENT TO FIRE FOR GRADING ONLY AT THIS TIME. GRADING APPROVED ON CONDITION THAT THE SITE IS SERVED BY AN EXISTING HYDRANT TO BE NOTED ON THE PLANS FOR APPROVAL OF THE CONSTRUCTION PERMIT. PER FLOYD VARLEY. KMM
Routing - PLAN CHECK12/21/1998 1/13/1999 PEND
NEED NEW APPLICATION AND PLANS FOR CHANGING SCOPE OF WORK TO INCLUDE FINISHED SPACE.
Plan resubmittals requested  1/13/1999 PEND
ARCHITECT TO SUBMIT ADDITIONAL PLANS FOR CHANGE FROM SHELL TO PARTIAL OCCUPIED STRUCTURE. MLO
Plan Reviewer's activity  1/13/1999 PEND
ARCHITECT HAS NOTIFIED PDS THAT SCOPE OF WORK FOR PROJECT WILL NOW INCLUDE A FINSIHED SPACE ON THE FIRST FLOOR. REVSIED PLANS TO BE PROVIDED PRIOR TO REVIEW. ARCHITECT NOTIFIED THAT ELEVATOR REQUIRED AND EXITS ON 2ND FLOOR TO CLOSE TOGETHER. MLO
Routing - PLUMBING12/11/1998 12/21/1998 FAIL
AWAITING PLUMBING PLANS.
Routing Off Site - STRUCTURAL12/3/1998 12/18/1998 FAIL
CONTACTED PDQ TO TAKE PLANS OUT TO ENG.
Plan resubmittals requested  12/18/1998 FAIL
STRUCTRUAL CORRECTIONS FAXED TO ARCHITECT. MLO
Plan resubmittals received  12/18/1998 PEND
RECEIVED TWO COPIES OF SHEETS M-1, M-2, P-1, E-1, E-2, E-3 ROUTED TO MIKE O.
Routing - PLANNING12/9/1998 12/11/1998 PASS
x-ref. drh98-0199.
Routing - PUBLIC WORKS12/3/1998 12/9/1998 FAIL
REQUIRES STREET LIGHTING PLAN. PER BILL COLSON. 12/09/98 DAR
Plan routing begun/NEW & ADDTN12/3/1998 12/3/1998 PASS
Plan assigned to (MYS)11/30/1998 12/3/1998
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  12/3/1998 PASS
11-30-98 PAT NEEDS TO COME IN AND CROSS OUT RESTROOM ON FIRST FLOOR. NOT DOING T.I. FOR LIQUOR STORE AT THIS TIME. REQUIRES THREE COPIES OF CIVIL SHEETS. CONTACTED PAT MCKEEGAN OF THIS NEED. KMM PAT ALSO WAS INTERESTED IN A DEMO AND GRADING PERMITS. I TOLD HIM ABOUT NEW CERTS. OF VALUES AND REVISED CERT. FOR THE BUILDING. KMM 12-03-98 RECEIVED CIVIL SHEETS, REVISED CERTS. AND TOOK CARE OF RESTROOM. KMM
Received Certificate of Value  12/3/1998 PASS
11-30-98 WILL NEED TO BE REVISED DUE TO DEMO AND GRADING PERMITS PAT WANTS TO PULL. KMM 12-03-98 RECEIVED CERT. OF VALUES. PUT WITH PLANS AND MIKE O. KMM
Recd Pcfee & Taken To Pln CK  11/30/1998
Application received  11/30/1998 PASS
INSP - Framing/Rough-in6/17/19996/18/19996/11/1989PFAIL
DetailsJim Storey
06/18/99 301 - trans to ppaine
Case Summary (BLD)     
Routing - PLANNING3/18/1999  
REVISIONS REQUIRE PLANNING APPROVAL.MLO