BLD-Conference | 10/3/2002 | 10/4/2002 | 10/4/2002 | A | PASS |
Carl Dependahl
|
|
|
done deal 10/4/2002 2:56:43 PM
|
DOC - Permit Finaled | | | 10/4/2002 | | DONE |
|
|
|
|
BLD-Final | 10/3/2002 | 10/3/2002 | 10/3/2002 | P | NR |
Carl Dependahl
|
|
|
here is the other part--it has a final but not doc final...unable to verify 10/3/2002 8:23:53 PM
|
Case Summary (BLD) | | | 10/2/2002 | | |
|
|
|
|
Receive PAYMENT IN FULL | | | 1/13/2000 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/10/2000 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/2/1999 | | 12/12/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE REVISED PLANS TO OUTSIDE ENG. KMM
|
Fee Review-notes | 3/19/1999 | | 11/23/1999 | | DONE |
|
|
|
CERT OF VALUE 360,000.00 LH
|
(F) Reprint permit | | | 11/23/1999 | | DONE |
|
|
|
|
Letter of compliance | | | 11/9/1999 | | DONE |
|
|
|
Letter of Compliance #18175 issued 11-9-99.
|
BLD-Final | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | PASS |
|
|
|
Menyharth shell bldg. Signed perm col. Occ. Req. card ok for L/C
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
|
|
|
menyharth---###-#### --- Need P/Z signoff handrail corrections.
|
FIRE-Final Inspection | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | PASS |
Rick Jackson
|
|
|
KEITH ###-#### Occupancy approved
|
FIRE-Final Inspection | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | NR |
Rick Jackson
|
|
|
Keith ###-#### Not ready
|
FIRE-Final Inspection | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | FAIL |
Rick Jackson
|
|
|
KEITH-- ###-#### FN FIRE Elevator Recall system needs test; elevator lobby door not installed
|
Code Occupancy Approval | | | 8/5/1999 | | FAIL |
|
|
|
Fail - Does not comply - Bike rack not in, lighting and steel verticles NOT ACCEPTABLE.
|
Office Staff conference/action | | | 7/30/1999 | | PASS |
|
|
|
cathy has card with her no temp was issued on shell.
|
Code Occupancy Approval | | | 7/30/1999 | | |
|
|
|
Final Occupancy requested by: Paul Menyharth ###-####
|
DOC - T/O Approved | 7/27/1999 | 7/27/1999 | 7/27/1999 | | PART |
|
|
|
/ / 338 - SIGNED THE TEMP COL OF THE OCC REQ CARD FOR THE SHELL ONLY
|
SUPER- Supervisor's review | 7/20/1999 | 7/20/1999 | 7/20/1999 | | |
|
|
|
corrections include sheetrock on stairs and cover visqueen on walls not approved
|
INSP-Final Inspection | 7/16/1999 | 7/19/1999 | 7/19/1999 | A | FAIL |
Rick Jackson
|
|
|
KEITH ###-#### LIFE SAFETY mechanical resubmittal needed; address; stair completed
|
INSP - Final | 7/16/1999 | 7/19/1999 | 7/19/1999 | P | FAIL |
|
|
|
07/19/99 338 - need other agencies signoffs c/n issued address, flame sp
|
Code Occupancy Approval | | | 7/16/1999 | | FAIL |
|
|
|
Bonded for remaining - stripping, landscaping and steel piping (vertical) on structure.
|
Code Occupancy Approval | | | 7/15/1999 | | |
|
|
|
Temporary occupancy requested by Keith Fickard ###-####
|
INSP - Framing/Rough-in | 6/18/1999 | 6/18/1999 | 6/18/1999 | P | |
Jim Storey
|
|
|
framing
|
INSP - Framing/Rough-in | 6/8/1999 | 6/9/1999 | 6/9/1999 | P | PART |
Jim Storey
|
|
|
06/09/99 301 - truss repair ok
|
INSP - Framing/Rough-in | 6/7/1999 | 6/8/1999 | 6/8/1999 | A | NR |
Jim Storey
|
|
|
06/08/99 301 - roof framing Keith ###-####
|
INSP - Framing/Rough-in | 6/8/1999 | 6/8/1999 | 6/8/1999 | P | CANC |
Jim Storey
|
|
|
06/08/99 301 - Keith ###-####
|
INSP-Conference | 6/7/1999 | 6/7/1999 | 6/7/1999 | P | PASS |
|
|
|
|
INSP - Foundation | 4/9/1999 | 4/9/1999 | 4/9/1999 | P | PART |
|
|
|
made ok with sp insp approvals r-bar is placed
|
INSP - Foundation | 4/7/1999 | 4/7/1999 | 4/7/1999 | | PART |
|
|
|
04/07/99 338 - made ok with sp insp for the s.w. corner to install power
|
INSP - Foundation | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | PART |
|
|
|
04/05/99 338 - made ok for pour with sp insp approval
|
INSP - Foundation | 4/1/1999 | 4/2/1999 | 4/2/1999 | P | CANC |
|
|
|
04/02/99 338 - cancelled by the conc ctr. not per approved plans
|
INSP - Foundation | 3/29/1999 | 3/30/1999 | 3/30/1999 | P | CANC |
|
|
|
03/30/99 338 - ###-#### KEITH//FOOTING//LATE PM cancelled by the cont pe
|
(F) Reprint permit | | | 3/24/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/23/1999 | | |
|
|
|
|
Print Occupancy Form | | | 3/22/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/22/1999 | | |
|
|
|
|
Telephone call | | | 3/22/1999 | | |
|
|
|
TALKEDT TO PAUL WILL FED X CHECKS
|
Plan assigned to (MLO) | 12/3/1998 | | 3/19/1999 | | PASS |
Mike Otto
|
|
|
|
Routing - FIRE | 3/19/1999 | | 3/19/1999 | | PASS |
|
|
|
Shell only LAN SMITH APPROVED HYDRANDT LOCATIONS
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/1999 | | PASS |
|
|
|
APPROVED PER CONDITION, ATTACHMENTS AND AS NOTED MLO
|
Plan Review Completed(1st rev) | | | 3/19/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/17/1999 | | 3/19/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/17/1999 | | PEND |
|
|
|
|
Plan resubmittals requested | | | 3/12/1999 | | FAIL |
|
|
|
CORRECTIONS SENT TO ARCHITECT. MLO
|
Routing - PLAN CHECK | 2/16/1999 | | 3/12/1999 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 3/11/1999 | | PEND |
|
|
|
|
Plan resubmittals received | | | 3/4/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM PATRICK McKEEGAN ARCHITECTS, FORWARDED SAME TO MIKE OTTO. DAR 3/4/99
|
Routing Off Site - STRUCTURAL | 2/24/1999 | | 2/26/1999 | | PASS |
|
|
|
STRUCTURAL RESUBMITTALS SENT TO STRUCTURAL ENGINEER CONSULTANT. 2-26-99 received one copy ofthe response letter from atwood. One copy of designer responses. Structural calculations, and plans. routed to mike o. kmm
|
Plan resubmittals received | | | 2/23/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM PATRICK McKEEGAN, ARCHITECH, FORWARDED SAME TO MIKE OTTO. DAR 2/24/99
|
Routing - PLANNING | 2/3/1999 | | 2/16/1999 | | PASS |
|
|
|
X-REF. DRH99-0014 (MODIFICATION TO DRH98-0199)
|
Plan resubmittals requested | | | 2/12/1999 | | FAIL |
|
|
|
COMMENTS FORM CONSUTLING ENGINEER FAXED TO ARCHITECT. MLO
|
Routing - PUBLIC WORKS | 2/1/1999 | | 2/3/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/2/1999 | | PEND |
|
|
|
RECEIVED ONE COPY OF ORIGINAL VELLUMS OF THE STRUCTURAL DRAWINGS AND ONE COPY OF STRUCTURAL CALCULATIONS. ROUTED TO MIKE O. KMM ALSO RECEIVED APPLICATION WITH TWO COPIES OF PLANS FOR T.I. WILL SPEAK TO MIKE O ON HOW TO PROCEED WITH T.I. KMM
|
Plan resubmittals requested | | | 2/1/1999 | | PEND |
|
|
|
RESUBMITTALS SHORT SET OF PLANS FOR STRUCTURAL CHECK, APPLICATION FOR TI WITH CERTIFICATE OF VALUE NOT INCLUDED. ARCHITECT SENT FAX. MLO
|
Plan resubmittals received | | | 1/29/1999 | | PEND |
|
|
|
received two copies of revised plans and revised engineering calculations. I did not receive a new cert. of value for the T.I. portion for the liquor store. routed to Mike O. kmm
|
Routing - PLUMBING | 1/15/1999 | | 1/15/1999 | | PASS |
|
|
|
PLANS SENT TO PLUMBING FOR GRAIDING APPROVAL ONLY AT THIS TIME. KMM
|
Routing - FIRE | 1/13/1999 | | 1/13/1999 | | PASS |
|
|
|
1-13-99 SENT TO FIRE FOR GRADING ONLY AT THIS TIME. GRADING APPROVED ON CONDITION THAT THE SITE IS SERVED BY AN EXISTING HYDRANT TO BE NOTED ON THE PLANS FOR APPROVAL OF THE CONSTRUCTION PERMIT. PER FLOYD VARLEY. KMM
|
Routing - PLAN CHECK | 12/21/1998 | | 1/13/1999 | | PEND |
|
|
|
NEED NEW APPLICATION AND PLANS FOR CHANGING SCOPE OF WORK TO INCLUDE FINISHED SPACE.
|
Plan resubmittals requested | | | 1/13/1999 | | PEND |
|
|
|
ARCHITECT TO SUBMIT ADDITIONAL PLANS FOR CHANGE FROM SHELL TO PARTIAL OCCUPIED STRUCTURE. MLO
|
Plan Reviewer's activity | | | 1/13/1999 | | PEND |
|
|
|
ARCHITECT HAS NOTIFIED PDS THAT SCOPE OF WORK FOR PROJECT WILL NOW INCLUDE A FINSIHED SPACE ON THE FIRST FLOOR. REVSIED PLANS TO BE PROVIDED PRIOR TO REVIEW. ARCHITECT NOTIFIED THAT ELEVATOR REQUIRED AND EXITS ON 2ND FLOOR TO CLOSE TOGETHER. MLO
|
Routing - PLUMBING | 12/11/1998 | | 12/21/1998 | | FAIL |
|
|
|
AWAITING PLUMBING PLANS.
|
Routing Off Site - STRUCTURAL | 12/3/1998 | | 12/18/1998 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO ENG.
|
Plan resubmittals requested | | | 12/18/1998 | | FAIL |
|
|
|
STRUCTRUAL CORRECTIONS FAXED TO ARCHITECT. MLO
|
Plan resubmittals received | | | 12/18/1998 | | PEND |
|
|
|
RECEIVED TWO COPIES OF SHEETS M-1, M-2, P-1, E-1, E-2, E-3 ROUTED TO MIKE O.
|
Routing - PLANNING | 12/9/1998 | | 12/11/1998 | | PASS |
|
|
|
x-ref. drh98-0199.
|
Routing - PUBLIC WORKS | 12/3/1998 | | 12/9/1998 | | FAIL |
|
|
|
REQUIRES STREET LIGHTING PLAN. PER BILL COLSON. 12/09/98 DAR
|
Plan routing begun/NEW & ADDTN | 12/3/1998 | | 12/3/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 11/30/1998 | | 12/3/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/3/1998 | | PASS |
|
|
|
11-30-98 PAT NEEDS TO COME IN AND CROSS OUT RESTROOM ON FIRST FLOOR. NOT DOING T.I. FOR LIQUOR STORE AT THIS TIME. REQUIRES THREE COPIES OF CIVIL SHEETS. CONTACTED PAT MCKEEGAN OF THIS NEED. KMM PAT ALSO WAS INTERESTED IN A DEMO AND GRADING PERMITS. I TOLD HIM ABOUT NEW CERTS. OF VALUES AND REVISED CERT. FOR THE BUILDING. KMM 12-03-98 RECEIVED CIVIL SHEETS, REVISED CERTS. AND TOOK CARE OF RESTROOM. KMM
|
Received Certificate of Value | | | 12/3/1998 | | PASS |
|
|
|
11-30-98 WILL NEED TO BE REVISED DUE TO DEMO AND GRADING PERMITS PAT WANTS TO PULL. KMM 12-03-98 RECEIVED CERT. OF VALUES. PUT WITH PLANS AND MIKE O. KMM
|
Recd Pcfee & Taken To Pln CK | | | 11/30/1998 | | |
|
|
|
|
Application received | | | 11/30/1998 | | PASS |
|
|
|
|
INSP - Framing/Rough-in | 6/17/1999 | 6/18/1999 | 6/11/1989 | P | FAIL |
Jim Storey
|
|
|
06/18/99 301 - trans to ppaine
|
Case Summary (BLD) | | | | | |
|
|
|
|
Routing - PLANNING | 3/18/1999 | | | | |
|
|
|
REVISIONS REQUIRE PLANNING APPROVAL.MLO
|