Description
To construct a 1,680 sq.ft. assembly occupancy to be used as a place of worship, that will connect to 2 existing duplexs of 4233 sq.ft. for a total of 5,913 sq.ft. per approved plans and CUP98-0092/DRH98-0152. Work to include, construction of one-hour fire-resistive walls for occupancy separations, distance to property lines, and to support the one hour roof ceilings assembly in lew of parapets. Construction of one fully accessible restroom. remodel an existing kitchen that will be used to serve the assembly area. Construction of an accessible ramp to the kithchen and restroom. And upgrade apartments with smoke detectors were required, New HVAC system, electrical and plumbing. NOTE: Selective demolition was performed under BLD99-0096 (P.C.#828-98)*RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/20/20036/20/20036/20/2003 DONE
Permanent occupancy  1/12/2000 DONE
Perm. Occ. Cert. #8082 issued 1-12-00 to the Vedic Temple.
FIRE-Final Inspection1/10/20001/10/20001/10/2000APASS
DetailsRick Jackson
BLD-Final1/10/20001/10/20001/10/2000 PASS
DetailsJim Storey
Permanent Occupancy 1/10/20001/10/2000 DONE
Details
Temporary occupancy  11/22/1999 PART
Tim extended temp. occ. #3893 thru 12-31-99 pending receipt of some custom doors being shipped. Rick and Jim Storey are holding up sign off until this occurs.
BLD-Final10/29/199911/1/199911/1/1999ANR
DetailsJim Storey
Cathy has the card! Waiting for main door and hardware/owner said doors are on a ship.
FIRE-Final Inspection10/29/199911/1/199911/1/1999AFAIL
DetailsRick Jackson
Cathy has the card! Awaiting lobby doors.
Telephone call  10/29/1999 DONE
Talked with Jim Campbell re: getting finals - will request them for 11-1-99 he said.
CHANGE STATUS TO (TMP)  10/29/1999 DONE
Code Occupancy Approval  10/28/1999 PASS
LANDSCAPE IN PLACE, ALL CONDITIONS NOW HAVE BEEN MET, FINAL SIGNED OFF AND RELEASE OF BOND SIGNED.
INSP-Final Inspection8/20/19998/20/19998/20/1999PPART
DetailsRick Jackson
main exit hardware
INSP-Final Inspection8/20/19998/20/19998/20/1999AFAIL
DetailsRick Jackson
emergency lights and exit lights
Code Occupancy Approval  8/20/1999 FAIL
NOT ALL CONDITIONS HAVE BEEN MET, SOME LAND SCAPE, SPRINKER SYSTEM AND PARKING, THEY POSTED BOND FOR THE WORK $5450, I SIGNED OFF THE TEMPORARY OCCUPANCY CARD.
Temporary occupancy  8/20/1999 PASS
Temp. Occ. Cert. #3893 issued 8-20-99 to the Vedaic Temple.
INSP-Final Inspection8/18/19998/19/19998/19/1999AFAIL
DetailsRick Jackson
jim ###-#### exit door hardware; smoke detectors;
Code Occupancy Approval  8/18/1999
Temporary Occupancy requested by Jim Campbell ###-####
INSP - Framing/Rough-in7/27/19997/28/19997/28/1999APART
DetailsJim Storey
07/28/99 301 - draft stops ok
INSP - Framing/Rough-in6/29/19996/30/19996/30/1999APASS
DetailsJim Storey
06/30/99 301 - jim ###-#### fr
INSP - Framing/Rough-in6/22/19996/22/19996/22/1999PPART
DetailsJim Storey
06/22/99 301 - jim ###-####
SUPER- Supervisor's review6/11/19996/10/19996/10/1999 PEND
Site review.
INSP - Foundation3/24/19993/24/19993/24/1999PPART
DetailsJim Storey
03/24/99 301 - footing ok
Routing Off Site - A.C.H.D3/12/19993/12/19993/12/1999
received achd on file
Telephone call  3/12/1999 PASS
left mess for bruce poe that plans are ready
Issue PAID IN FULL permit  3/12/1999
Routing - PLAN CHECK2/19/1999 3/12/1999 FAIL
Plan assigned to (R_H)12/22/1998 3/11/1999 PASS
Details
03/11/99 15:03:53 RMH - this action updated by action script from <<>> in Case No. BLD98-3737
Inspection Record Card- Bld  3/11/1999
PLANS/APPL TAKEN TO FRONT DESK  3/11/1999 PASS
Print Pending Permit.LaserJet4  3/11/1999 PASS
Print Occupancy Form  3/11/1999
Plan resubmittals received  3/10/1999
RECEIVED TWO COPIES OF REVISED DRAWINGS NOT STAMPED OR SIGNED. CONTACTED BRUCE POE OF THIS. ONE COPY OF LETTER RESPONDING TO PLAN REVIEW COMMENTS. COPY OF IMPACT FEE CERTIFICATE. BRUCE POE CAME IN AND STAMPED AND SIGNED RESUB. PLANS. ROUTED TO RON HILL. KMM
Routing - FIRE2/18/1999 2/19/1999 PASS
condition on fr construction as per R Hill
Plan Review Completed(1st rev)  2/19/1999 FAIL
ubc issues
Plan Reviewer's activity  2/17/1999 FAIL
Talked to architect and faxed requirements, will route to fire department
Routing - PLAN CHECK2/16/1999 2/17/1999 FAIL
Routing - PUBLIC WORKS2/12/1999 2/16/1999 PASA
Plan resubmittals received  2/10/1999
RECEIVED TWO COPIES OF REVISED SHEETS A0.0, A1.0, A2.0, A3.0, A4.0, A5.0, A6.0, A7.0, M-1, E-1. TWO COPIES OF OF STRUCTURAL CALCULATIONS. ROUTED TO RON H. KMM
Application received  2/10/1999 PASS
received record declaration form. kmm
Plan Reviewer's activity  1/5/1999 FAIL
Can not do plan complete plan check prior to receiving more information, talked to Architect and mailed requirements to Architect. I will not route to fire department until I receive additional requirements.
Routing - PLUMBING12/28/1998 12/29/1998 PASS
Routing - PUBLIC WORKS12/23/1998 12/28/1998 FAIL
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. DAR 12/28/98
Routing - PLANNING12/23/1998 12/23/1998 PASS
approved per DRH98-0152.
Plan assigned to (MYS)12/1/1998 12/22/1998
DetailsMarlene Southard
Plan routing begun/TENANTS  12/22/1998
Route to PLANNING, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Routing - PLANNING12/22/1998 12/22/1998 PASS
CUP98-0092 Approved. Joint parking agreement in file. Density reduction survey complete.
Plans ACCEPTED BY PLAN TECH  12/21/1998 PASS
RECEIVED TWO COPIES OF ELEC. PLUMB. MECH. STAMPED PLANS. ROUTED TO MARLENE. KMM
Plans ACCEPTED BY PLAN TECH  12/3/1998 HOLD
12-03-98 REQUIRES ELEC. PLUMB. AND MECH. PLANS. CONTACTED BRUCE POE OF THIS NEED. KMM
Recd Pcfee & Taken To Pln CK  12/1/1998
Application received  12/1/1998 PEND
12-03-98 REQUIRES RECORD DECL FORM. FAXED TO BRUCE POE.