BLD-Final | 1/26/2000 | 1/27/2000 | 1/27/2000 | P | CANC |
Russ Owen
|
|
|
gc cell ###-#### jim --fn ---for homeowner's house 1/27/00 3:44:18 PM wanted pm insp. 1/27/00 3:44:43 PM
|
INSP - Energy code compliance | 2/5/1999 | 2/8/1999 | 2/8/1999 | A | PASS |
Wes Worcester
|
|
|
02/08/99 342 - JIM ###-####
|
INSP - Framing/Rough-in | 2/3/1999 | 2/4/1999 | 2/5/1999 | A | PASS |
Wes Worcester
|
|
|
02/04/99 342 - ###-#### energy ok
|
INSP - Framing/Rough-in | 1/19/1999 | 1/19/1999 | 1/19/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - shear panels at back wall
|
INSP - Foundation | 12/18/1998 | 12/18/1998 | 12/18/1998 | P | PART |
Carl Dependahl
|
|
|
jim 3:00...walls, steel in place, ok.
|
INSP - Foundation | 12/16/1998 | 12/16/1998 | 12/16/1998 | P | PART |
Carl Dependahl
|
|
|
JIM ###-#### SCHEDULED TO POOR AT 2PM...ftgs only, ok, has 2 #4 cont.
|
Issue PAID IN FULL permit | | | 12/15/1998 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/1998 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/14/1998 | | PASS |
|
|
|
plans did not indicate any engineering. contractor can use red-lined conditions from boise city wall bracing for light frame residential or provide stamped calculations from licenced idaho eng.
|
Inspection Record Card- Bld | | | 12/14/1998 | | |
|
|
|
|
Telephone call | | | 12/14/1998 | | |
|
|
|
called permit ready
|
Print Pending Permit.LaserJet4 | | | 12/14/1998 | | PASS |
|
|
|
|
Application received | | | 12/7/1998 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/7/1998 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 12/7/1998 | | PEND |
|
|
|
talked with designer and left message with contractor. Standard wall bracing not indicated. Engineering required for rear wall (both levels), garage wing walls, and 2nd story front wall.
|