INSP - Final | 4/1/1999 | 4/1/1999 | 4/1/1999 | P | PASS |
Russ Owen
|
|
|
04/01/99 407 - window with board,glass company will chnge out,next to ba
|
INSP - Final | 3/31/1999 | 3/31/1999 | 3/31/1999 | P | FAIL |
Russ Owen
|
|
|
03/31/99 407 - left corrections.
|
INSP - Final | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | FAIL |
Russ Owen
|
|
|
03/30/99 407 - LOCKED OUT.
|
INSP - Energy code compliance | 1/27/1999 | 1/28/1999 | 1/28/1999 | A | PASS |
Wes Worcester
|
|
|
01/27/99 342 - BRIAN ###-####
|
INSP - Framing/Rough-in | 1/26/1999 | 1/26/1999 | 1/26/1999 | P | PART |
Wes Worcester
|
|
|
01/26/99 342 - brian- ###-#### fr insp
|
INSP - Framing/Rough-in | 1/21/1999 | 1/22/1999 | 1/22/1999 | A | PASS |
Wes Worcester
|
|
|
01/22/99 342 - briggs signed off
|
INSP - Framing/Rough-in | 1/13/1999 | 1/13/1999 | 1/13/1999 | P | FAIL |
Wes Worcester
|
|
|
01/13/99 342 - shear wall/###-####
|
Plan Reviewer's activity | | | 1/13/1999 | | PASS |
|
|
|
Dan asked me Mon. Jan. 11, 1999 to review additional info builder brought in and issue permit. I only saw one set of prints on Dans desk, so I didn't review. Builder came in on Tues. and notice a set of his plans on the back counter at the front desk. Pat came and got me and I took the set from the builder and told him I would look at it. I reviewed the eng. and talked to the eng. (eng. o.k.)
|
Issue PAID IN FULL permit | | | 1/13/1999 | | |
|
|
|
|
INSP - Framing/Rough-in | 1/12/1999 | 1/12/1999 | 1/12/1999 | P | FAIL |
Wes Worcester
|
|
|
01/12/99 342 - BRIAN- ###-#### SHEAR missing hold downs, need eng'd fix INCORRECT ENGINEERING, FRAMING ON EARLY START.
|
Plan assigned to (DJO) | 12/7/1998 | | 1/12/1999 | | PEND |
Dan Overy
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/12/1999 | | PASS |
|
|
|
|
Telephone call | | | 1/12/1999 | | |
|
|
|
called permit ready
|
Inspection Record Card- Bld | | | 1/12/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/12/1999 | | PEND |
|
|
|
|
Plan assigned to (SAM) | 1/12/1999 | | 1/12/1999 | | PASS |
Steve Munroe
|
|
|
01/12/99 15:49:20 SAM - this action updated by action script from <<>> in Case No. BLD98-3788
|
Application/Plans DENIED | | | 12/14/1998 | | PEND |
|
|
|
Dan O Rejected
|
Plan Reviewer's activity | | | 12/14/1998 | | PEND |
|
|
|
called designer and contractor. plans need to be resubmitted indicating wall bracing and engineering.
|
INSP - Foundation | 12/10/1998 | 12/11/1998 | 12/11/1998 | A | FAIL |
Wes Worcester
|
|
|
changed by 342 as it is an early start, at site 342 was told it was not an early start and plan on site did not address
|
Plans ACCEPTED BY PLAN TECH | | | 12/11/1998 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 12/7/1998 | | 12/8/1998 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/7/1998 | | |
|
|
|
|
Routing - PLANNING | 12/7/1998 | | 12/7/1998 | | PASS |
|
|
|
|
Application received | | | 12/7/1998 | | |
|
|
|
|
Routing - PLAN CHECK | 12/8/1998 | | | | PEND |
|
|
|
|