Fee Review-notes | 3/1/1999 | | 4/26/1999 | | |
|
|
|
|
Fee Review-notes | 2/9/1999 | | 4/26/1999 | | |
|
|
|
2 different values final $140,000/mls
|
Permanent Occupancy | | 4/16/1999 | 4/16/1999 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/16/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7745 issued 4-16-99 to Ben Bridge Jewler at Boise Towne Square.
|
INSP-Final Inspection | 4/14/1999 | 4/15/1999 | 4/15/1999 | A | PASS |
Joe Tawney
|
|
|
04/15/99 406 - REINSP OK FOR PERM OCC
|
INSP - Final | 4/14/1999 | 4/15/1999 | 4/15/1999 | P | PASS |
Carl Dependahl
|
|
|
04/15/99 340 - MIKE ###-####; CARD TO MGR., OK FOR PERM
|
INSP-Conference | 4/14/1999 | 4/14/1999 | 4/14/1999 | P | PART |
Carl Dependahl
|
|
|
04/14/99 340 - MIKE ###-####; onsite w/ cont, make fire c/n
|
INSP - Final | 4/12/1999 | 4/13/1999 | 4/13/1999 | P | NR |
Carl Dependahl
|
|
|
04/13/99 340 - ###-#### MIKE//FINAL; need fire ok, no insp.
|
INSP-Final Inspection | 4/12/1999 | 4/13/1999 | 4/13/1999 | A | FAIL |
Joe Tawney
|
|
|
04/13/99 406 - FINAL FAIL AHU SMOKE DET, EXH DAMPERS, FIRE EXT
|
INSP - Framing/Rough-in | 3/23/1999 | 3/24/1999 | 3/24/1999 | A | PART |
Carl Dependahl
|
|
|
03/24/99 340 - ceiling ###-#### adam\\ben bridge jeweler\\unit #2173 clg ok at rear area
|
INSP - Framing/Rough-in | 3/8/1999 | 3/8/1999 | 3/8/1999 | | PART |
Carl Dependahl
|
|
|
03/08/99 340 - rec'd eng's drawing. ok to continue; add wires as req'd
|
INSP - Framing/Rough-in | 3/5/1999 | 3/8/1999 | 3/8/1999 | P | PART |
Carl Dependahl
|
|
|
03/08/99 340 - rec'd eng'g. ok to continue
|
INSP - Framing/Rough-in | 3/4/1999 | 3/5/1999 | 3/5/1999 | P | FAIL |
Carl Dependahl
|
|
|
03/05/99 340 - keep c/n, need stamped eng'g
|
INSP - Framing/Rough-in | 3/3/1999 | 3/4/1999 | 3/4/1999 | A | FAIL |
Carl Dependahl
|
|
|
03/04/99 340 - need to frame storefront per plan, seal smoke & demising
|
INSP - Framing/Rough-in | 3/1/1999 | 3/1/1999 | 3/1/1999 | P | FAIL |
Carl Dependahl
|
|
|
interior cover only ###-#### Adam..need elec r/i, etc
|
Issue PAID IN FULL permit | | | 2/11/1999 | | |
|
|
|
|
Print Occupancy Form | | | 2/9/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/1999 | | |
|
|
|
|
Plan assigned to (R_H) | 12/14/1998 | | 2/8/1999 | | PASS |
|
|
|
02/08/99 10:27:21 R_H - this action updated by action script from <<>> in Case No. BLD98-3796
|
Print Pending Permit.LaserJet4 | | | 2/8/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/4/1999 | | 2/7/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 2/5/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEET FOR STOREFRONT SECTIONS AND DETAILS. ROUTED TO RON H. KMM
|
Telephone call | | | 2/5/1999 | | PEND |
|
|
|
Called and left message for Gregg Clinkum that the engineering for the safe was still required, and I called the engineer Mr. Buckingham and left message.
|
Plan resubmittals received | | | 1/26/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTALS, FORWARDED SAME TO RON HILL. DAR 1/26/99
|
Telephone call | | | 1/20/1999 | | FAIL |
|
|
|
TALKED WITH ENGINEER FOR PROJECT AND EXPLAINED TO HIM WHAT IS REQUIRED.
|
CHANGE STATUS TO (P) | | | 1/4/1999 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/4/1999 | | PASS |
|
|
|
|
Routing - FIRE | 12/28/1998 | | 12/31/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/15/1998 | | 12/31/1998 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 12/28/1998 | | FAIL |
|
|
|
faxed requirements to the architect, will route to the fire department.
|
Routing - PUBLIC WORKS | 12/14/1998 | | 12/15/1998 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 12/14/1998 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plan assigned to (MYS) | 12/8/1998 | | 12/14/1998 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/9/1998 | | PASS |
|
|
|
|
Application received | | | 12/8/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/8/1998 | | PEND |
|
|
|
|