Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD98-03801
StatusFinaled
Name PRICE FINANCING PTNRSHIP L P
Site Address 350 N MILWAUKEE ST Unit: 2165
Project NameBTS - #2165
Customer Number 
ePlanReviewNo
Description
To remodel three existing tenant spaces and create one 3,775 sq.ft. retail tenant space per approved plans on file. Work to include, removal of three tenant demising walls and four restrooms, the construction of approximately 112 lf of new storefront, the installation of one roll up grill and one 3'0" X 6' 8" exit door, the construction of two fully accessible restrooms, six fitting rooms one to be fully accessible, construction of a non-combustible partitions to divide stockroom area from retail space, the installation of a suspended ceiling system. Miscelaneous interior finishes. NOTE: This building has a fire sprinkler and smoke control system. Any alteration or modification to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (P.C.#852-98) *RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  6/30/1999 PASS
Perm. Occ. Cert. #7817 issued 6-30-99 to Limited Too at Boise Towne Square.
INSP - Final6/25/19996/28/19996/28/1999APASS
DetailsCarl Dependahl
06/28/99 340 - ok for c/o; ok to sign at office!.
INSP - Final6/24/19996/25/19996/25/1999APART
DetailsCarl Dependahl
06/25/99 340 - need fire ok, struct appears ok. initaled for t/o. Conta
INSP-Final Inspection6/24/19996/25/19996/25/1999APASS
DetailsJoe Tawney
06/25/99 406 - FINAL OK FOR PERM OCC
Permanent Occupancy 6/25/19996/25/1999 DONE
Details
INSP - Framing/Rough-in6/9/19996/10/19996/10/1999APART
DetailsCarl Dependahl
06/10/99 340 - Scheduled by Hello!. Contact phone is [6587016]. storero
INSP-Sprinkler Rough-in/Hydro6/9/19996/9/19996/9/1999 PART
DetailsJoe Tawney
/ / 406 - OK TO COVER ALL SPKLR ROUGH IN
INSP - Framing/Rough-in6/8/19996/8/19996/8/1999 PART
DetailsCarl Dependahl
/ / 340 - CLG OK
INSP - Framing/Rough-in5/24/19995/25/19995/25/1999APART
DetailsCarl Dependahl
05/25/99 340 - SOFFIT OK PENDING ELEC.
INSP-Sprinkler Rough-in/Hydro5/25/19995/25/19995/25/1999 PART
DetailsJoe Tawney
/ / 406 - ROUGH IN OK TO COVER
INSP - Framing/Rough-in5/12/19995/13/19995/13/1999APART
DetailsCarl Dependahl
05/13/99 340 - OK TO COVER Back side storefront only; chk ply over restr
INSP - Framing/Rough-in5/6/19995/7/19995/7/1999PPART
DetailsCarl Dependahl
05/07/99 340 - walls only].
INSP - Framing/Rough-in4/26/19994/27/19994/27/1999ANR
DetailsCarl Dependahl
04/27/99 340 - NEED RESUB. RE BACK EXIT THRU STOREROOM ###-#### MIKE//CO
Issue PAID IN FULL permit  4/19/1999
Telephone call  2/9/1999
left message on machine
Print Occupancy Form  2/9/1999
Telephone call2/9/1999 2/9/1999
Inspection Record Card- Bld  2/9/1999
Plan assigned to (R_H)12/14/1998 2/8/1999 PASS
Details
02/08/99 09:42:14 R_H - this action updated by action script from <<>> in Case No. BLD98-3801
PLANS/APPL TAKEN TO FRONT DESK  2/8/1999 PASS
Print Pending Permit.LaserJet4  2/8/1999 PASS
Routing - PLAN CHECK1/5/1999 2/7/1999 PASS
Plan resubmittals received  2/4/1999
RECEIVED ONE COPY OF STRUCT. CALCS. FOR STOREFRONT. ALSO STOREFRONT SUPPORT DETAILS HAVE BEEN ADDED TO THE CONSTRUCTION DOCUMENTS (S-1 & S-2). THREE COPIES OF REVISED SHEETS A0.0, A9.0, A9.3, A9.4, A9.5, S-1, S-2, ROUTED TO RON HILL. KMM
Routing - FIRE1/4/1999 1/5/1999 PASS
Plan Reviewer's activity  1/4/1999 FAIL
Faxed requirements to architect will route to fire department.
Routing - PLAN CHECK12/15/1998 1/4/1999 FAIL
Routing - PUBLIC WORKS12/14/1998 12/15/1998 PASS
Plan assigned to (MYS)12/8/1998 12/14/1998
DetailsMarlene Southard
Plan routing begun/TENANTS  12/14/1998
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  12/9/1998 PASS
Recd Pcfee & Taken To Pln CK  12/8/1998
Application received  12/8/1998 PASS