Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD98-03861
StatusFinaled
Name INTERMOUNTAIN GAS
Site Address 555 S COLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(INTERMOUNTAIN GAS - BUILDING REMODEL) This building is not fire sprinklered. To remodel the first floor (19,067 sq. ft.) and basement (10,035 sq. ft.) of an existing building. Work includes selective demolition, constructing interior nonbearing walls, building an elevator shaft and installing an elevator, modifying 4 restrooms to be accessible to the disabled, cutting 16 window openings and 1 door opening in the South wall, building a 1-hr fire-resistive corridor, installing additional roof joists, installing suspended acoustic ceilings, and modifying the West entry to be accessible to the disabled all per approved drawings, engineering, and plan review conditions on file. DRH98-0162 PC-865-98 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/18/2003  
Letter of compliance  11/13/2000 DONE
Letter of Compliance #20013 issued 11-13-00.
BLD-Conference11/7/200011/7/200011/7/2000APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/7/2000 9:57:32 AM conf w/ Jordan- Wilcomb...need to recall final
BLD-Final11/7/200011/7/200011/7/2000PPASS
DetailsCarl Dependahl
larry smith ###-####, ok for c/o...sign at office please 11/7/2000 10:33:29 AM
BLD-Conference8/21/20008/21/20008/21/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/21/2000 w/ Tim Jordan re final...need stamped summary
FIRE-Final Inspection11/22/199911/24/199911/24/1999APASS
DetailsJoe Tawney
###-#### bob 6 a.m Reinsp. Ok for cert. Of completion.
BLD-Final11/24/199911/24/199911/24/1999PFAIL
DetailsCarl Dependahl
larry ###-#### C/N; ok for T/O.
BLD-Final11/16/199911/19/199911/19/1999PFAIL
DetailsCarl Dependahl
LARRY ###-#### FN OCC Need others ok's.
FIRE-Final Inspection11/16/199911/18/199911/18/1999PFAIL
DetailsJoe Tawney
BOB ###-#### Final fail; alarm test.
Code Occupancy Approval  11/17/1999 PASS
MEETS COMPLIANCE WITH DRH98-0162. PASS.
BLD-Final11/16/199911/17/199911/16/1999PCANC
DetailsCarl Dependahl
LARRY CELL ###-#### FN OCC CANCEL PER LARRY
FIRE-Final Inspection11/12/199911/16/199911/16/1999AFAIL
DetailsRick Jackson
ray ###-#### No approved alarm plans; off-site monitoring.
BLD-Framing/Rough-in10/7/199910/8/199910/8/1999APART
DetailsCarl Dependahl
LARRY CELL-- ###-#### FR--CEILING w.I.p. grid ok pend elec r/I
INSP - Framing/Rough-in9/9/19999/10/19999/10/1999APART
DetailsCarl Dependahl
rated ceiling at corridor ok, need access for dampers
INSP - Framing/Rough-in8/13/19998/16/19998/16/1999APART
DetailsCarl Dependahl
08/16/99 340 - SIZMIC CEILING. LARRY ###-#### grid & 1st layer at corr o
INSP - Framing/Rough-in7/20/19997/20/19997/20/1999PPART
DetailsCarl Dependahl
conf. w/ bldr, arch, mech eng'r... need to get proposal & ruling re return air at corridor; Also, discussed prior request by me for supporting calculations re canopy (w/ Bob Maxie, arch.) Awaiting opinion from George/ ICBO.
INSP - Framing/Rough-in7/16/19997/19/19997/20/1999APART
DetailsCarl Dependahl
07/19/99 340 - LARRY ###-####; grid cld at east ok, need elec. Check htg
INSP-Conference7/6/19997/6/19997/6/1999 PART
DetailsJoe Tawney
/ / 406 - CONF W/LARRY REG FIRE CODE ITEMS
INSP - Framing/ Rough-in6/28/19996/28/19996/28/1999 PART
DetailsCarl Dependahl
/ / 340 - INT PARTS, GRID OK; AWAITING CALCS FOR EXT.CANOPY; KEEP C/N
INSP - Framing/Rough-in6/17/19996/17/19996/17/1999PPART
DetailsCarl Dependahl
06/17/99 340 - ###-####//SEISMIC CEILING GRID; ok pend elec/htg
INSP - Foundation6/7/19996/7/19996/8/1999PPART
DetailsCarl Dependahl
06/07/99 340 - Larry; ftgs;pending eng's revision detail, MTI onsite
INSP - Framing/Rough-in6/7/19996/7/19996/7/1999PPART
DetailsCarl Dependahl
06/07/99 340 - larry ###-####, furring at office walls
INSP - Foundation6/4/19996/4/19996/4/1999 PART
DetailsCarl Dependahl
/ / 340 - SPEC INSP REQ'D? CONF W/JORDAN-WILCOMB
INSP - Framing/Rough-in5/25/19995/25/19995/25/1999AFAIL
DetailsCarl Dependahl
no insp; rec'd letter fom Maxey Arch's re plan modifications at elevator.
Plan resubmittals received  4/13/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM CHUCK TOOKEY, MAXEY & MAXEY ARCHITECTS, FORWARDED SAME TO CARL DEPENDAHL. DAR 4/13/99
Issue PAID IN FULL permit  3/30/1999
Routing - PLAN CHECK1/8/1999 3/5/1999 PASS
Drawings approved, with conditions, after resubmittal review.
Plan assigned to (CJW)12/21/1998 3/5/1999 PASS
DetailsCarl Westfall
03/05/99 14:14:13 CJW - this action updated by action script from <<>> in Case No. BLD98-3861
Plan Reviewer's activity  3/5/1999 PASS
Drawings approved, with conditions, after resubmittal review.
Plan resubmittals received  3/5/1999 PEND
Additional resubmittals received from the architect.
PLANS/APPL TAKEN TO FRONT DESK  3/5/1999 PASS
testing condition printout  3/5/1999
Print permit w/o conditions  3/5/1999
Telephone call  3/5/1999 PASS
LEFT MESS THAT PLANS ARE READY
Print Occupancy Form  3/5/1999
Inspection Record Card- Bld  3/5/1999
Plan resubmittals received  2/18/1999 PEND
RECEIVED RESUBMITTALS FROM BOB MAXEY, MAXEY AND MAXEY ARCHITECTS, FORWARDED SAME TO CARL WESTFALL. DAR 2/18/99
Plan Review Completed(1st rev)  1/8/1999 FAIL
UBC issue
Routing - FIRE1/7/1999 1/8/1999 PASS
Routing - PLAN CHECK12/29/1998 1/6/1999
Plan Reviewer's activity  1/4/1999
UBC plan review started January 4, 1999 and finished January 6, 1999. A response from the Architect is required. See conditions list.
Routing - PUBLIC WORKS12/29/1998 12/29/1998 PASS
Routing - PLANNING12/21/1998 12/29/1998 PASS
Plan assigned to (MYS)12/15/1998 12/21/1998
DetailsMarlene Southard
Plan routing begun/TENANTS  12/21/1998
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE.
Recd Pcfee & Taken To Pln CK  12/15/1998
Plans ACCEPTED BY PLAN TECH  12/15/1998 PASS
Application received  12/15/1998 PASS
Case Summary (BLD)