Case Summary (BLD) | | | 1/19/2005 | | |
|
|
|
|
PubWorks Occupancy Approval | | | 1/23/2001 | | DONE |
|
|
|
Drainage project not inspected, not completed according to plans. Project complete as of 01/23/01. M.Strasser
|
Letter of compliance | | | 1/14/2000 | | DONE |
|
|
|
Letter of Compliance #18335 issued 1-14-00.
|
BLD-Final | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | PART |
Russ Owen
|
|
|
Pending engineers approval of special inspection report.
|
BLD-Final | 1/6/2000 | 1/7/2000 | 1/7/2000 | P | PART |
Russ Owen
|
|
|
mike ###-#### call first to meet there. Need engineers approval of special inspection reports.
|
BLD-Framing/Rough-in | 9/17/1999 | 9/20/1999 | 1/7/2000 | A | PASS |
Russ Owen
|
|
|
mike-- ###-#### fr insp
|
BLD-Final | 12/23/1999 | 12/23/1999 | 12/23/1999 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/23/1999 at 08:46:09. Contact: ###-####. Need public works.
|
(F) Reprint permit | | | 12/22/1999 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 09:43:12. Contact: ###-####. Occupancy approved.
|
FIRE-Sprinkler Rough-in | 12/2/1999 | 12/2/1999 | 12/2/1999 | P | FAIL |
Rick Jackson
|
|
|
alan ###-#### hydro stat test unit 100 Hydro okay; sway bracing not complete; FDC.
|
BLD-Conference | 11/23/1999 | 11/24/1999 | 11/24/1999 | A | PART |
Russ Owen
|
|
|
Mike ###-#### Pre-inspection only.
|
BLD-Conference | 11/2/1999 | 11/3/1999 | 11/2/1999 | A | PART |
Rick Jackson
|
|
|
mike ###-#### conf insp Address problems; sprinkler issues.
|
Fee Review-notes | 1/12/1999 | | 10/27/1999 | | DONE |
|
|
|
final 214,757.00 difference this value was split 3 ways for all the permits. they gave me one lump sum. new cert proj 1,284,357.00 ele 42,868.00 plm 26,444.00 mec 35,201.00 these values covered all three shell permits 98-3901,3909,3910
|
Plan Reviewer's activity | | | 10/6/1999 | | PASS |
|
|
|
AT THE REQUEST OF THE ARCHITECT OF RECORD, KENNETH C. MILLO, THE CONSTRUCTIONS TYPE OF THIS BUILDING HAS BEEN CHANGED TO TYPE V-NONRATED WITH AUTOMATIC SPRINKLER SYSTEM BEING USED FOR ALLOWABLE AREA INCREASE. THE CONSTRUCTION TYPE WAS ORIGINALLY APPROVED AS TYPE II-NONRATED WITHOUT SPRINKLERS.
|
Inspection Record Card- Bld | | | 10/6/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/6/1999 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/27/1999 | 9/27/1999 | 9/27/1999 | A | FAIL |
Bob Archibald
|
|
|
Conference w/Mike at job site wood framing to cease and any wood framing will result in SWO of entire job. Framers pulled off roof.
|
BLD-Conference | 9/27/1999 | 9/27/1999 | 9/27/1999 | P | FAIL |
Bob Archibald
|
|
|
Returned and Left phone message w/Scott that any wood framing would result in SWO.
|
BLD-Framing/Rough-in | 9/21/1999 | 9/21/1999 | 9/21/1999 | P | PART |
Carl Dependahl
|
|
|
###-#### mike upper parapet ok to cover center building.
|
INSP - Foundation | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | PART |
Russ Owen
|
|
|
05/14/99 407 - special insp.ok.
|
INSP - Concrete | 5/10/1999 | 5/11/1999 | 5/11/1999 | A | PART |
Russ Owen
|
|
|
05/11/99 407 - subject to special inspection.
|
INSP - Concrete | 5/6/1999 | 5/6/1999 | 5/6/1999 | P | PART |
Russ Owen
|
|
|
05/06/99 407 - rebar clearance needed,corrections being made,special ins
|
INSP - Foundation | 4/27/1999 | 4/28/1999 | 4/28/1999 | A | PART |
Russ Owen
|
|
|
04/28/99 407 - ok subject to special inspector,who is on site now.
|
(F) Reprint permit | | | 4/26/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/21/1999 | | |
|
|
|
|
Print Occupancy Form | | | 4/21/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/21/1999 | | |
|
|
|
|
Telephone call | | | 4/21/1999 | | |
|
|
|
talked to roy faxed over copy of $ amounts for him to cut check
|
Plan assigned to (JCM) | 12/21/1998 | | 4/20/1999 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/30/1999 | | 4/20/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/12/1999 | | 4/19/1999 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE OUT ADDITIONAL STRUC. COMMENT FOR RAM PLAZA PER JOHN M. KMM RECIEVED A FAX FROM THE CONSULTING ENGIEER INDICATING THAT ALL REQUIRED STRUCTURAL REVISIONS HAD BEEN ADEQUATELY ADDRESSED.
|
Plan Reviewer's activity | | | 4/19/1999 | | PEND |
|
|
|
HAVE REVIEWED AND APPROVED LAST RESUBMITTALS. THE PERMIT CAN BE ISSUED AFTER RECEIPT OF FINAL CERTIFICATE OF VALUE.
|
Plan resubmittals received | | | 4/12/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS S3.1, S1.1, S2.1, S7.1, S7.2 PLUS ONE COPY OF CALCS. FROM ALLEN MILLO ASSO. ROUTED TO JOHN M. KMM
|
Plan resubmittals requested | | | 4/5/1999 | | PEND |
|
|
|
FAXED MONTE CHAPIN AT ALLEN - MILLO ASSOCIATES REQUESTING ADDITIONAL REVISIONS NOT COMPLETED ON THE FIRST RESUBMITTAL.
|
Plan resubmittals received | | | 4/2/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM ALLEN MILLO ASSOCIATES, FORWARDED SAME JOHN MENARD. DAR 4/2/99
|
Routing - PLANNING | 3/16/1999 | | 3/30/1999 | | PASS |
|
|
|
approved per DRH98-0113.
|
Routing Off Site - STRUCTURAL | 3/15/1999 | | 3/17/1999 | | FAIL |
|
|
|
RESUBMITTALS SENT TO OUTSIDE STRUCTURAL ENGINEER. DAR 3/15/99
|
Plan resubmittals requested | | | 3/17/1999 | | PEND |
|
|
|
FAXED KENNETH MILLO A COPY OF THE CONSULTING STRUCTURAL ENGINEERS COMMENT LIST FOR THE LATEST STRUCTURAL RESUBMITTALS.
|
Routing - PUBLIC WORKS | 3/12/1999 | | 3/15/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/19/1999 | | 3/12/1999 | | |
|
|
|
|
Plan resubmittals received | | | 3/12/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM ARMEN TAROIAN, FORWARDED SAME TO JOHN MENARD. DAR 3/12/99
|
Routing - PUBLIC WORKS | 2/18/1999 | | 2/19/1999 | | FAIL |
|
|
|
REQUIRES STREET LIGHT PLAN. BILL COLSON
|
Routing - PLAN CHECK | 2/5/1999 | | 2/18/1999 | | |
|
|
|
|
Routing - FIRE | 2/2/1999 | | 2/5/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 2/5/1999 | | FAIL |
|
|
|
ubc, planning & PW fails
|
Routing - PLAN CHECK | 1/4/1999 | | 2/1/1999 | | |
|
|
|
|
Plan resubmittals requested | | | 1/11/1999 | | PEND |
|
|
|
MAILED THE ARCHITECT A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
|
Routing Off Site - STRUCTURAL | 12/22/1998 | | 1/7/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE OUT TO OUTSIDE ENG. MUST WAIT FOR ENG. SET. CONTACTED RICHARD RAY TO LET HIM KNOW THAT I NEED AN ENG. SET. KMM RECEIVED OUTSIDE ENG. COPY. 12-22-98
|
Plan resubmittals requested | | | 1/5/1999 | | PEND |
|
|
|
FAXED KENNETH MILLO (ARCHITECT OF RECORD) A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER FOR REQUESTED STRUCTURAL CORRECTIONS.
|
Routing - PLUMBING | 12/30/1998 | | 1/4/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 12/28/1998 | | 12/30/1998 | | FAIL |
|
|
|
Revised plans indicating compliance with Design Review conditions (DRH98-0113) must be submitted for review and approval. Phoned Ken Millo, architect, and discussed this with him.
|
Routing - PLANNING | 12/28/1998 | | 12/29/1998 | | FAIL |
|
|
|
AS PER VARIANCE CVA98-0009; Design Review conditions not met (per DRH98-0113).
|
Plan resubmittals received | | | 12/28/1998 | | |
|
|
|
RECEIVED THREE COPIES OF SHEET S7.0 ROUTED ONE COPY TO OUTSIDE ENG. AND PUT COPY WITH OUT SET. KMM
|
Routing - PUBLIC WORKS | 12/22/1998 | | 12/28/1998 | | FAIL |
|
|
|
RERQUIRES STREET LIGHT PLAN PER BILL COLSON. SEWER STUB IS 6 INCH RATHER THAN 8 INCH PER JOHN JOHNSON. REQUIRES DRAINAGE PLAN REVISIONS AND CACULATIONS PER BRIAN MURPHY. 12/28/98 DAR
|
Plan routing begun/NEW & ADDTN | | | 12/22/1998 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/1998 | | PASS |
|
|
|
WAITING FOR OUTSIDE ENG. COPY. CONTACTED MR. RAY OF THIS NEED. KMM 12-22-98 received outside eng. copy. BUILDINGS
|
Received Certificate of Value | | | 12/21/1998 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 12/18/1998 | | 12/21/1998 | | |
Marlene Southard
|
|
|
|
Application received | | | 12/18/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/18/1998 | | |
|
|
|
|