Letter of compliance | | | 1/14/2000 | | DONE |
|
|
|
Letter of Compliance #18334 issued 1-14-00.
|
BLD-Final | 1/10/2000 | 1/10/2000 | 1/10/2000 | P | PART |
Russ Owen
|
|
|
Pending engineers approval of special inspection report.
|
(F) Reprint permit | | | 12/22/1999 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 09:45:53. Contact: ###-####. Occupancy approved.
|
FIRE-Sprinkler Rough-in | 12/2/1999 | 12/2/1999 | 12/2/1999 | P | FAIL |
Rick Jackson
|
|
|
unit 300 alan ###-#### hydro stat test Hydro fail; sway bracing; ball drip for FDC.
|
Plan resubmittals received | | | 11/24/1999 | | PEND |
|
|
|
Received plan resubmittals (Gas piping for building 300 from Elkhorn Engineers), forwarded same to David Lightfoot. 11/24/99 DAR
|
FIRE-Conference | 11/3/1999 | 11/3/1999 | 11/3/1999 | A | PART |
Rick Jackson
|
|
|
Addressing problems; sprinkler issues.
|
BLD-Framing/Rough-in | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PASS |
Russ Owen
|
|
|
MIKE ###-####
|
BLD-Framing/Rough-in | 10/26/1999 | 10/27/1999 | 10/27/1999 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### No super. On site
|
Fee Review-notes | 12/22/1998 | | 10/27/1999 | | DONE |
|
|
|
214,757.00 additional value was split 3 ways value from gc
|
BLD-Framing/Rough-in | 10/15/1999 | 10/15/1999 | 10/15/1999 | P | FAIL |
Russ Owen
|
|
|
mike-- ###-#### fr insp left correction on job trailer window
|
Plan Reviewer's activity | | | 10/6/1999 | | PASS |
|
|
|
AT THE REQUEST OF THE ARCHITECT OF RECORD, KENNETH C. MILLO, THE CONSTRUCTION TYPE OF THIS BUILDING IS HAS BEEN CHANGED TO TYPE V-NONRATED WITH AUTOMATIC SPRINKLER SYSTEM BEING USED FOR ALLOWABLE AREA INCREASE. THE CONSTRUCTION TYPE WAS ORIGINALLY APPROVED AS TYPE II-NONRATED WITHOUT SPRINKLERS.
|
Inspection Record Card- Bld | | | 10/6/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/6/1999 | | DONE |
|
|
|
|
INSP - Framing/Rough-in | 9/14/1999 | 9/15/1999 | 9/15/1999 | A | PASS |
Russ Owen
|
|
|
BLDG 300 OK TO COVER UPPER PARAPET
|
INSP - Framing/Rough-in | 9/13/1999 | 9/14/1999 | 9/14/1999 | A | FAIL |
Russ Owen
|
|
|
SAME CORRECTIONS, MORE SCREWS ETC.
|
INSP - Framing/Rough-in | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | FAIL |
Russ Owen
|
|
|
NEEDS MORE SCREWS AND FASTENERS ON EXT UPPER PARAPETS. ALSO TALKED W STEED ABOUT JOB CONSTRUCTION TYPE AND TOLD THEM TO CONTACT ARCHITECT ABOUT REVISIONS
|
INSP - Framing/Rough-in | 9/8/1999 | 9/8/1999 | 9/8/1999 | P | PART |
Russ Owen
|
|
|
MIKE ###-####; 9/8 Talked w architect about requirements for Type IIN construction, roof over framing on plan doesn't comply, as told at plan check. jrb
|
INSP - Framing/Rough-in | 9/7/1999 | 9/7/1999 | 9/7/1999 | | FAIL |
Russ Owen
|
|
|
9-7 Need change from architect for ext parapet walls. JRB;
|
INSP - Framing/Rough-in | 8/23/1999 | 8/24/1999 | 8/24/1999 | A | PART |
Russ Owen
|
|
|
08/24/99 407 - ok per special inspection.
|
INSP - Concrete | 8/3/1999 | 8/3/1999 | 8/3/1999 | P | PART |
Russ Owen
|
|
|
08/03/99 407 - subject to special inspection.
|
INSP - Framing/Rough-in | 7/27/1999 | 7/27/1999 | 7/27/1999 | P | PART |
Russ Owen
|
|
|
07/27/99 407 - subjects to a special inspection.
|
INSP - Foundation | 7/21/1999 | 7/22/1999 | 7/22/1999 | A | PART |
Russ Owen
|
|
|
07/22/99 407 - subject to special inspection.
|
INSP - Concrete | 7/8/1999 | 7/8/1999 | 7/8/1999 | P | PASS |
Russ Owen
|
|
|
07/08/99 407 - special inspector will approve.
|
INSP - Concrete | 7/6/1999 | 7/7/1999 | 7/7/1999 | A | PART |
Russ Owen
|
|
|
07/07/99 407 - subject to special inspector.
|
INSP - Concrete | 7/1/1999 | 7/2/1999 | 7/2/1999 | A | PART |
Russ Owen
|
|
|
07/02/99 407 - ok mti on site,has approvred pouring grout.
|
INSP - Framing/Rough-in | 6/30/1999 | 6/30/1999 | 6/30/1999 | P | PART |
Russ Owen
|
|
|
06/30/99 407 - special inspection letter to folow.
|
INSP - Foundation | 6/25/1999 | 6/28/1999 | 6/28/1999 | A | PART |
Russ Owen
|
|
|
06/28/99 407 - masonary rebar grout at 1pm Mike ###-####,subject to spec
|
INSP - Concrete | 6/23/1999 | 6/24/1999 | 6/25/1999 | P | PART |
Russ Owen
|
|
|
06/24/99 407 - ok special inspector ,has approved,meet with at site.
|
INSP - Concrete | 6/16/1999 | 6/16/1999 | 6/16/1999 | P | PART |
Russ Owen
|
|
|
06/16/99 407 - subject to special inspection.
|
INSP - Concrete | 6/10/1999 | 6/11/1999 | 6/11/1999 | A | PART |
Russ Owen
|
|
|
06/11/99 407 - special inspection.
|
INSP - Foundation | 6/10/1999 | 6/10/1999 | 6/10/1999 | P | PART |
Russ Owen
|
|
|
06/10/99 407 - Mike ###-####
|
INSP - Foundation | 6/3/1999 | 6/4/1999 | 6/4/1999 | P | PART |
Russ Owen
|
|
|
06/04/99 407 - ok per special inspection.
|
INSP - Foundation | 5/27/1999 | 5/28/1999 | 5/28/1999 | A | PART |
|
|
|
05/28/99 338 - MADE OK TO POUR FOUND WITH SP INSP APPROVAL
|
INSP - Foundation | 5/24/1999 | 5/24/1999 | 5/24/1999 | P | PART |
Russ Owen
|
|
|
05/24/99 407 - pour subjects to special inspection.
|
INSP - Foundation | 5/20/1999 | 5/21/1999 | 5/21/1999 | P | PART |
Russ Owen
|
|
|
05/21/99 407 - ok per special inspector.
|
(F) Reprint permit | | | 4/26/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/21/1999 | | |
|
|
|
|
Print Occupancy Form | | | 4/21/1999 | | |
|
|
|
|
Telephone call | | | 4/21/1999 | | |
|
|
|
faxed over to roy
|
Inspection Record Card- Bld | | | 4/21/1999 | | |
|
|
|
|
Plan assigned to (JCM) | 12/21/1998 | | 4/20/1999 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/30/1999 | | 4/20/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/12/1999 | | 4/19/1999 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE ADDITIONAL STRUCTURAL COMMENT FOR RAM PLAZA TO OUTSIDE ENG. PER JOHN M. KMM
|
Plan Reviewer's activity | | | 4/19/1999 | | PEND |
|
|
|
REVIEWED AND APPROVED RESUBMITTALS. PERMIT CAN ISSUED AFTER RECEIPT OF THE FINAL CERTIFICATE OF VALUE.
|
Plan resubmittals received | | | 4/12/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS S3.1, S1.1, S2.1, S7.1, S7.2 PLUS ONE COPY OF CALCS. FROM ALLEN MILO ASSOC. ROUTED TO JOHN M. KMM
|
Plan resubmittals requested | | | 4/5/1999 | | PEND |
|
|
|
FAXED MONTE CHAPIN REQUESTING REVISIONS NOT COMPLETED ON THE FIRST RESUBMITTALS.
|
Plan resubmittals received | | | 4/2/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM ALLEN * MILLO, FORWARDED SAME TO JOHN MENARD. DAR 4/2/99
|
Routing - PLANNING | 3/16/1999 | | 3/30/1999 | | PASS |
|
|
|
approved per DRH98-0113.
|
Routing Off Site - STRUCTURAL | 3/15/1999 | | 3/17/1999 | | FAIL |
|
|
|
SENT RESUBMITTALS TO OUTSIDE STRUCTURAL ENGINEER. DAR 3/15/99
|
Routing - PUBLIC WORKS | 3/12/1999 | | 3/16/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/19/1999 | | 3/12/1999 | | |
|
|
|
|
Plan resubmittals received | | | 3/12/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM ARMEN TAROIAN, FORWARDED SAME TO JOHN MENARD. DAR 3/12/99
|
Routing - PUBLIC WORKS | 2/18/1999 | | 2/19/1999 | | FAIL |
|
|
|
REQUIRES STREET LIGHT PLAN.
|
Routing - PLAN CHECK | 2/5/1999 | | 2/19/1999 | | |
|
|
|
|
Routing - FIRE | 2/2/1999 | | 2/5/1999 | | PASS |
|
|
|
sprinklers if requied will be under separate permit
|
Plan Review Completed(1st rev) | | | 2/5/1999 | | FAIL |
|
|
|
ubc, pw and planning failure
|
Routing - PLAN CHECK | 1/4/1999 | | 2/1/1999 | | |
|
|
|
|
Plan resubmittals requested | | | 1/11/1999 | | PEND |
|
|
|
MAILED KENNETH MILLO (ARCHITECT OF RECORD) A COPY OF THE COMMENT LIST REQUESTING REVISIONS.
|
Routing Off Site - STRUCTURAL | 12/22/1998 | | 1/7/1999 | | FAIL |
|
|
|
CONTACTED RICHARD RAY FOR OUTSIDE ENG. COPY. CONTACTED PDQ TO TAKE PLANS OUT TO OUTSIDE ENG. 12-22-98 RECEIVED ENG. COPY
|
Plan resubmittals requested | | | 1/5/1999 | | PEND |
|
|
|
FAXED KENNETH MILLO (ARCHITECT OF RECORD) A COPY OF THE CONSULTING ENGINEER'S COMMENT LIST REQUESTING REVISIONS.
|
Routing - PLUMBING | 12/30/1998 | | 1/4/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 12/28/1998 | | 12/30/1998 | | FAIL |
|
|
|
PER DRH98-0113 SEE MEMO IN BLD98-3901 FOR REASON FOR FAILURE.
|
Routing - PLANNING | 12/28/1998 | | 12/29/1998 | | PASS |
|
|
|
PER VARIANCE CVA98-0009
|
Plan resubmittals received | | | 12/28/1998 | | |
|
|
|
RECEIVED THREE COPIES OF SHEETS S7.0. PUT ONE COPY TO OUTSIDE ENG. AND PUT TWO COPIES WITH INHOUSE SET. KMM
|
Routing - PUBLIC WORKS | 12/22/1998 | | 12/28/1998 | | FAIL |
|
|
|
SEE BLD98-3901
|
Plan routing begun/NEW & ADDTN | 12/22/1998 | | 12/22/1998 | | |
|
|
|
|
Received Certificate of Value | | | 12/21/1998 | | PASS |
|
|
|
|
Application received | | | 12/18/1998 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/18/1998 | | PASS |
|
|
|
CONTACTED RAY RICHARD TO LET HIM KNOW THAT WE NEED OUTSIDE ENG. SET. 12-22-98 RECEIVED OUTSIDE ENG. COPY
|