Case Summary (BLD) | | | 6/17/2003 | | |
|
|
|
|
Fee Review-notes | 12/22/1998 | | 3/15/2000 | | DONE |
|
|
|
|
Fee Review-notes | 5/5/1999 | | 3/15/2000 | | DONE |
|
|
|
change in values
|
Permanent occupancy UNPAID FEE | | | 3/8/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8151 issued 3-8-00 to the Boise Rescue Mission.
|
Permanent Occupancy | | 3/7/2000 | 3/7/2000 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2000 | | PART |
|
|
|
Talked with Tony Chung re: status of temp. - he hopes to have project completed by the end of February.
|
BLD-Final | 1/11/2000 | 1/12/2000 | 1/12/2000 | A | PART |
|
|
|
SIGNED THE OCC REQ CARD TEMP COL bill --###-#### fn occ
|
Temporary occupancy | | | 1/12/2000 | | DONE |
|
|
|
Temp. Occ. Cert. #3967 issued 1-12-00 to the Boise Rescue Mission.
|
BLD-Conference | 1/6/2000 | 1/6/2000 | 1/6/2000 | A | FAIL |
|
|
|
met with bill and tony on the acessability requirements for door hardware and restrooms low level xit sign req,s
|
BLD-Conference | 1/4/2000 | 1/4/2000 | 1/4/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/04/2000 at 11:05:54. Contact: ###-####.
|
BLD-Final | 12/28/1999 | 12/29/1999 | 12/29/1999 | A | FAIL |
|
|
|
C/N ISSUED DOOR HARDWARE ANDEXIT SIGNS NOT INSTALLEDBILL ###-####
|
FIRE-Final Inspection | 12/27/1999 | 12/28/1999 | 12/28/1999 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 16:14:15. Contact: ###-####. Occ. approved.
|
FIRE-Final Inspection | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 08:55:37. Contact: ###-####. C/N issued- too many items to list.
|
FIRE-Sprinkler Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
Rick Jackson
|
|
|
###-#### Sidewall in corridor.
|
FIRE-Supply Line Flush | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PASS |
Rick Jackson
|
|
|
###-#### Flush ok.
|
FIRE-Alarm Testing | 9/27/1999 | 9/30/1999 | 9/30/1999 | | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 15:18:59. Contact: ###-####. Alarms not complete; reviewed plans and installation
|
BLD-Conference | 9/23/1999 | 9/23/1999 | 9/23/1999 | P | PART |
|
|
|
Conf. On drywall behind tubs
|
BLD-Conference | 9/22/1999 | 9/22/1999 | 9/22/1999 | A | PART |
|
|
|
with bill needs to have drywall behind the tubs, will look at solutions
|
INSP - Framing/Rough-in | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | FAIL |
|
|
|
08/30/99 338 - ele box protectionn required
|
INSP - Wall cover | 8/20/1999 | 8/20/1999 | 8/20/1999 | | FAIL |
|
|
|
CN issued for walk-in cooler location. Rated wall and door jamb must be maintained.
|
SUPER- Supervisor's review | 8/20/1999 | 8/20/1999 | 8/20/1999 | | FAIL |
|
|
|
Site visit (cooler area).
|
INSP - Framing/Rough-in | 8/3/1999 | 8/3/1999 | 8/3/1999 | P | PART |
|
|
|
08/03/99 338 - made ok to cover upper ceilings and walls w/o plmg.
|
SUPER- Supervisor's review | 7/28/1999 | 7/28/1999 | 7/28/1999 | | |
|
|
|
still in progess
|
SUPER- Supervisor's review | 7/15/1999 | 7/15/1999 | 7/15/1999 | | |
|
|
|
reviewd panel with elec inspector. marv will check clearance from ducts and contractor will build wall assembly behind panel to remove it from rated wall.
|
SUPER- Supervisor's review | 7/14/1999 | 7/14/1999 | 7/14/1999 | | |
|
|
|
on site with p. paine. reviewed frame with bill keys job super. fireblock throughout cut off conceiled space and call for another inspection. question on panel=elec in rated wall.
|
INSP - Wall cover | 7/14/1999 | 7/14/1999 | 7/14/1999 | | FAIL |
|
|
|
/ / 338 - WITH SUPERVISOR NOT READY FOR INSP OTHER AGENCIES NOT APPROV
|
INSP - Wall cover | 7/14/1999 | 7/14/1999 | 7/14/1999 | | FAIL |
|
|
|
/ / 338 - WITH SUPERVISOR NOT READY FOR INSP OTHER AGENCIES NOT APPROV
|
INSP - Framing/Rough-in | 7/12/1999 | 7/13/1999 | 7/13/1999 | A | FAIL |
|
|
|
07/13/99 338 - not ready for any inspections super not on the jobsite wi
|
Routing - FIRE | 6/16/1999 | | 6/23/1999 | | |
|
|
|
FED EXED ONE COPY OF PLANS TO FLOYD. BILL A HAS REMAINING COPY. KMM RECEIVED PLANS BACK FROM FLOYD. HE COULD NOT SEE HOW THEY APPLIED TO HIM FOR REVIEW. I ROUTED BACK TO MIKE P. KMM
|
Plan resubmittals received | | | 6/22/1999 | | PEND |
|
|
|
RECEIVED PLUMBING RESUBMITTALS FROM ENDSLEY AND ASSOCIATES, FORWARDED SAME TO MIKE PHILLIPS. DAR 6/22/99
|
INSP - Framing/Rough-in | 6/2/1999 | 6/2/1999 | 6/2/1999 | | PART |
|
|
|
06/02/99 338 - conf with owner,arch drywaller and the contr on the rated
|
INSP - Foundation | 5/27/1999 | 5/27/1999 | 6/1/1999 | P | CANC |
Jim Storey
|
|
|
05/27/99 301 - p paine
|
INSP - Foundation | 5/25/1999 | 5/25/1999 | 5/25/1999 | P | PART |
|
|
|
05/25/99 338 - ok for form completed areas
|
INSP - Foundation | 5/19/1999 | 5/21/1999 | 5/21/1999 | P | PART |
|
|
|
05/21/99 338 - madeok to pour the ele, and to grade walls
|
INSP - Foundation | 5/19/1999 | 5/20/1999 | 5/20/1999 | P | PART |
|
|
|
05/20/99 338 - ok to pour walls at the ele/stairwell
|
SUPER- Supervisor's review | 5/18/1999 | 5/18/1999 | 5/18/1999 | | |
|
|
|
met with tom cory to review tji installation tom made recomendations for temparary shoring to support floor in basement but tjis were ok
|
SUPER- Supervisor's review | 5/14/1999 | 5/14/1999 | 5/14/1999 | | PEND |
|
|
|
Tom Cory.
|
SUPER- Supervisor's review | 5/13/1999 | 5/13/1999 | 5/13/1999 | | |
|
|
|
rebar improperly set per plan correct to meet plan and call for reinspect
|
INSP - Foundation | 5/12/1999 | 5/13/1999 | 5/13/1999 | P | PART |
|
|
|
05/13/99 338 - ok to complete the footing pours
|
INSP - Foundation | 5/11/1999 | 5/12/1999 | 5/12/1999 | P | PART |
|
|
|
05/12/99 338 - madeok to pour the footings of north addition only
|
INSP - Foundation | 5/10/1999 | 5/11/1999 | 5/11/1999 | A | PART |
|
|
|
05/11/99 338 - madeok for the elevator pit walls only
|
INSP - Foundation | 5/11/1999 | 5/11/1999 | 5/11/1999 | P | |
|
|
|
pooring at 3:30 Randy ###-####
|
INSP - Framing/Rough-in | 5/6/1999 | 5/7/1999 | 5/7/1999 | A | FAIL |
|
|
|
05/07/99 338 - need more conf been working on the project w/o permits
|
Print Occupancy Form | | | 5/5/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/5/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/5/1999 | | |
|
|
|
|
Plan assigned to (M_P) | 12/23/1998 | | 5/4/1999 | | PASS |
Mike Phillips
|
|
|
05/04/99 16:17:39 M_P - this action updated by action script from <<>> in Case No. BLD98-3916
|
Routing - FIRE | 5/3/1999 | | 5/4/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 5/4/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/4/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/4/1999 | | 5/4/1999 | | |
|
|
|
|
Plan resubmittals received | | | 5/3/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED E-7 SHEETS ROUTED TO MIKE P. KMM
|
Routing - FIRE | 4/30/1999 | | 4/30/1999 | | FAIL |
|
|
|
Need to show electrical to operate the fire/smoke dampers.
|
Plan Reviewer's activity | | | 4/30/1999 | | PEND |
|
|
|
Routing to Fire Departmetn for review.
|
Routing - PLAN CHECK | 4/14/1999 | | 4/30/1999 | | |
|
|
|
Routing to fire department for follow up review.
|
Plan resubmittals received | | | 4/26/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM THOMAS ENSLEY & ASSOCIATES, FORWARDED SAME TO MIKE PHILLIPS. DAR 4/26/99
|
Routing - FIRE | 4/13/1999 | | 4/13/1999 | | CANC |
|
|
|
no change from last time through on issues
|
Routing - PLAN CHECK | 4/2/1999 | | 4/12/1999 | | |
|
|
|
Routing to fire department for follow up review.
|
Plan Reviewer's activity | | | 4/12/1999 | | FAIL |
|
|
|
Second set of corrections sent out.
|
Plan resubmittals requested | | | 4/12/1999 | | FAIL |
|
|
|
Second set of corrections requested.
|
Plan resubmittals received | | | 4/5/1999 | | PEND |
|
|
|
Receive resubmittals from Thomas Ensley Architects, forwarded same to Michael Phillips. DAR 4/5/99
|
Routing - FIRE | 4/2/1999 | | 4/2/1999 | | FAIL |
|
|
|
mechanical plans still don't protect corridor or show cooking hood shaft
|
Routing - PLUMBING | 3/31/1999 | | 4/2/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/26/1999 | | FAIL |
|
|
|
Requested additional meeting with Tom to discuss resubmittals. Have meeting on March 30 at 1:30.
|
Plan resubmittals received | | | 3/23/1999 | | PEND |
|
|
|
Received plan resubmittals from T.R.Ensley & Associates, Architects, forwarded same to Michael Phillips. DAR 3/23/99
|
Routing - FIRE | 3/5/1999 | | 3/10/1999 | | FAIL |
|
|
|
corridor protection, grease duct protection, exits from 2nd floor
|
Plan Review Completed(1st rev) | | | 3/10/1999 | | FAIL |
|
|
|
plumbing, ubc and ufc
|
Routing - PLAN CHECK | 2/1/1999 | | 3/5/1999 | | |
|
|
|
|
Plan resubmittals requested | | | 3/3/1999 | | FAIL |
|
|
|
ADDITIONAL INFORMATION REQUIRED TO BE SUBMITTED FOR AN ADDITIONAL REVIEW.
|
Plan resubmittals received | | | 2/24/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS M1.1, P0.0, P0.1, P2.1, P2.2, P2.3, P2.4, P3.1, P4.1, PLUS THREE COPIES OF ADDENDA AND CLARIFICATIONS ADDENDUM NO. 2 ROUTED TO MIKE P. KMM
|
Plan resubmittals received | | | 2/9/1999 | | PEND |
|
|
|
RECEIVED ADDENDUM NUMBER 1 FROM THOMAS ENSLEY AND ASSOCIATES, FORWARDED SAME TO MIKE PHILLIPS. DAR 1/10/99
|
Routing - PLUMBING | 1/28/1999 | | 2/1/1999 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 1/21/1999 | | 1/28/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 1/7/1999 | | 1/21/1999 | | PASS |
|
|
|
Per DRH98-0157 conditions
|
Routing - PLANNING | 1/5/1999 | | 1/7/1999 | | PASS |
|
|
|
CUP98-0044, CUP98-0115 I HAVE APROVED THESE PLANS AND SENT THEM ON TO DESIGN REVIEW FOR REVIEW SAR
|
Routing Off Site - C.D.H | 12/23/1998 | | 1/5/1999 | | PASS |
|
|
|
12-23-98 CAROL WILL BE INTO LOOK AT PLANS. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 1/5/1999 | | PASS |
|
|
|
BRIAN MURPHY RECEIVED FIVE COPIES OF GRADING AND DRAINAGE PLUS CALCS. WILL ROUTE TO PW WHEN I RECEIVE BACK FROM CDH. KMM
|
Routing Off Site - STRUCTURAL | 12/23/1998 | | 12/23/1998 | | |
|
|
|
ENG. WILL BE DONE INHOUSE PER JOHN M.
|
Plan routing begun/NEW & ADDTN | | | 12/23/1998 | | PEND |
|
|
|
SEE ACTION A006 PEND.
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/1998 | | PEND |
|
|
|
REQUIRES FIVE COPIES OF GRADING AND DRAINAGE PLANS WITH CALCS. PER BRIAN M. WILL ROUTE TO CDH IN THE MEAN TIME. KMM CONTACTED TONY CHUNG OF THIS NEED.
|
Waiting for Cert. of Value | | | 12/22/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/22/1998 | | |
|
|
|
|
Application received | | | 12/22/1998 | | PASS |
|
|
|
|
Routing - PLUMBING | 6/22/1999 | | | | |
|
|
|
|