(F) Reprint permit | | | 10/27/1999 | | DONE |
|
|
|
|
Fee Review-notes | 4/8/1999 | | 10/27/1999 | | DONE |
|
|
|
|
Letter of compliance | | | 10/22/1999 | | DONE |
|
|
|
Letter of Compliance #18161 issued 10-22-99.
|
BLD-Final | 10/20/1999 | 10/21/1999 | 10/21/1999 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/20/1999 at 20:00:07. Contact: ###-####. L/C only, shell. Card to cont.
|
BLD-Final | 10/15/1999 | 10/18/1999 | 10/18/1999 | A | PART |
Carl Dependahl
|
|
|
###-#### T/I ok for C/O, card to contractor
|
BLD-Final | 10/13/1999 | 10/14/1999 | 10/14/1999 | A | FAIL |
Carl Dependahl
|
|
|
tim--- ###-#### cell fn occ insp C/N issued occupied W/O temp. occ. Sign off
|
PRINT ACTIONS | | | 10/14/1999 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/14/1999 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/6/1999 | 10/7/1999 | 10/7/1999 | A | PASS |
Rick Jackson
|
|
|
tim ###-#### reinsp ok for cert at completion
|
BLD-Final | 10/6/1999 | 10/6/1999 | 10/6/1999 | P | FAIL |
Carl Dependahl
|
|
|
###-####\ keep c\n
|
BLD-Final | 9/21/1999 | 9/21/1999 | 9/21/1999 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/21/1999 at 07:22:25. Contact: ###-####. C/N; safety glazing, other finals, ok for T/O card to contractor
|
FIRE-Final Inspection | 9/20/1999 | 9/20/1999 | 9/20/1999 | | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 09/20/1999 at 08:21:54. Contact: ###-####. Ok for temp. occ. On shell
|
Code Occupancy Approval | | | 9/17/1999 | | PASS |
|
|
|
THIS PERMIT IS FOR BOTH THE STORE AND BANK (DRH98-0128) THE DUMPSTER SCREENING IS NOT COMPLETED AND THE FRONT LANDSCAPE IS NOT COMPLETED FOR THE BANK, I AM SIGNING OFF THE BANK AS A FINAL BUT WILL HOLD UP STORE TILL ALL CONDITIONS HAVE BEEN MET FOR THE COMPLETE PROJECT. SIGNS, LANDSCAPE, REMOVE TRAILERS, AND OTHER CONDITIONS FOR BOTH BUILDINGS.
|
Other | 9/9/1999 | 9/10/1999 | 9/10/1999 | A | PART |
Carl Dependahl
|
|
|
ok to continue ceiling, keep c/n
|
Other | 9/9/1999 | 9/9/1999 | 9/9/1999 | | FAIL |
Carl Dependahl
|
|
|
ceiling grid... C/N
|
INSP - Framing/Rough-in | 7/30/1999 | 7/30/1999 | 7/30/1999 | P | NR |
Jim Storey
|
|
|
07/30/99 301 - ROOF DRAIN EAST SIDE OF KEY BANK BOB ###-#### late insp t
|
INSP - Framing/Rough-in | 7/20/1999 | 7/20/1999 | 7/20/1999 | P | PART |
Carl Dependahl
|
|
|
07/20/99 340 - ok to cover restrooms; hd bolts installed ok. Contact ph
|
INSP - Framing/Rough-in | 7/14/1999 | 7/14/1999 | 7/14/1999 | P | PART |
Carl Dependahl
|
|
|
07/14/99 340 - complete bolts at ext wall; ok to cover at safe area.Sche
|
INSP - Framing/Rough-in | 6/30/1999 | 6/30/1999 | 6/30/1999 | P | PART |
Carl Dependahl
|
|
|
06/30/99 340 - roof struct ok shear wall nailing ok, fasten hd's. Conta
|
INSP - Framing/Rough-in | 6/23/1999 | 6/25/1999 | 6/28/1999 | P | FAIL |
Carl Dependahl
|
|
|
06/25/99 340 - NEED OTHER INSPS 1ST 06/25/99 340 - Scheduled by Hello!. Contact phone is [8502262].
|
INSP - Concrete | 6/23/1999 | 6/25/1999 | 6/25/1999 | A | PART |
Carl Dependahl
|
|
|
06/25/99 340 - spec insp onsite. Contact phone is [8502262]. pend repor
|
INSP - Foundation | 6/24/1999 | 6/24/1999 | 6/24/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF W/BLDR RE FRAME REQ'S
|
INSP - Framing/ Rough-in | 6/24/1999 | 6/24/1999 | 6/24/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF ONLY W/ BLDR
|
INSP - Concrete | 6/7/1999 | 6/8/1999 | 6/8/1999 | A | PART |
Carl Dependahl
|
|
|
06/08/99 340 - pend specinsp reports.MTI onsite Contact phone is [850226
|
INSP - Foundation | 5/27/1999 | 5/27/1999 | 5/27/1999 | P | PART |
Carl Dependahl
|
|
|
05/27/99 340 - mti onsite, pend report. Contact phone is [8502262].
|
INSP - Foundation | 5/26/1999 | 5/26/1999 | 5/26/1999 | P | PART |
Carl Dependahl
|
|
|
05/26/99 340 - Scheduled by Hello!. Contact phone is [8502262]. mti ons
|
INSP - Foundation | 5/24/1999 | 5/25/1999 | 5/25/1999 | P | PART |
Carl Dependahl
|
|
|
05/25/99 340 - [8502262]. MTI ONSITE
|
INSP - Foundation | 5/24/1999 | 5/24/1999 | 5/24/1999 | P | PART |
|
|
|
05/24/99 338 - made ok for pour with sp insp approvals
|
(F) Reprint permit | | | 4/14/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/13/1999 | | |
|
|
|
|
Telephone call | | | 4/8/1999 | | PASS |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Print Pending Permit.LaserJet4 | | | 4/7/1999 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/7/1999 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/7/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/7/1999 | | |
|
|
|
|
Plan assigned to (M_P) | 1/4/1999 | | 4/7/1999 | | PASS |
Mike Phillips
|
|
|
04/07/99 08:58:59 M_P - this action updated by action script from <<>> in Case No. BLD98-3929
|
Routing - PUBLIC WORKS | 4/2/1999 | | 4/5/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/30/1999 | | PEND |
|
|
|
Waitin for others to approve plans and need response to structural comment.
|
Routing - PUBLIC WORKS | 3/29/1999 | | 3/30/1999 | | FAIL |
|
|
|
|
Routing - PLANNING | 3/22/1999 | | 3/29/1999 | | PASS |
|
|
|
Approved per conditions of DRH98-0128.
|
Routing - PUBLIC WORKS | 3/29/1999 | | 3/29/1999 | | FAIL |
|
|
|
REQUIRES PROOF OF LEGAL LAND DIVISION PER JIM RICH. DAR 3/29/99
|
Routing Off Site - STRUCTURAL | 3/19/1999 | | 3/25/1999 | | PASS |
|
|
|
SENT RESUBMITTALS TO CONSULTING STRUCTURAL ENGINEER. DAR 3/19/99
|
Plan resubmittals received | | | 3/8/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM RANDY HAVERFIELD, FORWARDED SAME TO MIKE PHILLIPS. DAR 3/8/99
|
Routing Off Site - STRUCTURAL | 12/29/1998 | | 1/19/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. Requested resubmittals and second review.
|
Routing - FIRE | 1/8/1999 | | 1/13/1999 | | PASS |
|
|
|
as noted a3 and m1
|
Plan Review Completed(1st rev) | | | 1/13/1999 | | FAIL |
|
|
|
ubc, planning and PW issues
|
Plan Reviewer's activity | | | 1/8/1999 | | |
|
|
|
pARTICIAL REVIEW COMPLETED WAITING FOR COMMENTS FROM OUTSIDE ENGINEERING FIRM PRIOR TO SENDING MY COMMENT.
|
Routing - PLUMBING | 1/5/1999 | | 1/5/1999 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 12/29/1998 | | 1/4/1999 | | PASS |
John Menard
|
|
|
|
Routing - PLANNING | 12/31/1998 | | 12/31/1998 | | PASS |
|
|
|
PER CUP
|
Routing - PUBLIC WORKS | 12/29/1998 | | 12/31/1998 | | FAIL |
|
|
|
STREET LIGHTS ARE. THIS PROJECT LIES ADJACENT TO A MAJOR COLLECTOR AS ARTIERIAL. A LIGHTING PLAN DESIGNED TO I.E.S. STANDARDS MUST BE SUBMITTED FOR APPROVAL BY THE BOISE CITY PUBLIC WORKS DEPARTMENT FOR THE FOLLOWING ROADWAY: ENTRANCE ON OVERLAND ENTRANCE ON ORCHARD. PER BILL COLSON. KMM
|
Plan assigned to (MYS) | 12/28/1998 | | 12/29/1998 | | |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/29/1998 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/29/1998 | | PASS |
|
|
|
|
Application received | | | 12/28/1998 | | PASS |
|
|
|
|
Received Certificate of Value | | | 12/28/1998 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/28/1998 | | |
|
|
|
|