Permit Information
Permit NumberBLD98-03935
StatusFinaled
Name ATTN: MIKE VAN HOOK
Site Address 1103 W MILLER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel the interior and the exterior of this existing 12,130 sq.ft. building and remodel 9,130 sq.ft of the interior for new communications tenant per approved plans on file. Exterior work to include stucco/repaint, add a new roof structure, remove curbcuts and improve existing parkways and interior partitions per approved plans. DRH98-0246. (P.C.#044-99)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/23/20002/23/20003/15/2000 DONE
(F) Reprint permit  3/14/2000 DONE
Permanent occupancy UNPAID FEE  3/9/2000 DONE
Perm. Occ. Cert. #8157 issued 3-9-00 to Williams Communications.
BLD-Final3/6/20003/8/20003/8/2000PPASS
Details
signed the occ req card perm
Permanent Occupancy 3/8/20003/8/2000 DONE
Details
Code Occupancy Approval  3/8/2000 PASS
Jim S. inspected 3/3/00 - still needed 3 lights up. Site inspection revealed lighting complete. DRH98-0246 File contains "conflicting data". Site plans and etc. show efffectively what was constructed as it is on site....accompanying building elevations depict the rod-iron fence to be placed at the east side of the rear (south elevation) of the building in lieu of the west side of the rear (south elevation) of the building. Building elevations are dated rec'd/ 12/98. Plans stamped and dated approved and on site are dated 1/29/99. I read through the letter of approval and no notations/conditions had been made to clarify or indicate that "the building elevation plans dated 12/98 were specifically approved as a revision to or to supercede approved plans dated 1/29/99.....therefore, signed off the Final on this project as per approved plans on site.
FIRE-Final Inspection3/3/20003/6/20003/6/2000PPASS
DetailsRick Jackson
Jim ###-####
BLD-Other11/22/199911/22/199911/22/1999PPART
Details
BOND BEAM JIM ###-#### (11/26/99 eng. Shear SFNDS).
BLD-Footing11/4/199911/4/199911/4/1999PPART
Details
jim--- ###-#### ft insp Ok w/sp insp. Approval
BLD-Footing10/29/199910/29/199910/29/1999PPART
Details
jim-- ###-#### ft insp R-bar placed/ sp insp. Ok
BLD-Footing10/25/199910/26/199910/26/1999APART
Details
JIM-- ###-#### FT INSP East to West spread footing for shear wall
BLD-Footing10/18/199910/19/199910/19/1999APART
Details
JIM ###-#### Made ok w/sp. Insp approvals
BLD-Concrete10/1/199910/4/199910/4/1999PPART
Details
AROUND 1:30 IF POSSIBLE JIM ###-#### made ok w/ sp insp approval drill dowels into exist footing
Routing Off Site - A.C.H.D8/17/1999 8/17/1999
The brought in a certificate verifying that they paid the permit #on the certificate was 99-2339
Telephone call  8/17/1999 PASS
jim###-####
Issue PAID IN FULL permit  8/17/1999
Plan assigned to (MLO)1/20/1999 8/16/1999 PASS
DetailsMike Otto
Print Occupancy Form  8/16/1999
PLANS/APPL TAKEN TO FRONT DESK  8/16/1999 PASS
Inspection Record Card- Bld  8/16/1999
Telephone call8/10/1999 8/10/1999
Talked to Pamela Dreef at Gensler ###-#### about prep for permit issuance. Informed her that the 6 rolls of resubmittals needed to be inserted into the drawings and Mike's final signature and plan review needed to be attached prior to issuance. Pamela is sending the contractor to insert the revised drawings and to pick up a interior demolition permit. The full permit cannot be issued until Mike O. returns.
Routing - PLUMBING8/4/1999 8/9/1999 PASS
Routing - PLAN CHECK8/3/1999 8/4/1999 PASS
Routing Off Site - STRUCTURAL8/3/1999 8/4/1999 PASS
Plan resubmittals received  8/3/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM CARTER BURGESS, FORWARDED SAME TO MIKE OTTO. 8/3/99 DAR
Plan resubmittals requested  7/28/1999 FAIL
STRUCTRUAL CORRECTIONS MAIELD AND FAXED TO APPLICANT. MLO
Routing Off Site - STRUCTURAL7/6/1999 7/26/1999 FAIL
2-22-99 - RECEIVED PLANS BUT CALCULATIONS CANNOT BE COMPLETED UNITL DESIGNING ENGINEER GETS SOILS REPORT PER ARCHITECT. MLO FORWARDED STRUCTUAL PLANS TO CONSULTANT VIA PDQ. DAR 7/6/99
Telephone call  7/20/1999
PAMELA DREEF REQUESTING DEMO PERMIT. I FAXED A NEW CERT. AND THERE ORIGINAL CERT. KMM
Routing - PUBLIC WORKS7/20/1999 7/20/1999 PASS
Plan resubmittals received  7/16/1999 PEND
Plan resubmittals received from CEI Engineering, forwarded two sets to Mike Otto and three sets to brian Murphy. DAR 7/16/99
Routing - PUBLIC WORKS7/16/1999 7/16/1999 FAIL
DRAINAGE PLAN REQUIRES ACHD APPROVAL, PER BRIAN MURPHY. DAR 7/16/99
Plan resubmittals received  7/6/1999
RECEIVED THREE COPIES OF SOILS REPORT, TWO COPIES OF STRUCT. CALCS. THREE COPIES OF S0.01, S2.01, S2.02, S4.01, S4.02, S4.03, S4.04 ROUTED TO MIKE O. KMM
Plan resubmittals requested  3/15/1999 FAIL
SECOND REQUEST FOR STRUCTRUAL CALCULATIONS AND SOILS REPORT. MLO
Routing - PLAN CHECK2/11/1999 3/15/1999 FAIL
HAVE NOT RECEIVED STRUCTURAL CALCS OR SOILS REPORT. ARCHITECT NOTIFIED THAT PLAN REVIEW CANNOT CONTINUE WITHOUT THIS INFORMATION. MLO
Plan resubmittals received  2/22/1999
RECEIVED 2 EA. CORRECTED SHEETS, ONE RESPONSE LETTER WITH 6 ATACHMENTS. ONE COPY OF ARCHITECTRUAL PLANS AND STRUCTURAL PLANS, 3 COPIES OF ALL REVISED PLANS AND WRITTEN RESPONSE LETTER FOR STRUCTURAL REVIEW. THE STRUCT. ENGINEER IS WAITING FOR THE SOILS REPORT BEFORE THEY CAN DO THE STRUCT. CALS. ROUTED TO MIKE O. KMM
Plan resubmittals received  2/22/1999 PEND
RECEIVED RESUBMITTALS BUT STUCTRUAL IS STILL INCOMPLETE. CALCULATIONS HAVE NOT BEEN FINISHED ACCORDING TO ARCHITECT. MLO
Routing - FIRE2/5/1999 2/10/1999 PASS
alarms approved as noted on plans
Plan Review Completed(1st rev)  2/10/1999 FAIL
ubc and pw fails
Plan resubmittals requested  2/5/1999 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
Routing - PLAN CHECK1/27/1999 2/5/1999 FAIL
Routing - PUBLIC WORKS1/21/1999 1/27/1999 FAIL
REQUIRES DRAINAGE PLAN APPROVAL FROM ACHD, PER BRIAN MURPHY. DAR 1/27/99
Routing - PLANNING1/21/1999 1/21/1999 PASS
x-ref. DRH98-0246
Plan assigned to (MYS)12/29/1998 1/20/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  1/20/1999
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE.
Telephone call  1/19/1999
RECEIVED A CALL FROM GREG LACOUR. HE IS REQUESTING A DEMO. HE WILL FAX A REVISED CERT. OF VALUE AND A CERT. OF VALUE FOR THE DEMO. KMM
Plans ACCEPTED BY PLAN TECH  1/19/1999 PASS
1-19-99 RECEIVED STAMPED AND SIGNED PLANS. KMM
Recd Pcfee & Taken To Pln CK  12/29/1998
Application received  12/29/1998 PASS
Plans ACCEPTED BY PLAN TECH  12/29/1998 HOLD
PLANS NOT STAMPED OR SIGNED.
Received Certificate of Value  12/29/1998 PASS
Case Summary (BLD)