INSP - Final | 5/24/1999 | 5/24/1999 | 5/24/1999 | P | PASS |
Jim Sly
|
|
|
05/24/99 316 - C/C # 16173
|
INSP - Final | 5/20/1999 | 5/21/1999 | 5/21/1999 | P | FAIL |
Jim Sly
|
|
|
05/21/99 316 - C/N...Need drainage and 6' exposure rear..and misc energy
|
SUPER- Supervisor's review | 3/31/1999 | 3/31/1999 | 3/31/1999 | | PASS |
|
|
|
Framing ok for insulation. Exterior footing will be insulated.
|
INSP - Energy code compliance | 3/31/1999 | 3/31/1999 | 3/31/1999 | P | PASS |
Tom Arcoraci
|
|
|
03/31/99 408 - bill ###-#### insulation insp
|
INSP - Framing/Rough-in | 3/30/1999 | 3/30/1999 | 3/30/1999 | P | PASS |
Tom Arcoraci
|
|
|
03/30/99 408 - need wattsun with correct parameters on print out
|
INSP - Framing/Rough-in | 3/30/1999 | 3/30/1999 | 3/30/1999 | | PASS |
|
|
|
Ok for insulation.
|
INSP - Framing/Rough-in | 3/29/1999 | 3/29/1999 | 3/29/1999 | A | FAIL |
Tom Arcoraci
|
|
|
|
INSP - Final | 3/29/1999 | 3/29/1999 | 3/29/1999 | P | CANC |
Tom Arcoraci
|
|
|
REINSPECTION ON FINAL BILL ###-#### this is a framing inspection
|
INSP - Framing/Rough-in | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | FAIL |
Jim Sly
|
|
|
03/25/99 316 - C/N...No address, truss eng, or trades appr
|
INSP - Final | 3/23/1999 | 3/24/1999 | 3/24/1999 | P | FAIL |
Jim Sly
|
|
|
03/24/99 316 - Should be frame insp
|
INSP - Framing/Rough-in | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | PART |
Tom Arcoraci
|
|
|
03/10/99 408 - OK TO SIDE CN ISSUED
|
INSP - Foundation | 1/27/1999 | 1/27/1999 | 1/27/1999 | P | PART |
Jim Sly
|
|
|
01/27/99 316 - Rebar on site, not placed...Foot width,height,soil OK Set
|
Issue PAID IN FULL permit | | | 1/11/1999 | | |
|
|
|
|
Telephone call | | | 1/8/1999 | | |
|
|
|
CALLED PERMIT READY
|
Inspection Record Card- Bld | | | 1/8/1999 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/8/1999 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 1/4/1999 | | 1/8/1999 | | PASS |
Steve Munroe
|
|
|
01/08/99 10:21:18 SAM - this action updated by action script from <<>> in Case No. BLD98-3943
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/1999 | | PASS |
|
|
|
|
Plan assigned to (DJO) | 12/29/1998 | | 1/4/1999 | | PEND |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 12/29/1998 | | 12/30/1998 | | PASS |
|
|
|
|
Application received | | | 12/29/1998 | | |
|
|
|
|
Routing - PLANNING | 12/29/1998 | | 12/28/1998 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/30/1998 | | | | PEND |
|
|
|
|