Case Summary (BLD) | | | 9/4/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/11/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 5/8/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 3/11/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 6/29/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 5/26/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 5/26/2005 | | |
|
|
|
|
Permanent occupancy | | | 3/14/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9586 issued 3-14-03 to 24 Hour Fitness.
|
BLD-Final | 3/12/2003 | 3/12/2003 | 3/12/2003 | P | PASS |
Jim Storey
|
|
|
art; Phone #: ###-#### Internet Inspection Request from: Darla Downs please fax copy of signed cooupancy card ###-####
|
Permanent Occupancy | | 3/12/2003 | 3/12/2003 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/12/2003 | | |
|
|
|
Project had not been completed and approved by structural inspection in 1999 / 2000. Aging inspection request brought project up for inspection. Original approved plans nots and modification no longer available a job site. Inspector Jim Storey reviewed archives for requirements. The new parking garage building adjacent to the fitness center did not happen and a note was in the file indicating the project was not constructed. With no garage construction the original requirement for an assumed property line between the structures was not needed and the 1-hour exterior wall with opening protection requirment no longer applied. Jim brought me a copy of the approval note from records concerning this issue. I had approved the notice and put a copy of the approval in our records and submitted a copy for the inspector to return to job site for inclusion in site plans. I am entering this note as part of record of change approval on 6/30/99. drs
|
BLD-Final | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | FAIL |
Jim Storey
|
|
|
###-#### ###-#### need panic hardware at pool stair east 1 st floor door/ smoke seal 2 nd floor mech rm pool area. card on site with nickol. 3/11/2003 10:50:17 AM
|
Print Occupancy Form | | | 3/11/2003 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/7/2003 | | DONE |
|
|
|
per George
|
Fee Review-notes | 2/4/1999 | | 2/8/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | PASS |
Rick Jackson
|
|
|
8:30
|
FIRE-Final Inspection | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | FAIL |
Rick Jackson
|
|
|
need annual sprinkler inspection; supervisory service for sprinklers; NFPA 72
|
FIRE-Final Inspection | 1/12/2000 | 1/13/2000 | 1/13/2000 | P | FAIL |
Rick Jackson
|
|
|
ready at 3 Marty ###-#### Rescheduled for 1/18/00. 1/14/00 2:36:59 PM
|
FIRE-Final Inspection | 11/30/1999 | 12/2/1999 | 12/2/1999 | A | FAIL |
Rick Jackson
|
|
|
tracy ###-#### fn fire Alarms not ready; sprinklers not complete.
|
FIRE-Final Inspection | 11/3/1999 | 11/4/1999 | 11/4/1999 | A | CANC |
Rick Jackson
|
|
|
DEBEST FIRE ###-#### -PER RICK 9:00? Not ready for final
|
FIRE-Sprinkler Rough-in | 11/4/1999 | 11/4/1999 | 11/4/1999 | A | FAIL |
Rick Jackson
|
|
|
Hydro test ok. Sprinkler R/I fail- not fully sprinklered (storage room); wrong heads in several areas.
|
INSP-Conference | 8/23/1999 | 8/24/1999 | 8/24/1999 | A | PART |
Rick Jackson
|
|
|
ART, ###-#### PLEASE CALL PRIOR. discussed alarm submittals - contractor to submit
|
INSP - Framing/Rough-in | 8/19/1999 | 8/20/1999 | 8/20/1999 | P | CANC |
Russ Owen
|
|
|
08/20/99 407 - Scheduled by Hello!. Contact phone is [8411354].
|
INSP - Final | 8/17/1999 | 8/17/1999 | 8/17/1999 | P | CANC |
Russ Owen
|
|
|
08/17/99 407 - art-- call 1st before insp ###-#### pre fin-1st floor
|
INSP-Conference | 7/7/1999 | 7/7/1999 | 7/7/1999 | P | PART |
Rick Jackson
|
|
|
discussed location of exit lights and emergency lights
|
INSP - Framing/Rough-in | 6/23/1999 | 6/24/1999 | 6/24/1999 | A | CANC |
Russ Owen
|
|
|
06/24/99 407 - trans to 301.
|
INSP - Framing/Rough-in | 6/15/1999 | 6/16/1999 | 6/17/1999 | A | PART |
Jim Storey
|
|
|
06/16/99 301 - CONFERENCE Art Buswell ###-#### ok to rock bathroom
|
INSP - Concrete | 4/29/1999 | 4/30/1999 | 4/30/1999 | A | FAIL |
Russ Owen
|
|
|
04/30/99 407 - not ready.
|
Issue PAID IN FULL permit | | | 4/13/1999 | | |
|
|
|
|
Print Occupancy Form | | | 4/9/1999 | | |
|
|
|
|
Telephone call | | | 4/9/1999 | | |
|
|
|
talked to william gave dollar amount
|
Inspection Record Card- Bld | | | 4/9/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 3/9/1999 | | 4/9/1999 | | PASS |
|
|
|
Approved as noted and attached. Received response from architect to outstanding items 4/7/99. Reviewed and inserted into plans. Routing for permits.
|
Plan assigned to (DRS) | 1/8/1999 | | 4/8/1999 | | PASS |
Dan Stuart
|
|
|
04/08/99 18:07:29 DRS - this action updated by action script from <<>> in Case No. BLD99-0021
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/1999 | | PASS |
|
|
|
Processing for issuance of p[ermit based on plans notes & attachements.
|
Plan resubmittals received | | | 4/7/1999 | | |
|
|
|
Received additional plans & comments concerning outstanding items.
|
Meeting | | | 4/1/1999 | | |
|
|
|
Met with Ed Owen, 24-hour fitness head rep, Pat McKeegan architect for proposed new garage; rep from Hilbers Const.; and Monte Von Struck of Project management to review outstanding items and to discuss process once items are answered. Difficult time contacting architect Ken Douglas and this has delayed the plans resubmittal prosess. Plans will be in by next wednesday at the latest. I will process as soon as received.
|
Plan resubmittals requested | | | 3/24/1999 | | |
|
|
|
Completed second review of new plans & response from architect. Mailed copy to architect. Architect was not in office and his phone & fax number are the same. He does not leave his fax on when he is not in.
|
Telephone call | | | 3/22/1999 | | |
|
|
|
Call from Ken Douglass. Told him I was working up a response to last resubmittal for questions that were not answered completeley or not at all from March 4, 199 review. I ask if he had visited the site so he would understand what I was asking him. He told me he had. I will send the second review comments to him as soon as completed. Mr. Douglas was responding to information I had given to Mr. Von Struck, the project manager, when we had done a preliminary review of the plans and I asked him specific questions and shared some concerns. My written comments went to Mr. Douglas the day before the plan resubmittals were turned in for review. I told Mr. Cowling of Project management Group that I had not received a formal response to my questions but I would look at what was submitted between jobs I was now doing but Mr. Douglas should address My plan review.
|
Telephone call | | | 3/19/1999 | | |
|
|
|
Call from Mr. Cowling concerning 24-hour fitness. Told him I was still waiting for response from architect.
|
Plan resubmittals received | | | 3/15/1999 | | |
|
|
|
Received additional information on a boiler room located on the second floor by the locker rooms and it BTU capacity which would require a 1-hour occupancy separation from the rest of the facility. This was from Mr. Cowling and not from the architect.
|
Plan resubmittals received | | | 3/12/1999 | | |
|
|
|
Received partial written response to my March 4, 1999 preliminary plan review. It was from Mr. Cowling of Project Management Group not the architect Mr. Douglass.
|
Plan resubmittals received | | | 3/12/1999 | | |
|
|
|
Received resubmittal for plan review. Received only one copy.
|
Routing - FIRE | 3/4/1999 | | 3/9/1999 | | PASS |
|
|
|
need fire alarms and chlorine room details as delayed submittal.
|
Plan Review Completed(1st rev) | | | 3/9/1999 | | FAIL |
|
|
|
ubc issue
|
Telephone call | | | 3/4/1999 | | |
|
|
|
Mr. Von Struck called to see if I had received additional plans. I told him I had but that I had kust sent my preliminary review list to the architect and the architect neded to submit a response to the plan review comments. I had received only on copy. I had sent the plans on to fire dept. for review.
|
Plan resubmittals received | | | 3/4/1999 | | |
|
|
|
RECEIVED ONE COPY OF REVISED SHEETS A1.0, A1.1A, A1.2, A1.3, A1.4, A1.5, A1.13, E1.1, E1.2, M1.0, M2.0 ROUTED TO DAN S. KMM
|
Print Pending Permit.LaserJet4 | | | 3/3/1999 | | HOLD |
|
|
|
|
Routing - PLAN CHECK | 3/1/1999 | | 3/3/1999 | | HOLD |
|
|
|
Began plan review for proposed remodel project. Routing plan to fire dept. for comments on required submittals for alarm & sprinkler system.
|
Telephone call | | | 3/2/1999 | | |
|
|
|
Received phone message from Monte Von Struck stating that new plans were sent to Brent Jackson for clarifications of concerns we had discussed on the 22 of February and Brent would bring them in.
|
Plan resubmittals received | | | 2/22/1999 | | |
|
|
|
Received two complete sets of new plans for review and comments. Mr Von Struck will have new sheets submitted to clarify the assumed property line concerns and modifications required because of the garage location. I will proceed to review the plans and send a preliminary plan review comment list to the architect.
|
Meeting | | | 2/22/1999 | | |
|
|
|
Met with Mr. Monte Von Struck of Project Management Group, ;isted on the permit application as the contractor for the 24-hour fitness remodel project. He had brougkt in a new set of plans for review that included the structural design information. I set down to review the concerns that I had about the location of the parking garage and how it could effect the locations of new openings shown on the remodel plan, the required wall construction and possible parapet requirements. There are alos some discrepancies between room locations & use on the original plans on file and the plans submitted for review. Mr. VonStruck said he would visit the site to verify conditions and get with the architect to provide us with needed clarifications.
|
Routing - PLAN CHECK | 1/12/1999 | | 2/18/1999 | | HOLD |
|
|
|
Meeting with Pat McKeegan, Jeff Jones, Marlene Southard, John Menard, Tempra Wilson, Brian Murphy, Floyd Varley & Dan Stuart concerning the proposal to add a new enclosed parking structure on the same property as the existing 24-hour fitness center. The proposed remodel of the existing building will be effected by the location and opening of the proposed parking structure. An assumed property line will need to be established to determine where opeings & penetrations are allowed and protection requirements for new and existing openings. Mr. McKeegan said he was not involved with the remodel in relation to the existing building. This is not correct in the sense that one has a direct effect on the other and the common questions involving the property line location and construction requirments will need to be resolved before the projects can move forward. Mr. Jones stated that the city could start a structural review to circulate to our outside engineering consultant but that this would be without any guanantee's until the above noted concerns are resolved. Pat was to conference with the owner and other involved parties before we could meet again.
|
Meeting | | | 2/4/1999 | | |
|
|
|
Meeting with Mr. Bret Jackson of Hilbers Inc., remodel construction company for the existing fitness facility. Mr. Hilbers wanted a demolition permit. There are to many questions about what walls are proposed for demo and if they are structural; the diferences of the existing construction versus what was required (V-1 hour required vs. V-N actual and partial sprinkler system; walls that are bearing cannot be removed until plans for new support system are approved; structural design plans were not presented with the plans for review. Mr. Jackson was aware of the lack of engineering and had gone to a private engineering firm, Atwood-Hinsman-Jones for a design. The footings were redlined on a plan and the design calcs were not completed to present for review. I informed Mr. Jackson concerning the concerns and told him the engineering data would need to be sent to the architect of record and made a part of the plans under his stamp or the structural engineers but the architect would need to verify details on plans and resubmit. Mr. Jackson asked if the architect, Kenneth Douglas could call me for review purposes. I told him that would be fine.
|
Plan routing begun/TENANTS | | | 1/8/1999 | | |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Application received | | | 1/5/1999 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/5/1999 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/8/1999 | | 1/12/1998 | | PASS |
|
|
|
|