INSP - Foundation | 4/5/1999 | 4/5/1999 | 4/5/2009 | P | PASS |
Russ Owen
|
|
|
04/05/99 407 - footings,engineer ok'd24"spice at verticals in retaining
|
Case Summary (BLD) | | | 9/22/2005 | | |
|
|
|
|
BLD-Final | 10/25/1999 | 10/25/1999 | 10/25/1999 | P | PASS |
|
|
|
Mech. correction in force for basement fire place- same is disconnected
|
BLD-Final | 10/22/1999 | 10/22/1999 | 10/22/1999 | P | NR |
Jim Storey
|
|
|
george-- ###-#### fn occ Pending others
|
BLD-Final | 10/21/1999 | 10/21/1999 | 10/21/1999 | P | FAIL |
|
|
|
GEORE ###-#### CALL HIM PLEASE Other agencies not approved
|
INSP - Framing/Rough-in | 8/3/1999 | 8/4/1999 | 8/4/1999 | A | PASS |
Russ Owen
|
|
|
08/04/99 407 - George, ###-####
|
INSP - Framing/Rough-in | 7/29/1999 | 7/30/1999 | 7/30/1999 | P | PART |
Russ Owen
|
|
|
07/30/99 407 - couple of items left,left note.
|
INSP - Energy code compliance | 7/27/1999 | 7/27/1999 | 7/27/1999 | P | FAIL |
Russ Owen
|
|
|
/ / 407 - STIL HAS FRAMING CORRECTIONS.
|
INSP - Framing/Rough-in | 7/23/1999 | 7/26/1999 | 7/26/1999 | A | FAIL |
Russ Owen
|
|
|
07/26/99 407 - Steve ###-####
|
INSP - Energy code compliance | 7/23/1999 | 7/26/1999 | 7/26/1999 | A | FAIL |
Russ Owen
|
|
|
07/26/99 407 - Steve ###-####
|
INSP - Framing/Rough-in | 7/23/1999 | 7/23/1999 | 7/23/1999 | P | CANC |
Russ Owen
|
|
|
07/23/99 407 - not ready.
|
INSP - Framing/Rough-in | 7/19/1999 | 7/20/1999 | 7/20/1999 | A | FAIL |
Russ Owen
|
|
|
07/20/99 407 - still has corrections.
|
INSP - Framing/Rough-in | 7/16/1999 | 7/16/1999 | 7/16/1999 | P | FAIL |
Russ Owen
|
|
|
left correctiomns.nly Steve ###-####
|
INSP - Framing/Rough-in | 7/14/1999 | 7/15/1999 | 7/15/1999 | P | FAIL |
Russ Owen
|
|
|
07/15/99 407 - lower floor addition,2 hold downs misslocated.
|
INSP - Framing/Rough-in | 7/6/1999 | 7/6/1999 | 7/6/1999 | P | PASS |
Russ Owen
|
|
|
07/06/99 407 - sheer Steve ###-####
|
INSP - Framing/Rough-in | 7/1/1999 | 7/2/1999 | 7/2/1999 | P | FAIL |
Russ Owen
|
|
|
07/02/99 407 - need some additional staples.
|
INSP - Foundation | 4/8/1999 | 4/8/1999 | 4/8/1999 | P | PASS |
Russ Owen
|
|
|
walls ok.re-insp.
|
INSP - Foundation | 4/8/1999 | 4/8/1999 | 4/8/1999 | A | FAIL |
Russ Owen
|
|
|
04/08/99 407 - left corrections.
|
INSP - Foundation | 4/1/1999 | 4/2/1999 | 4/2/1999 | A | FAIL |
Russ Owen
|
|
|
04/02/99 407 - engineered retaining wall not per detail. do not pour.
|
Issue PAID IN FULL permit | | | 3/15/1999 | | |
|
|
|
|
Plan assigned to (SAM) | 1/22/1999 | | 3/2/1999 | | PASS |
Steve Munroe
|
|
|
03/02/99 11:30:09 SAM - this action updated by action script from <<>> in Case No. BLD99-0076
|
Telephone call | | | 3/2/1999 | | PASS |
|
|
|
talked to george to verify plans are ready
|
Inspection Record Card- Bld | | | 3/2/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/2/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/2/1999 | | PEND |
|
|
|
|
Plan assigned to (DJO) | 1/11/1999 | | 1/22/1999 | | PEND |
Dan Overy
|
|
|
|
Plan Reviewer's activity | | | 1/22/1999 | | PEND |
|
|
|
Called builder to let him know I need engineering.
|
Routing - PUBLIC WORKS | 1/11/1999 | | 1/13/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 1/11/1999 | | 1/13/1999 | | PASS |
|
|
|
trying to reach barclay construction. Driveway needs to be notified or variance applied for. Hasn't been answer at barclay construction. angie b. went over plans with builder and had contractor red line plans and initial. pe
|
Telephone call | | | 1/12/1999 | | |
|
|
|
left message on Roberts cell phone to call me or come in and redline driveway on plans.
|
Application received | | | 1/11/1999 | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Routing - PLAN CHECK | 1/13/1999 | | | | PEND |
|
|
|
|