Case Summary (BLD) | | | 11/27/2012 | | DONE |
|
|
|
|
Fee Review-notes | 3/10/1999 | | 9/17/1999 | | DONE |
|
|
|
CHANGED VALUES
|
INSP-Final Inspection | 9/2/1999 | 9/3/1999 | 9/3/1999 | A | PASS |
Rick Jackson
|
|
|
tested AHU shutdown - occ approved
|
INSP - Final | 9/2/1999 | 9/3/1999 | 9/3/1999 | A | PASS |
Carl Dependahl
|
|
|
09/03/99 340 - JOSH ###-####
|
Permanent Occupancy | | 9/3/1999 | 9/3/1999 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | | | 9/3/1999 | | DONE |
|
|
|
Drainage project complete, final inspection 09/03/99. Permanent occupancy signed by B.Murphy.
|
Permanent occupancy | | | 9/3/1999 | | PASS |
|
|
|
Perm. Occ. Cert. #7885 issued 9-3-99 to Pro Staff.
|
INSP - Final | 9/1/1999 | 9/2/1999 | 9/2/1999 | P | FAIL |
Carl Dependahl
|
|
|
JOSH ###-####; CALLED, KEEP C/N. NEED FIRE
|
INSP-Final Inspection | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - REINSP FAIL AHU DUCT DETECTORS
|
Code Occupancy Approval | | | 8/31/1999 | | PASS |
|
|
|
Approved by Jim Soden 8/30/98
|
INSP - Final | 8/27/1999 | 8/27/1999 | 8/27/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/27/99 340 - josh ###-####; c/n, fire code, etc; ok for t/o
|
INSP-Final Inspection | 8/27/1999 | 8/27/1999 | 8/27/1999 | P | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - REINSP FAIL S/F DAMPER DETECTION
|
INSP - Final | 8/26/1999 | 8/26/1999 | 8/26/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/26/99 340 - JOSH ###-####.; need fire, etc
|
INSP-Final Inspection | 8/25/1999 | 8/26/1999 | 8/26/1999 | A | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - FINAL FAIL
|
Code Occupancy Approval | | | 8/26/1999 | | |
|
|
|
Temporary Occupancy reguested by Josh ###-####
|
INSP-Final Inspection | 8/24/1999 | 8/25/1999 | 8/25/1999 | P | FAIL |
Joe Tawney
|
|
|
09/01/99 406 - FINAL FAIL
|
INSP - Framing/Rough-in | 8/4/1999 | 8/5/1999 | 8/5/1999 | A | PART |
Carl Dependahl
|
|
|
08/05/99 340 - part grid ok; verbal to seal draft stops prior to tile, r
|
INSP - Framing/ Rough-in | 6/29/1999 | 6/29/1999 | 6/29/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - DRAFT STOPS INSTALLED, SEAL AS NEEDED
|
INSP - Framing/ Rough-in | 6/22/1999 | 6/22/1999 | 6/22/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - TRUSS FIX MADE OK
|
INSP - Framing/Rough-in | 6/14/1999 | 6/14/1999 | 6/14/1999 | | PART |
Carl Dependahl
|
|
|
06/14/99 340 - ###-#### JOSH//FRAMING trusses ok, ok to cover corr. c/n
|
INSP - Framing/Rough-in | 5/25/1999 | 5/26/1999 | 5/26/1999 | A | FAIL |
Carl Dependahl
|
|
|
05/26/99 340 - ###-#### JOSH//FRAMING, c/n draft stops,trusses, shear, e
|
INSP - Framing/Rough-in | 5/25/1999 | 5/25/1999 | 5/25/1999 | P | PART |
Carl Dependahl
|
|
|
05/25/99 340 - Josh ###-####, COMPLETE 1HR WALL, ADD FASTENERS
|
INSP - Framing/Rough-in | 5/20/1999 | 5/21/1999 | 5/21/1999 | A | PART |
Carl Dependahl
|
|
|
###-#### josh//framing; soffit at east 1hr wall ok, need nail off gyp 7" oc at wall both sides. ok to continue.
|
INSP - Framing/Rough-in | 5/13/1999 | 5/13/1999 | 5/13/1999 | P | PART |
Carl Dependahl
|
|
|
05/13/99 340 - initial insp for shear, complete nailing; fasten all memb
|
INSP - Framing/Rough-in | 5/10/1999 | 5/10/1999 | 5/10/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CONF W/ BLDR; PENDING STEEL SPEC. INSP
|
INSP - Framing/Rough-in | 4/21/1999 | 4/22/1999 | 4/23/1999 | A | NR |
Carl Dependahl
|
|
|
04/22/99 340 - josh ###-####; structural framing; mst straps in at trimm
|
INSP - Foundation | 4/19/1999 | 4/19/1999 | 4/19/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - SLAB, SPEC INSP ONSITE; KEEP C/N FOR REPORTS, ETC
|
INSP - Foundation | 3/29/1999 | 3/30/1999 | 3/30/1999 | A | PART |
Carl Dependahl
|
|
|
03/30/99 340 - ###-#### JOSH//FOOTING mti onsite, keep cn pending reports
|
INSP - Foundation | 3/26/1999 | 3/26/1999 | 3/26/1999 | | PART |
Carl Dependahl
|
|
|
03/26/99 340 - josh ###-#### footing/foundation per cont, has mti onsite; pending reports...keep c/n
|
INSP - Foundation | 3/26/1999 | 3/26/1999 | 3/26/1999 | P | PART |
Carl Dependahl
|
|
|
mti onsite, keep c/n. pend spec insp report
|
INSP - Foundation | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | PART |
Carl Dependahl
|
|
|
03/25/99 340 - ###-#### JOSH//FOOTING mti onsite, keep c/n of 3-22
|
INSP - Foundation | 3/24/1999 | 3/24/1999 | 3/24/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FTGS, HAS SPEC INSP...KEEP CN OF 3-23-99; PENDING REPORT& EN
|
INSP - Foundation | 3/23/1999 | 3/24/1999 | 3/24/1999 | A | FAIL |
Wes Worcester
|
|
|
03/24/99 342 - josh ###-#### will have special inspection
|
(F) Reprint permit | | | 3/11/1999 | | |
|
|
|
|
Plan assigned to (JCM) | 1/22/1999 | | 3/10/1999 | | PASS |
John Menard
|
|
|
PLAN ASSIGNED TO JOHN MENARD AFTER MIKE PHILLIPS INDICATED HE DID NOT HAVE TIME TO DO THIS PROJECT.
|
Issue PAID IN FULL permit | | | 3/10/1999 | | |
|
|
|
|
Telephone call | | | 3/10/1999 | | PASS |
|
|
|
TALKED TO BEN JENSEN TO VERIFY PLANS ARE READY
|
Routing - PLAN CHECK | 3/10/1999 | | 3/10/1999 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/10/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/10/1999 | | |
|
|
|
|
Routing - FIRE | 3/5/1999 | | 3/9/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/3/1999 | | 3/5/1999 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/4/1999 | | PASS |
|
|
|
PLAN RESUBMITTALS REVIEWED AND APPROVED AS SUBMITTED.
|
Plan resubmittals received | | | 2/25/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A1.1, A4.0, A4.2, A5.1, A5.2, A5.3, A9.1, S2.1, S2.2 AND E-1 ONE COPY OF RESPONSE LETTER AND ONE COPY OF LETTER TO DAN JOHNSON. ROUTED TO JOHN M. KMM
|
Routing - PUBLIC WORKS | 2/1/1999 | | 2/3/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 2/1/1999 | | 2/1/1999 | | PASS |
|
|
|
PERCUP98-0134 Land division approved by Kent Brown - Record of Survey No. 3562
|
Routing - PLAN CHECK | 2/1/1999 | | 2/1/1999 | | |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/29/1999 | | FAIL |
|
|
|
planning - PW fail
|
Routing - FIRE | 1/26/1999 | | 1/29/1999 | | FAIL |
|
|
|
DAVE ABO IS READY TO SIGN OFF. PLEASE ROUTE TO HIM AFTER FIRE. KMM
|
Plan resubmittals requested | | | 1/26/1999 | | PEND |
|
|
|
COPY OF PLAN REVIEW COMMENT LIST WAS MAILED TO BEN JANSEN AT BRS REQUESTING REVISIONS TO ARCHITECTURAL AND STRUCTURAL PLAN SHEETS.
|
Routing - PLAN CHECK | 1/21/1999 | | 1/26/1999 | | PEND |
|
|
|
|
Plan assigned to (M_P) | 1/13/1999 | | 1/22/1999 | | PASS |
Mike Phillips
|
|
|
|
Routing - PLUMBING | 1/21/1999 | | 1/21/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 1/19/1999 | | 1/21/1999 | | PASS |
|
|
|
PER DRH98-0191
|
Routing - PLANNING | 1/19/1999 | | 1/20/1999 | | FAIL |
|
|
|
PER CUP98-0134. Need to prove legal land division to Kent Brown. Also pending DR approval.
|
Routing - PUBLIC WORKS | 1/14/1999 | | 1/19/1999 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. DAR 1/19/99
|
Application received | | | 1/15/1999 | | PASS |
|
|
|
RECEIVED RECORD DECLARATION FORM. KMM
|
Plan routing begun/NEW & ADDTN | | | 1/14/1999 | | |
|
|
|
|
Received Certificate of Value | | | 1/13/1999 | | PEND |
|
|
|
REQUIRES REVISED CERT. OF VALUE. APPLICANT APPLYING FOR GRADING PERMIT. KMM
|
Routing Off Site - STRUCTURAL | 1/13/1999 | | 1/13/1999 | | |
|
|
|
ENG. WILL BE DONE IN HOUSE PER JOHN M. KMM
|
Recd Pcfee & Taken To Pln CK | | | 1/13/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/13/1999 | | PASS |
|
|
|
|
Application received | | | 1/12/1999 | | PEND |
|
|
|
REQUIRES RECORD DECLARATION FORM. CONTACTED BEN JANSEN OF THIS NEED. HE WILL BE FAXING OVER. KMM
|
Plan assigned to (MYS) | 1/13/1999 | | 1/13/1998 | | PASS |
Marlene Southard
|
|
|
|