Permit NumberBLD99-00140
StatusFinaled
Name OURADA PHILIP R & VERENA AND
Site Address 7024 OVERLAND RD
Project NameECONOMY TRANSMISSION
Customer Number 
ePlanReviewNo
Description
ECONOMY TRANSMISSION * ADDITION OF A 30 FT.X 58 FT.X 19 FT. 9 INCHES AMERICAN STEEL BUILDING TWO STORIES WITH PARTS STORAGE & VEHICLE WORK AREA ON FIRST FLOOR, WITH TWO OFFICES ON SECOND FLOOR. BUILDING WILL BE CONNECTED WITH A FRAMED 3 FT. WALKWAY TO EXISTING BUILDING. The new offices are to be seperated from the rest of the building by a 1 hr occupancy seperation. The north 7 west wall of the addition are to be 1-hr f-r. w/ no openings in the west wall. No welding or use of open flame is permitted in this building. PC #047-99, DRH98-0226 ADS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes3/5/1999 9/17/1999 DONE
Permanent occupancy  7/1/1999 PASS
Perm. Occ. Cert. #7826 issued 7-1-99 to Economy Transmission for an addition.
INSP - Final6/30/19996/30/19996/30/1999PPASS
DetailsCarl Dependahl
06/30/99 340 - Joan ###-#### or ###-####-elec will be going out today an been signed off in the computer. final fire has also been finaled.
Code Occupancy Approval  6/30/1999
Final Occupancy requested by: Joan ###-####
Code Occupancy Approval  6/30/1999 PASS
SITE INSPECTION SHOWED REQUIRED PARKING IMPROVEMENTS AND LANDSCAPE BUFFER ON NORTH SIDE OF BUILDING, ALL CONDITIONS NOW MET, FINAL OCCUPANCY SIGNED OFF.
INSP - Final6/24/19996/25/19996/25/1999AFAIL
DetailsCarl Dependahl
06/25/99 340 - ###-#### keep c/n, need all other sigs...
INSP - Final6/24/19996/24/19996/24/1999 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR PERM OCC
INSP - Final6/23/19996/23/19996/23/1999 FAIL
DetailsCarl Dependahl
/ / 340 - NEED FIX HANDRAILS
INSP-Conference6/22/19996/22/19996/22/1999 PART
DetailsJoe Tawney
/ / 406 - CONF WITH JOAN; CONTR; REG OWNER OCC
INSP - Final6/9/19996/10/19996/10/1999PFAIL
DetailsCarl Dependahl
06/10/99 340 - ###-#### JOAN CALL FIRST LATE AFTERNOON PLEASE KEEP C/N
INSP - Final6/7/19996/7/19996/7/1999 FAIL
DetailsCarl Dependahl
/ / 340 - KEEPC/N,NEED ADA DOOR HDWE, ETC.CONF W/BLDR.
INSP-Conference6/4/19996/4/19996/4/1999 PART
DetailsJoe Tawney
/ / 406 - CONF W/CARL & JOAN REG OCC DESIGNATION
INSP - Final6/3/19996/3/19996/4/1999PFAIL
DetailsCarl Dependahl
06/03/99 340 - ###-#### before 3 c/n, rails, other sigs, etc.
INSP - Final6/2/19996/2/19996/2/1999 FAIL
DetailsCarl Dependahl
06/02/99 340 - ###-#### JOAN//FINAL; need other sig's
INSP - Final6/1/19996/2/19996/2/1999AFAIL
DetailsCarl Dependahl
06/02/99 340 - ###-#### JOAN//FINAL, need other sig's
INSP-Final Inspection6/2/19996/2/19996/2/1999PFAIL
DetailsJoe Tawney
06/02/99 406 - FINAL FAIL CONSTR ISSUES, DOOR HDWRE, FIRE EXT, ETC.
Code Occupancy Approval  6/2/1999
Final Occupancy requested by Joan ###-####
INSP - Framing/Rough-in5/27/19995/27/19995/27/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF W/ BLDR RE CHANGE OF STATUS FOR BAYS TO PARTS REPAIR, N
INSP - Framing/Rough-in5/14/19995/14/19995/14/1999PPART
DetailsCarl Dependahl
05/14/99 340 - ###-#### JOAN//CEILING GRID ok to place tile at hall, etc
INSP - Framing/Rough-in5/13/19995/13/19995/13/1999 PART
DetailsCarl Dependahl
/ / 340 - OK TO TILE OFFICE GRID
INSP - Framing/Rough-in5/10/19995/11/19995/11/1999APART
DetailsCarl Dependahl
05/11/99 340 - ceiling grid/ Joan ###-####; cell ###-####; ok to set til
INSP - Framing/Rough-in4/28/19994/28/19994/28/1999 PART
DetailsCarl Dependahl
/ / 340 - MEZZANINE OK TO COVER
INSP - Framing/Rough-in4/26/19994/26/19994/26/1999PPART
DetailsCarl Dependahl
04/26/99 340 - jone ###-#### reinspection; bolts, stairs ok; keep cn re
INSP - Framing/Rough-in4/22/19994/23/19994/23/1999AFAIL
DetailsCarl Dependahl
04/23/99 340 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in4/21/19994/22/19994/22/1999ANR
DetailsCarl Dependahl
04/22/99 340 - dan ###-####; structural frame; NEED OTHER R/I'S
INSP - Framing/Rough-in4/12/19994/12/19994/12/1999PPART
DetailsCarl Dependahl
04/12/99 340 - CONFERENCE Art Smith ###-####; 1st phase west firewall ok
INSP - Framing/Rough-in4/12/19994/12/19994/12/1999 PART
DetailsCarl Dependahl
/ / 340 - FIREWALL AT SO. SIDE OK TO PLATE
INSP - Framing/Rough-in4/7/19994/7/19994/7/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF RE FIREWALLS
INSP - Framing/Rough-in4/6/19994/6/19994/7/1999PPART
DetailsJim Storey
04/06/99 301 - fire assemblies ok fo 8ft on p/l wall west side.
INSP - Framing/Rough-in4/6/19994/6/19994/6/1999 PART
DetailsCarl Dependahl
/ / 340 - INT FRAMING 1HR WALLS, OK TO CONTINUE
INSP - Foundation4/5/19994/5/19994/5/1999 PART
DetailsCarl Dependahl
/ / 340 - CONF W/ 301; HE DID FND INSP, WEST WALL TO BE 1HR, NEED DETA
INSP - Foundation3/12/19993/15/19993/15/1999APART
DetailsJim Storey
03/15/99 301 - footing ok spoke w/ingineer of record he will send calcul
Issue PAID IN FULL permit  3/5/1999
Plan assigned to (ADS)1/20/1999 3/2/1999 PASS
Details
03/02/99 07:38:21 ADS - this action updated by action script from <<>> in Case No. BLD99-0140
Inspection Record Card- Bld  3/2/1999
Print Occupancy Form  3/2/1999
Telephone call  3/2/1999
PLANS/APPL TAKEN TO FRONT DESK  3/2/1999 PASS
Routing - PLAN CHECK3/2/1999 3/2/1999 PASS
Routing - FIRE3/1/1999 3/1/1999 PASS
see plan notes - no vehicles in building
Routing - PLAN CHECK2/18/1999 2/26/1999 PASS
Plan resubmittals received  2/25/1999
Routing - PLUMBING2/16/1999 2/17/1999 PASS
Routing - PUBLIC WORKS2/12/1999 2/16/1999 PASS
Routing - PLAN CHECK2/11/1999 2/12/1999
holding for resubmittals for fire, building, plumbing, public works. route to public works 2/12/99
Routing - FIRE2/10/1999 2/11/1999 FAIL
Plan Review Completed(1st rev)  2/11/1999 FAIL
ubc,plumbing,pw,fire fail
Routing - PLAN CHECK2/2/1999 2/10/1999 FAIL
asked for resubmittals 03 Feb 99. Plans with resubmittals reviewed.
Plan resubmittals requested  2/10/1999 FAIL
report mailed & faxed to applicant (builder)
Plan resubmittals received  2/9/1999
Plan resubmittals requested  2/3/1999 FAIL
spoke with builder by phone - asked for floor plans, accessible restroom, details of fire resistive west wall. Ask about use - no welding or open flame, motor vehicles will be parked in addition, asked for MSDS & quanities.
Routing - PLANNING1/28/1999 2/2/1999 PASS
Approved per DRH98-0226. DAVE RADFORD WHEN DONE WITH P & Z PLEASE TAKE PLANS TO LOUISE TO SIGN OFF. THANKYOU KATHY.
Routing - PLUMBING1/27/1999 1/28/1999 FAIL
Routing - PUBLIC WORKS1/20/1999 1/27/1999 FAIL
DOCUAMENTATION REQUIRED THAT RUN OFF WILL BE RETAINED ON SITE. JOAN PRIGGE WAS NOTIFIED. PER TERRY RECORDS. DAR 1/27/99 DAR
Plan assigned to (MYS)1/15/1999 1/20/1999
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH1/20/1999 1/20/1999
Recd Pcfee & Taken To Pln CK  1/15/1999
Application received  1/15/1999