Case Summary (BLD) | | | 7/8/2009 | | |
|
|
|
|
Case Summary (BLD) | | | 8/16/2006 | | |
|
|
|
|
Fee Review-notes | 6/20/2003 | 6/20/2003 | 6/20/2003 | | DONE |
|
|
|
|
Fee Review-notes | 4/30/1999 | | 1/28/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/5/2000 | 1/5/2000 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/5/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8069 issued 1-5-00 to Auto Trends Collision Repair Center.
|
BLD-Final | 12/28/1999 | 12/28/1999 | 12/28/1999 | A | PASS |
|
|
|
Signed ok, req cart perm.
|
BLD-Final | 11/30/1999 | 12/1/1999 | 12/1/1999 | A | FAIL |
|
|
|
###-#### allen fn Other agencies not approved. (struc. Made ok.)
|
FIRE-Final Inspection | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | PASS |
Rick Jackson
|
|
|
Occ. appr.
|
INSP-Final Inspection | 9/1/1999 | 9/1/1999 | 9/1/1999 | A | FAIL |
Rick Jackson
|
|
|
reviewed IRT dryer instalation and interlocks with Dave Miller. Unit still operated while spraying - not installed to manufacturers criteria - installer notified and unit not to be used
|
INSP-Conference | 8/30/1999 | 8/30/1999 | 8/30/1999 | A | PART |
Rick Jackson
|
|
|
received additional info on dryer - will review with Dave Miller before approval
|
INSP-Final Inspection | 7/27/1999 | 7/28/1999 | 7/28/1999 | A | PART |
Rick Jackson
|
|
|
final fire occ Rick must be here 1st Alan ###-#### temp occ approved; ETL will come in and UL list the dryer; not to use the sprayer in the prep booth
|
INSP - Final | 7/27/1999 | 7/28/1999 | 7/28/1999 | P | PART |
|
|
|
07/28/99 338 - made ok for temp c/n issued
|
INSP-Final Inspection | 7/22/1999 | 7/23/1999 | 7/23/1999 | P | FAIL |
Wes Worcester
|
|
|
07/23/99 342 - Alan ###-####
|
INSP-Final Inspection | 7/23/1999 | 7/23/1999 | 7/23/1999 | P | FAIL |
Rick Jackson
|
|
|
Alan ###-#### Alan said that he spoke with you this afternoon and that you were going to come back out this pm... I hope thats ok AJC * exit hardware; extinguishers; dryer in bay not explosion proof
|
INSP - Final | 7/22/1999 | 7/23/1999 | 7/23/1999 | P | FAIL |
Wes Worcester
|
|
|
07/23/99 342 - Alan ###-####
|
Code Occupancy Approval | | | 7/22/1999 | | |
|
|
|
temp requested by Alan Lindstrom ###-#### cell
|
Print Occupancy Form | | | 7/20/1999 | | |
|
|
|
|
INSP - Framing/Rough-in | 7/19/1999 | 7/19/1999 | 7/19/1999 | P | FAIL |
|
|
|
c/n issued
|
Plan resubmittals received | | | 6/24/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTAL FROM DALE BINNING(GAS PIPING), FORWARDED SAME TO DAVID LIGHTFOOT. DAR 6/24/99
|
SUPER- Supervisor's review | 6/15/1999 | 6/15/1999 | 6/15/1999 | | |
|
|
|
reviewd project with other supervisors and marlene in pm this will be a tenant infill permit, owner alan lunstrum agreed to pull studs out of second floor areas requiring new permit and no work or inspections will be done in that area until new permit is issued.
|
INSP-Sprinkler Rough-in/Hydro | 6/14/1999 | 6/14/1999 | 6/14/1999 | | PART |
Rick Jackson
|
|
|
/ / 409 - OKAY TO COVER OFFICE AREAS - NOT APPROVED FOR COVER ON 2ND F
|
INSP - Framing/Rough-in | 6/11/1999 | 6/11/1999 | 6/11/1999 | P | FAIL |
Wes Worcester
|
|
|
06/11/99 342 - ###-####CALL B4 rec'd after tran, not completely done wan
|
SUPER- Supervisor's review | 6/10/1999 | 6/10/1999 | 6/10/1999 | | PEND |
|
|
|
Conference on mechanical requirements.
|
SUPER- Supervisor's review | 6/10/1999 | 6/9/1999 | 6/9/1999 | | PEND |
|
|
|
Site review. 2nd floor.
|
INSP - Framing/Rough-in | 6/8/1999 | 6/9/1999 | 6/9/1999 | A | FAIL |
Wes Worcester
|
|
|
06/09/99 342 - call first ###-#### Alan
|
INSP - Framing/Rough-in | 6/3/1999 | 6/4/1999 | 6/3/1999 | A | FAIL |
|
|
|
06/04/99 338 - str corrections other agencies not approved
|
INSP - Foundation | 3/23/1999 | 3/23/1999 | 3/23/1999 | | PART |
|
|
|
03/18/99 338 - made o k with ok from 342
|
INSP-Sprinkler Rough-in/Hydro | 3/15/1999 | 3/15/1999 | 3/15/1999 | | FAIL |
Rick Jackson
|
|
|
/ / 409 - UNDERGROUND BURY INSPECTION - NOT APPROVED, NEED PLANS SHOWI
|
INSP - Foundation | 3/12/1999 | 3/15/1999 | 3/15/1999 | A | PASS |
Wes Worcester
|
|
|
03/15/99 342 - KEVIN ###-#### east and north ftn
|
(F) Reprint permit | | | 3/11/1999 | | |
|
|
|
|
Plan assigned to (MLO) | 1/21/1999 | | 3/10/1999 | | PASS |
Mike Otto
|
|
|
|
Inspection Record Card- Bld | | | 3/10/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/10/1999 | | |
|
|
|
|
Routing - FIRE | 3/10/1999 | | 3/10/1999 | | PASS |
|
|
|
approved with conditions for further submittals
|
Routing - PLAN CHECK | 3/10/1999 | | 3/10/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 3/10/1999 | | |
|
|
|
|
Print Occupancy Form | | | 3/10/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/8/1999 | | 3/10/1999 | | PASS |
|
|
|
SENDING RESUBMITTALS TO OUTSIDE ENGINEER VIA PDQ. DAR 3/8/99
|
Print Occupancy Form | | | 3/10/1999 | | |
|
|
|
|
Routing - FIRE | 3/5/1999 | | 3/9/1999 | | FAIL |
|
|
|
information provided on paint areas indicates plans as submitted will not be in compliance with NFPA 33. some appliances were mis-represented as to their listing. no response was provided to several items identified on the previous review.
|
Plan resubmittals received | | | 3/8/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM DALE BINNING. FORWARDED SAME TO MIKE OTTO. DAR 3/8/99
|
Routing - PLAN CHECK | 2/19/1999 | | 3/4/1999 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 3/4/1999 | | FAIL |
|
|
|
CORRECTIONS FAXED TO ARCHITECT. MLO
|
Routing Off Site - STRUCTURAL | 3/3/1999 | | 3/4/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE REVISED SHEETS A-7, AND A-8 OUT TO OUTSIDE ENG. PLUS CALCS. KMM
|
Plan resubmittals requested | | | 3/4/1999 | | FAIL |
|
|
|
FURTHER CORRECTIONS FROM THE STRUCTRUAL ENGINEER FAXED TO ARCHITECT. MLO
|
Plan resubmittals received | | | 3/3/1999 | | |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEETS A-7, AND A-8, AND CALCS. ROUTED TWO COPIES OF PLANS TO MIKE O. AND SENT THRID COPY OF PLANS TO OUTSIDE ENG. KMM
|
Plan resubmittals requested | | | 3/1/1999 | | FAIL |
|
|
|
STRUCTRUAL CORRECTIONS FAXED TO ARCHITECT. MLO
|
Routing Off Site - STRUCTURAL | 2/25/1999 | | 2/26/1999 | | FAIL |
|
|
|
SENT RESUBMITTALS TO STRUCTURAL ENGINEER (CONSULANT) VIA PDQ. DAR 2/25/99
|
Plan resubmittals received | | | 2/26/1999 | | PEND |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM DALE BINNING, FORWARDED TO MIKE OTTO, PLANS WERE REQUESTED BY FLOYD VARLY. DAR 2/26/99
|
Plan resubmittals received | | | 2/24/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, M-1, TWO COPIES OF CALCS. AND ONE RESPONSE LETTER FOR MIKE O. ROUTED TO MIKE O. KMM
|
Routing - FIRE | 2/12/1999 | | 2/19/1999 | | FAIL |
|
|
|
booth stuff
|
Plan Review Completed(1st rev) | | | 2/19/1999 | | FAIL |
|
|
|
ubc and ufc issues
|
Routing - PUBLIC WORKS | 2/12/1999 | | 2/12/1999 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/12/1999 | | 2/12/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/8/1999 | | 2/11/1999 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 2/11/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS M-1 ROUTED TO MIKE O. KMM
|
Plan resubmittals requested | | | 2/11/1999 | | FAIL |
|
|
|
CORRETIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Routing - PLANNING | 2/4/1999 | | 2/8/1999 | | PASS |
|
|
|
APPROVED PER DRH98-0167
|
Routing - PLUMBING | 2/2/1999 | | 2/4/1999 | | FAIL |
|
|
|
|
Meeting | | | 2/3/1999 | | PEND |
|
|
|
HAD MEETING WITH ARCHITECT AND OWNER REGARDING DESING OF BUILDING. MLO
|
Routing - PUBLIC WORKS | 1/21/1999 | | 2/2/1999 | | FAIL |
|
|
|
02-04-99 CONTACTED BY LOUISE IN P.W. THAT APPROVAL IS WITHDRAWN. PROJECT REQUIRES FURTHER REVIEW. SAND AND OIL INTERCEPTOR REQUIRED. MLO
|
Plan Reviewer's activity | | | 1/28/1999 | | |
|
|
|
ARCHITECT REQUESTED EARLY START FOUNDATION ON 01-21-99. ON 01-27-99 STILL HAVEN'T HAD GRADING AND DRAINAGE APPROVED AND RECEIVED STRUCTRUAL CORRECTIONS FROM CONSULTING ENGINEER WHICH EFFECTED FOUNDATION. BUILIDNG OFFICIAL DENIED EARLY START 1-28-99. ARCHITECT CONTACTED MLO.
|
Plan resubmittals requested | | | 1/28/1999 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS FAXED AND MAILED TO ARCHITECT. MLO
|
Routing Off Site - STRUCTURAL | 1/21/1999 | | 1/27/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS OUT TO OUTSIDE ENG. PER JOHN M
|
Plan assigned to (MYS) | 1/20/1999 | | 1/21/1999 | | PASS |
Marlene Southard
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/21/1999 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/20/1999 | | |
|
|
|
|
Application received | | | 1/20/1999 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/20/1999 | | PASS |
|
|
|
|
Received Certificate of Value | | | 1/20/1999 | | PASS |
|
|
|
|