Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-00184
StatusFinaled
Name ALAN LINDSTROM
Site Address 308 S 24TH ST
Project NameAUTO TRENDS
Customer Number 
ePlanReviewNo
Description
AUTO TRENDS COLLISION REPAIR CENTER * TO CONSTRUCT A 17,740 SQ. FT. ONE STORY WITH A 1809 SQ. FT. MEZZANINE, TYPE III-N, FULLY FIRE SPRINKLERED AUTO BODY SHOP WITH OFFICES AND STORE ROOMS. EXTERIOR WALLS TO BE MASONRY WITH STEEL ROOF DECK AND TRUSSES. INTEROIR FRAMING IS WOOD JOIST AND STUD. OCCUPANT LOAD OF MEZZNAINE NOT TO EXCEED 11 PER APPROVED PLANS. DRH98-0167 PC#056-99 GRADING PERMIT BLD99-O190. FIRE SPRINKLERS USED FOR AREA. NO FUTURE OPENINGS IN EXTERIOR WALLS APPROVED PER THIS PERMIT.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/8/2009  
Case Summary (BLD)  8/16/2006  
Fee Review-notes6/20/20036/20/20036/20/2003 DONE
Fee Review-notes4/30/1999 1/28/2000 DONE
Permanent Occupancy 1/5/20001/5/2000 DONE
Details
Permanent occupancy  1/5/2000 DONE
Perm. Occ. Cert. #8069 issued 1-5-00 to Auto Trends Collision Repair Center.
BLD-Final12/28/199912/28/199912/28/1999APASS
Details
Signed ok, req cart perm.
BLD-Final11/30/199912/1/199912/1/1999AFAIL
Details
###-#### allen fn Other agencies not approved. (struc. Made ok.)
FIRE-Final Inspection11/2/199911/2/199911/2/1999PPASS
DetailsRick Jackson
Occ. appr.
INSP-Final Inspection9/1/19999/1/19999/1/1999AFAIL
DetailsRick Jackson
reviewed IRT dryer instalation and interlocks with Dave Miller. Unit still operated while spraying - not installed to manufacturers criteria - installer notified and unit not to be used
INSP-Conference8/30/19998/30/19998/30/1999APART
DetailsRick Jackson
received additional info on dryer - will review with Dave Miller before approval
INSP-Final Inspection7/27/19997/28/19997/28/1999APART
DetailsRick Jackson
final fire occ Rick must be here 1st Alan ###-#### temp occ approved; ETL will come in and UL list the dryer; not to use the sprayer in the prep booth
INSP - Final7/27/19997/28/19997/28/1999PPART
Details
07/28/99 338 - made ok for temp c/n issued
INSP-Final Inspection7/22/19997/23/19997/23/1999PFAIL
DetailsWes Worcester
07/23/99 342 - Alan ###-####
INSP-Final Inspection7/23/19997/23/19997/23/1999PFAIL
DetailsRick Jackson
Alan ###-#### Alan said that he spoke with you this afternoon and that you were going to come back out this pm... I hope thats ok AJC * exit hardware; extinguishers; dryer in bay not explosion proof
INSP - Final7/22/19997/23/19997/23/1999PFAIL
DetailsWes Worcester
07/23/99 342 - Alan ###-####
Code Occupancy Approval  7/22/1999
temp requested by Alan Lindstrom ###-#### cell
Print Occupancy Form  7/20/1999
INSP - Framing/Rough-in7/19/19997/19/19997/19/1999PFAIL
Details
c/n issued
Plan resubmittals received  6/24/1999 PEND
RECEIVED PLAN RESUBMITTAL FROM DALE BINNING(GAS PIPING), FORWARDED SAME TO DAVID LIGHTFOOT. DAR 6/24/99
SUPER- Supervisor's review6/15/19996/15/19996/15/1999
reviewd project with other supervisors and marlene in pm this will be a tenant infill permit, owner alan lunstrum agreed to pull studs out of second floor areas requiring new permit and no work or inspections will be done in that area until new permit is issued.
INSP-Sprinkler Rough-in/Hydro6/14/19996/14/19996/14/1999 PART
DetailsRick Jackson
/ / 409 - OKAY TO COVER OFFICE AREAS - NOT APPROVED FOR COVER ON 2ND F
INSP - Framing/Rough-in6/11/19996/11/19996/11/1999PFAIL
DetailsWes Worcester
06/11/99 342 - ###-####CALL B4 rec'd after tran, not completely done wan
SUPER- Supervisor's review6/10/19996/10/19996/10/1999 PEND
Conference on mechanical requirements.
SUPER- Supervisor's review6/10/19996/9/19996/9/1999 PEND
Site review. 2nd floor.
INSP - Framing/Rough-in6/8/19996/9/19996/9/1999AFAIL
DetailsWes Worcester
06/09/99 342 - call first ###-#### Alan
INSP - Framing/Rough-in6/3/19996/4/19996/3/1999AFAIL
Details
06/04/99 338 - str corrections other agencies not approved
INSP - Foundation3/23/19993/23/19993/23/1999 PART
Details
03/18/99 338 - made o k with ok from 342
INSP-Sprinkler Rough-in/Hydro3/15/19993/15/19993/15/1999 FAIL
DetailsRick Jackson
/ / 409 - UNDERGROUND BURY INSPECTION - NOT APPROVED, NEED PLANS SHOWI
INSP - Foundation3/12/19993/15/19993/15/1999APASS
DetailsWes Worcester
03/15/99 342 - KEVIN ###-#### east and north ftn
(F) Reprint permit  3/11/1999
Plan assigned to (MLO)1/21/1999 3/10/1999 PASS
DetailsMike Otto
Inspection Record Card- Bld  3/10/1999
Issue PAID IN FULL permit  3/10/1999
Routing - FIRE3/10/1999 3/10/1999 PASS
approved with conditions for further submittals
Routing - PLAN CHECK3/10/1999 3/10/1999 PASS
Inspection Record Card- Bld  3/10/1999
Print Occupancy Form  3/10/1999
PLANS/APPL TAKEN TO FRONT DESK  3/10/1999 PASS
Routing Off Site - STRUCTURAL3/8/1999 3/10/1999 PASS
SENDING RESUBMITTALS TO OUTSIDE ENGINEER VIA PDQ. DAR 3/8/99
Print Occupancy Form  3/10/1999
Routing - FIRE3/5/1999 3/9/1999 FAIL
information provided on paint areas indicates plans as submitted will not be in compliance with NFPA 33. some appliances were mis-represented as to their listing. no response was provided to several items identified on the previous review.
Plan resubmittals received  3/8/1999 PEND
RECEIVED PLAN RESUBMITTALS FROM DALE BINNING. FORWARDED SAME TO MIKE OTTO. DAR 3/8/99
Routing - PLAN CHECK2/19/1999 3/4/1999 FAIL
Plan resubmittals requested  3/4/1999 FAIL
CORRECTIONS FAXED TO ARCHITECT. MLO
Routing Off Site - STRUCTURAL3/3/1999 3/4/1999 FAIL
CONTACTED PDQ TO TAKE REVISED SHEETS A-7, AND A-8 OUT TO OUTSIDE ENG. PLUS CALCS. KMM
Plan resubmittals requested  3/4/1999 FAIL
FURTHER CORRECTIONS FROM THE STRUCTRUAL ENGINEER FAXED TO ARCHITECT. MLO
Plan resubmittals received  3/3/1999
RECEIVED THREE COPIES OF REVISED SHEETS A-7, AND A-8, AND CALCS. ROUTED TWO COPIES OF PLANS TO MIKE O. AND SENT THRID COPY OF PLANS TO OUTSIDE ENG. KMM
Plan resubmittals requested  3/1/1999 FAIL
STRUCTRUAL CORRECTIONS FAXED TO ARCHITECT. MLO
Routing Off Site - STRUCTURAL2/25/1999 2/26/1999 FAIL
SENT RESUBMITTALS TO STRUCTURAL ENGINEER (CONSULANT) VIA PDQ. DAR 2/25/99
Plan resubmittals received  2/26/1999 PEND
PLAN RESUBMITTALS RECEIVED FROM DALE BINNING, FORWARDED TO MIKE OTTO, PLANS WERE REQUESTED BY FLOYD VARLY. DAR 2/26/99
Plan resubmittals received  2/24/1999
RECEIVED TWO COPIES OF REVISED SHEETS A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, M-1, TWO COPIES OF CALCS. AND ONE RESPONSE LETTER FOR MIKE O. ROUTED TO MIKE O. KMM
Routing - FIRE2/12/1999 2/19/1999 FAIL
booth stuff
Plan Review Completed(1st rev)  2/19/1999 FAIL
ubc and ufc issues
Routing - PUBLIC WORKS2/12/1999 2/12/1999 PASS
Routing - PLUMBING2/12/1999 2/12/1999 PASS
Routing - PLAN CHECK2/8/1999 2/11/1999 FAIL
Plan resubmittals received  2/11/1999
RECEIVED TWO COPIES OF REVISED SHEETS M-1 ROUTED TO MIKE O. KMM
Plan resubmittals requested  2/11/1999 FAIL
CORRETIONS MAILED AND FAXED TO ARCHITECT. MLO
Routing - PLANNING2/4/1999 2/8/1999 PASS
APPROVED PER DRH98-0167
Routing - PLUMBING2/2/1999 2/4/1999 FAIL
Meeting  2/3/1999 PEND
HAD MEETING WITH ARCHITECT AND OWNER REGARDING DESING OF BUILDING. MLO
Routing - PUBLIC WORKS1/21/1999 2/2/1999 FAIL
02-04-99 CONTACTED BY LOUISE IN P.W. THAT APPROVAL IS WITHDRAWN. PROJECT REQUIRES FURTHER REVIEW. SAND AND OIL INTERCEPTOR REQUIRED. MLO
Plan Reviewer's activity  1/28/1999
ARCHITECT REQUESTED EARLY START FOUNDATION ON 01-21-99. ON 01-27-99 STILL HAVEN'T HAD GRADING AND DRAINAGE APPROVED AND RECEIVED STRUCTRUAL CORRECTIONS FROM CONSULTING ENGINEER WHICH EFFECTED FOUNDATION. BUILIDNG OFFICIAL DENIED EARLY START 1-28-99. ARCHITECT CONTACTED MLO.
Plan resubmittals requested  1/28/1999 FAIL
STRUCTURAL CORRECTIONS FAXED AND MAILED TO ARCHITECT. MLO
Routing Off Site - STRUCTURAL1/21/1999 1/27/1999 FAIL
CONTACTED PDQ TO TAKE PLANS OUT TO OUTSIDE ENG. PER JOHN M
Plan assigned to (MYS)1/20/1999 1/21/1999 PASS
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN  1/21/1999 PASS
Recd Pcfee & Taken To Pln CK  1/20/1999
Application received  1/20/1999 PASS
Plans ACCEPTED BY PLAN TECH  1/20/1999 PASS
Received Certificate of Value  1/20/1999 PASS