Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-00199
StatusFinaled
Name MICRON TECH
Site Address 8000 S FEDERAL WAY
Project NameMIC #1 (FAB 1X)
Customer Number 
ePlanReviewNo
Description
MICRON BUILDING #1 (FAB 1X) FIX, EXTEND VERTICAL FURNACE BAYS (PROJECT #01-982441) TO DEMO AND REMOVE THE WALL AND DOORS SEPERATING THE VERTICAL BAY AREAS AND MAINTENANCE CORRIDOR 102E; AND TO EXTEND THE FABRICATION VERITCAL BAY AREAS APPROXIMATELY 10 FEET TO THE NORTH, TO THE SOUTH WALL OF EXIT CORRIDOR 100B. THIS WORK IS BEING DONE BETWEEN GRID LINES C.9 & K. THIS PERMIT ALSO INCLUDES THE DEMO AND RELOCATION OF EXIT DOOR #112 BETWEEN FAB CORRIDOR 102A AND EXIT CORRIDOR 100E. AS WELL AS, THE INSTALLATION OF A NEW AUTOMATIC SLIDING, BREAKAWAY EXIT DOOR AT THE SOUTH WALL OF VERTICAL BAY #3 (104C). ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. PC#059-99/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  10/9/2000 DONE
Letter of Compliance #19918 issued.
FIRE-Final Inspection9/20/20009/21/20009/21/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/20/2000 at 07:30:28. Contact: ###-####.
BLD-Final9/20/20009/21/20009/21/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 07:32:17. Contact: ###-####.
FIRE-Final Inspection8/23/20008/28/20008/28/2000AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/23/2000 at 07:45:30. Contact: ###-####.
BLD-Final8/23/20008/24/20008/24/2000ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/23/2000 at 07:45:55. Contact: ###-####.This needs to go to jim301. 8/25/2000 9:45:57 AM
FIRE-Final Inspection1/12/20001/13/20001/13/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/12/2000 at 15:49:24. Contact: ###-####. Sprinkler spacing. 1/14/00 2:37:10 PM
Receive PAYMENT IN FULL  12/15/1999 DONE
Fee Review-notes10/29/199910/29/199910/29/1999 DONE
CHANGE STATUS TO (F)  10/29/1999 DONE
additional values from sub
Receive PAYMENT IN FULL  6/1/1999
INSP - Framing/Rough-in3/17/19993/18/19993/18/1999APASS
DetailsJim Storey
03/18/99 301 - FRST-OPENING PROTECTION OK
INSP - Framing/Rough-in3/10/19993/11/19993/11/1999APASS
DetailsJim Storey
03/11/99 301 - FRAM-OK FRAMING
Issue & PRINT FEE-DUE permit  2/10/1999
Print Occupancy Form  2/8/1999
Inspection Record Card- Bld  2/8/1999
Telephone call  2/8/1999
CALLED PERMIT READY left message
Plan assigned to (JCM)1/22/1999 2/5/1999 PASS
DetailsJohn Menard
Routing - FIRE2/4/1999 2/5/1999 PASS
Plan Review Completed(1st rev)  2/5/1999 PASS
Routing - PLAN CHECK2/5/1999 2/5/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/5/1999 PASS
Plan Reviewer's activity  2/4/1999 PASS
PLANS REVIEWED AND APPROVED AS SUBMITTED WITH ATTACHED COMMENT LIST.
Routing - PLAN CHECK2/1/1999 2/4/1999 PASS
Routing - PUBLIC WORKS1/29/1999 1/29/1999 PASS
Plans ACCEPTED BY PLAN TECH  1/28/1999 PASS
Sheets A3.2 and A9.2 signed by Dave White.
CHANGE STATUS TO (P)  1/22/1999
Application received  1/22/1999 PASS
Plan assigned to (MYS)1/22/1999 1/22/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  1/22/1999
Received Certificate of Value  1/22/1999 PASS
Plans ACCEPTED BY PLAN TECH  1/22/1999 PEND
CONTACTED DAVE WHITE TO LET HIM KNOW THAT SHEET A3.2 AND SHEET A9.1 ON ISSUE COPY NEED TO BE SIGNED. KMM
Issue & PRINT FEE-DUE permit  1/22/1999
CHANGE STATUS TO (I)