Permit Information
Permit NumberBLD99-00224
StatusFinaled
Name A T & T
Site Address 619 W BANNOCK ST
Project NameAT&T BUILDING-1ST FL
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A HOUR HOUROCCUPANCY SEPARATION WALL AROUND A 96 SQ. FT. AREA TO CREATE THE FIRE COMMAND CENTER ROOM FOR PLACEMENT OF ALL ALARM PANELS, SUPERVISORY PANELS, FLOOR LAYOUT MAPS, ETC. REQUIRED AS A CONDITION OF THE 1992 LETTER OF AGREEMENT ON FILE AS A RESULT OF THE EXISTING STRUCTURE BEING RECLASSIFIED AS AN EXISTING HIGH RISE STRUCTURE WITH AN OFFICE FLOOR LOCATED GREATER THAN 75 FEET ABOVE THE GROUND. RESUBMITTALS WERE RECEIVED MARCH 4, 1999 SHOWING CORRECTIONS FOR THE COMMAND CENTER AND ALSO INCLUDED THE LOCATIONS OF THE 1-HOUR OCCUPANCY SEPARATION WALLS REQUIRED BETWEEN THE SPRINKLED AND NON SPRINKLED AREAS AS DESIGNATED BY SMALL PLANS ATTACHED TO FRONT. ALSO INCLUDES A DOOR UPGRADE FOR THE SEPARATIONS AND WILL REQUIRE REVIEW OF ALL DUCT PENETRATIONS OF THE OCCUPANCY SEPARATION WALLS TO VERIFY FIRE DAMPERS (1991 UBC) AND ACCESS DOORS. tHE COMPLETION OF THE ABOVE NOTED ITEMS IN CONJUNCTION WITH THE ALARM, DETECTION SPRINKLER & TESTING FOR APPROVAL OF ALL THESE ITEMS WILL RESULT IN THE ISSUANCE OF A "LETTER OF COMPLETION / COMPLIANCE" TO THE TENANT'S, A.T.&T. AND U.S.WEST, FOR THE CONDITIONS OF THE 1992 "LETTER OF AGREEMENT". ALL PER APPROVED PLANS NOTES AND ATTACHMENTS. PC#99-068/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/17/20005/18/20005/18/2000APASS
Details
###-#### c/c# 19339 5/19/00 8:29:55 AM
FIRE-Final Inspection5/17/20005/18/20005/18/2000APASS
DetailsRick Jackson
###-####
Letter of compliance  5/18/2000 PASS
Letter of Compliance #19339 issued 5-18-00.
BLD-Final1/6/20001/7/20001/7/2000AFAIL
Details
JERRY FISHER ###-#### FN OCC WITH 409 AND ALL CONTRACTORS
FIRE-Final Inspection1/6/20001/7/20001/7/2000AFAIL
DetailsRick Jackson
JERRY ###-#### FIRE FN. Doors not operational/ installed as required per plans.
Fee Review-notes6/21/1999 6/21/1999 DONE
INSP-Alarm Testing5/20/19995/20/19995/20/1999PFAIL
DetailsRick Jackson
audibility poor in 1st floor; pressurization fans not working properly;
INSP-Alarm Testing5/18/19995/18/19995/18/1999PFAIL
DetailsRick Jackson
alarms not complete -
INSP - Framing/Rough-in4/22/19994/22/19994/22/1999PPART
Details
04/26/99 338 - made ok to install door at the fire room
Issue PAID IN FULL permit  3/8/1999
Print Occupancy Form  3/8/1999
Telephone call  3/8/1999
talked to bob gave dollar amount
Plan assigned to (DRS)1/27/1999 3/5/1999 PASS
DetailsDan Stuart
03/05/99 21:03:58 DRS - this action updated by action script from <<>> in Case No. BLD99-0224
Telephone call  3/5/1999
Call from Steve of H&L Architects to verify that I will send list of doors needing to be corrected to H&L Arch.
Print Pending Permit.LaserJet4  3/5/1999 PASS
Processing for issuance of a permit.
Telephone call  3/5/1999
Call from Steve Dunbar from H&L Architect to check on my review of the door analysis they had done for the building and to fax information to him noting which particular doors would be required to be upgraded as part of the 1992 "Letter of Agreement". I completed by review and faxed a copy to him at approximately 6:30 P>M> on Friday night. I will attach a copy to each set of plans and move forward to issue permit.
Routing - PLAN CHECK3/4/1999 3/5/1999 PASS
Met with Jim Hernandez & John Hughes of AT&T & H&L Architects to review their resubmittals, disciver any deficiencies and to move forward with issuaing a permit. Floyd Varley accepted resubmittals for alarms, detection & sprinklers and I reviewed the plans for doors, fire walls and protection of openings and penetrations with the understanding that even if not complete on resubmittals, I would redline the plans with requirements to be met and Jim Hernandex, AT&T Bulding Engineer would see the items were completed. I have put notes & comments together on plans and am prepared to process for issuance of permit.
PLANS/APPL TAKEN TO FRONT DESK  3/5/1999 PASS
Routing to permit desk for processing. desk
Meeting  3/4/1999
Meeting with Floyd Varley, Jim Hernandez (AT&T Building Engineer), John Hughes (Architect w/ H&L)and Dan Stuart. New plans & submittals were brought to the meeting by the architect along with responses to previous plan review comments of 9/30/98, 2/2/99 & 3/4/99 for Fire Dept. & 2/11/99 of Bulding Plans Corrections list. We reviewed each item still open on the proposed Fire Command Center project for which this permit was applied for as well as all outstanding questions having to do with the 1992 agreement letter for required modifications to the facility because of the new office occuapncy located more than 75 feet above grade causing this facility to be reclassified as an exisitng high rise. The sprinkler system, smoke detection, alarms, 1-hour occupancy separation walls with 1-hour protected opening for doors and ducts and penetrations that separates the sprinkled areas from the nonsprinkled telecommunications equipment rooms, pressurization of the center and East stair enclosures and the exit system serving the 6th floor offices (to include rated doors to the enclosures and into the enclosure extension located on the first floor) were reviewed item by item. The resubmitted plans did not indicate if fire dampers were/are present at all ducts penetrating the one-hour occupancy separation walls required under the 1992 agreement. I will make this requirement noted on the plans as well as mark the specific walls as designated on the small set of plans submitted to show locations. The fire & structural inspectors will verify compliance with the 1991 UBC for these areas as agreed. Floyd has verbally accepted information as showing compliance with Fire Code review and will approve plans for permit issuance. I will check the doors presented as to current ratings & proposed upgrades and let H&L Architects know what doors are speciffically part of the 1992 upgrade agreement.
Routing - FIRE3/4/1999 3/4/1999 PASS
approved as noted on plans provided this date by ATT and Cator Ruma
Plan resubmittals received  3/4/1999
Received answers to all requests and a verbal agreement from Mr. Hernandez & Mr. Hughes to complete the project per notes & attachments we put on plans to help clarify if we will move forward with issuing the permit. Floyd and I agreed we could work with them based on the new information reveived.
Plan resubmittals requested  2/11/1999 PARK
PLAN REVIEW COMPLETED WITH FAX AND LETTER TO ARCHITECT SCOTT KEUHN AND AT&T PROJECT MANAGER JIM HERNANDEZ.
Plan Reviewer's activity  2/11/1999
REVIEWED PLANS WITH FLOYD AND THE INABILITY TO GET COMPLETE PLANS AS REQUESTED AMNY TIMES OVER IN RELATION TO THE 1992 LETTER UPGRADE AGREEMENT WITH AT&T & US WEST AND THE CITY BUILDING & FIRE DEPARTMENTS. THE FIRE COMMAND CENTER IS PART OF THE AGREEMENT AS WELL AS THOSE ITEMS NOTED CONCERNIGN FIRE SEPARATION WALLS, SMOKE DETECTION, ALARMS & SPRINKLER SYSTEM PLANS FOR APPROVAL TO ISSUE A PERMIT. WE CONTINUOUSLY GET ONLY PARTIAL PLANS WITHOUT THE INFORMATION REQUESTED AND ASSURED WE WOULD GET EACH TIME THE PARTIES COMNE TO THE CITY TO SEEK TO GET OUT OF SOME REQUIREMENT OR CONFUSE AN ISSUE BY STATING WE KEEP CHANGING REQUIRMENTS. AFTER WE ONCE AGAIN READ THE AGREEMENT AND CODE APPLICABLE TO SHOW THAT WE HAVE NOT CHANGED BUT THEY HAVE NOT READ THE REQUIREMENTS, THEY LEAVE STATING WE WILL HAVE WHAT IS NEEDED ASAP. THIS HASN'T HAPPENDED YET. NOT
Routing - PLAN CHECK2/9/1999 2/11/1999 PARK
I GAVE A SET OF PLANS TO FLOYD TO REVIEW BASED ON A CONVERSATION HE HAD WITH MR. HUGHES WHILE I REVIEWED THE OTHER. THE PLANS DO NOT PROVIDE THE INFORMATION REQYUIRED IN A JANUARY 6, 1999 MEETING WE HELD WITH PROJECT REPS, FLOYD & MYSELF TO TRY AND GET THE FINAL PROCESS UNDERWAY. PLANS ARE PARKED BEHIND MY DESK UNTIL RESUBMITTALS ARE RECEIVED.
Routing - FIRE2/9/1999 2/10/1999 FAIL
PLANS BACK TO PLAN REVIEW TO HOLD UNTIL SUBMITTAL REQUIRED ARE SUBMITTED.
Routing - PLAN CHECK2/2/1999 2/8/1999
PICKED UP PLANS TO BEGIN REVIEW.
Routing - FIRE1/27/1999 2/2/1999 FAIL
alarm plans do not meet the requirements of the 1992 agreement or corrections required of the 9/98 review of the fire alarm system.
Plan assigned to (MYS)1/26/1999 1/27/1999
DetailsMarlene Southard
Plan routing begun/TENANTS  1/27/1999
Route to FIRE and PLAN CHECK.
Application received  1/26/1999 PASS
Received Certificate of Value  1/26/1999 PASS
Plans ACCEPTED BY PLAN TECH  1/26/1999 PASS
Recd Pcfee & Taken To Pln CK  1/26/1999