MCMILLAN ELEMENTARY SCHOOL * TO CONSTRUCT A 7894 FT. CLASSROOM ADDITION TO AN EXISTING ELEMENTARY SCHOOL BUILDING. CONSTRUCTION TO BE TYPE V-1HR WITH MASONRY EXTERIOR WALLS WITH A TWO-HOUR AREA SEPARATION WALL TO THE EXISTING BUIDLING. THE NEW ADDITION INCLUDES FIVE CLASSROOMS WITH EXTERIOR EXIT DOORS, TWO STUDENT TOILET ROOMS, STORAGE AND A JANITOR'S ROOM. CUP98-0156 PC#077-99 THIS ADDITION IS NOT FIRE SPRINKLERED.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/19/20036/19/20036/19/2003 DONE
Permanent occupancy  10/4/2001 DONE
Perm. Occ. Cert. #8855 issued 10-4-01 to McMillan Elementary School for a classroom addn.
Permanent Occupancy 9/20/20019/20/2001 DONE
Details
BLD-Final9/17/20019/17/20019/17/2001PPASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/17/2001 1:17:33 PM Reinsp OK for permanant occupancy
Code Occupancy Approval  1/20/2000 PASS
Sod in - meets compliance with CUP98-0156
FIRE-Conference1/18/20001/19/20001/19/2000AFAIL
DetailsJoe Tawney
PER JOE 8:30 --KATE --###-#### WALK THROUGH Reinsp. fail; smoke detector & horn strobe. 1/20/00 9:11:36 AM
Fee Review-notes4/22/1999 11/22/1999 DONE
BLD-Final9/15/19999/15/19999/15/1999 PART
ADD INSPCTN PER 408 - REINSPECTION - OK FOR TEMP OCC
Temporary occupancy  9/15/1999 PART
Temp. Occ. Cert. #3921 issued 9-15-99 to McMillan Elementrary School.
INSP - Final9/13/19999/14/19999/14/1999ACANC
DetailsAlan Hauser
RECALLED FOR PM
FIRE-Final Inspection9/14/19999/14/19999/14/1999PPART
DetailsJoe Tawney
FINALOK FOR TEMP OCC C/N ISSUED
INSP - Final9/13/19999/13/19999/13/1999PFAIL
DetailsTom Arcoraci
WILL RECALL FOR 9-14-99
INSP - Framing/Rough-in9/2/19999/3/19999/3/1999PPASS
DetailsTom Arcoraci
09/03/99 408 - ###-#### RICK. 1ST THING IN THE AM.
INSP - Framing/Rough-in8/23/19998/23/19998/23/1999PFAIL
DetailsWes Worcester
08/23/99 342 - need installation criteria and lights installed to ck wir
INSP - Wall cover8/6/19998/6/19998/6/1999PFAIL
DetailsTom Arcoraci
08/06/99 408 - cn issued
SUPER- Supervisor's review7/30/19997/30/19997/30/1999 PEND
Discussed and approved,with field inspector and contractor, a method of maintaining the 2hr construction requirements of an area separation wall.
INSP - Wall cover7/30/19997/30/19997/30/1999AFAIL
DetailsTom Arcoraci
bob and myself met with contractor on 2 hr area sep wall construction
SUPER- Supervisor's review7/15/19997/15/19997/15/1999 PEND
Requirements of 2hr wall.
INSP - Wall cover7/14/19997/15/19997/15/1999AFAIL
DetailsTom Arcoraci
07/15/99 408 - AREA SEP WALL NOT IN COMP
INSP - Framing/Rough-in7/2/19997/2/19997/2/1999PPART
DetailsTom Arcoraci
rick ###-#### ok to roof
INSP - Wall cover6/29/19996/29/19996/29/1999 PART
DetailsTom Arcoraci
/ / 408 - CONFERENCE
INSP - Foundation4/14/19994/15/19994/15/1999APART
DetailsTom Arcoraci
04/15/99 408 - FOUNDATION WALL / RICK ###-####
INSP - Framing/Rough-in4/15/19994/15/19994/15/1999 FAIL
DetailsTom Arcoraci
/ / 408 - MUST PROVIED LISTED ASSEMBLYS FOR 1 HR WALL ECT TO PLAN REVE
INSP - Foundation4/12/19994/13/19994/13/1999APART
DetailsTom Arcoraci
04/13/99 408 - ###-#### RICK//FOOTING ASAP PLEASE
Issue PAID IN FULL permit  3/22/1999
Telephone call  3/19/1999 PASS
talked to scott to verify plans are ready
Print Occupancy Form  3/19/1999
Inspection Record Card- Bld  3/19/1999
PLANS/APPL TAKEN TO FRONT DESK  3/18/1999 PASS
Plan assigned to (MLO)1/29/1999 3/18/1999 PASS
DetailsMike Otto
Plan resubmittals received  3/18/1999 FAIL
STRUCTRUAL RESUBMITTALS RECEIVED. MLO
Routing Off Site - STRUCTURAL3/18/1999 3/18/1999 PASS
CALCULATIONS FAXED TO ENGINEER. MLO
Routing Off Site - STRUCTURAL3/5/1999 3/17/1999 FAIL
SENT RESUBMITTALS TO OUTSIDE ENGINEERING VIA PDQ. DAR 3/5/99
Plan resubmittals requested  3/17/1999 FAIL
STRUCTRUAL CORRECTIONS MAILED AND FAXED TO ARHCITECT. MLO
Routing - FIRE3/4/1999 3/8/1999 PASS
ALARM PLANS REQUIRED
Plan Review Completed(1st rev)  3/8/1999 PASS
Plan resubmittals received  3/4/1999
RECEIVED THREE COPIES OF REVISED SHEETS 7 AND 8. TWO COPIES OF ADDITIONAL CALULATIONS AND TWO COPIES OF LINE ITEM WRITTEN RESPONSE. ROUTED TO MIKE O. KMM
Routing - PLAN CHECK2/12/1999 3/3/1999 PASS
Plan resubmittals requested  3/1/1999 FAIL
STRUCTURAL CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
Routing Off Site - STRUCTURAL1/29/1999 2/24/1999 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Routing - PUBLIC WORKS2/10/1999 2/12/1999 PASS
Routing - PLANNING2/8/1999 2/9/1999 PASS
PER CUP98-0156
Routing - PUBLIC WORKS1/29/1999 2/4/1999 FAIL
RREQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. DAR 2/4/99 BM CONTACTED KENT KROHN @ 11:30 2/1/99.
Plan routing begun/NEW & ADDTN1/29/1999 1/29/1999
Plans ACCEPTED BY PLAN TECH  1/29/1999 PASS
Plan assigned to (MYS)1/28/1999 1/29/1999
DetailsMarlene Southard
Received Certificate of Value1/29/1999 1/29/1999 PASS
Application received  1/28/1999 PASS
Recd Pcfee & Taken To Pln CK  1/28/1999