BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PASS |
Carl Dependahl
|
|
|
FN OCC -BOB-- ###-####
|
BLD-Energy code compliance | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | PASS |
Tom Arcoraci
|
|
|
BOB---- ###-#### ENERGY CODE Framing ok. 1/20/00 4:17:22 PM
|
BLD-Energy code compliance | 1/18/2000 | 1/19/2000 | 1/19/2000 | P | FAIL |
Wes Worcester
|
|
|
bob-- ###-#### energy code Still insulating. 1/20/00 9:21:24 AM
|
BLD-Framing/Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | FAIL |
Wes Worcester
|
|
|
BOB--- ###-#### RE-INSP FR Insulating- w/blown in- unable to access. Recall w/insulation inspection 1/19/00. 1/19/00 1:35:29 PM
|
BLD-Framing/Rough-in | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | FAIL |
Carl Dependahl
|
|
|
342's area, took for Russ.. Part insp. only C/N; ok to insul.
|
BLD-Framing/Rough-in | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | PART |
Wes Worcester
|
|
|
shear wall bob ###-#### please call when your on your way Shear only O/C.
|
INSP - Foundation | 8/9/1999 | 8/10/1999 | 8/9/1999 | A | PASS |
Wes Worcester
|
|
|
08/10/99 342 - BRAD ###-#### MID MORNING PLEASE
|
INSP - Foundation | 8/3/1999 | 8/4/1999 | 8/4/1999 | A | PART |
Wes Worcester
|
|
|
08/04/99 342 -
|
INSP - Foundation | 7/28/1999 | 7/29/1999 | 7/29/1999 | A | PASS |
Wes Worcester
|
|
|
07/29/99 342 - REbar pump order for 11am bob ###-#### (bob will try to connect mid morning
|
INSP - Foundation | 7/20/1999 | 7/21/1999 | 7/21/1999 | P | PASS |
Wes Worcester
|
|
|
07/21/99 342 - FOOTING BRAD ###-#### AROUND 2:00
|
INSP - Concrete | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PART |
Wes Worcester
|
|
|
06/16/99 342 - spec insp doing slump & air,eng & spec insp reports to be
|
INSP - Concrete | 6/15/1999 | 6/15/1999 | 6/15/1999 | | FAIL |
Wes Worcester
|
|
|
06/15/99 342 - after 10am Bob ###-#### rebar not in place, eng to addrte
|
INSP - Concrete | 6/14/1999 | 6/15/1999 | 6/15/1999 | A | FAIL |
Wes Worcester
|
|
|
06/16/99 342 - after 10am Bob ###-####
|
INSP - Foundation | 5/28/1999 | 6/1/1999 | 6/1/1999 | P | FAIL |
Wes Worcester
|
|
|
06/01/99 342 - ###-#### BOB//INTERIOR FOOTING need compaction report
|
INSP - Foundation | 5/24/1999 | 5/25/1999 | 5/25/1999 | A | PART |
Wes Worcester
|
|
|
05/25/99 342 - ###-#### BOB//FOOTING REINSPECTION
|
INSP - Foundation | 5/21/1999 | 5/24/1999 | 5/24/1999 | A | FAIL |
Wes Worcester
|
|
|
05/24/99 342 - ###-#### need special inspection, eng's letter/detail, mo
|
Print Occupancy Form | | | 4/26/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/26/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/26/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/26/1999 | | PASS |
|
|
|
addendum from douglas unger 04/20/99 specify that shear and moment frame & alternate panel design were designed to include oversize room (sec. 2320.5.1) engineering indicates hd5a holdowns in 7 areas at north/south walls and 14 at east/west walls. mr. unger states that holdowns indicated on plans are adequate to develop shear for this structure.
|
Plan assigned to (DJO) | 1/29/1999 | | 4/26/1999 | | PASS |
Dan Overy
|
|
|
04/26/99 10:48:28 DJO - this action updated by action script from <<>> in Case No. BLD99-0270
|
Plan Reviewer's activity | | | 4/23/1999 | | PEND |
|
|
|
04/22/99 bob britton dropped off information and calculations for reward system engineered by edwards & cummings. addendums from douglas unger reqarding structural engineering, address 2x6 tall walls and shear indicated on plans. oversize room does not seem to have been looked at or at least no mention of it in any calcs. also need to have holdowns verified by engineer as what is called out in his calcs is not indicated on plans. called ungers approxiametly sometime after 10 a.m. left message.
|
Telephone call | | | 4/16/1999 | | PEND |
|
|
|
spoke with prestige custom bldrs. items that need to be addressed before issuance gone over and are being addressed.
|
Plan Reviewer's activity | | | 4/7/1999 | | PEND |
|
|
|
CALLED CONTRACTOR LEFT MESSAGE. ACTION NEEDED ON SUBMITTAL OR MAY VOID OUT OF SYSTEM
|
Plan Reviewer's activity | | | 3/16/1999 | | PEND |
|
|
|
STRUCTURAL ENGINEERING FOR REWARD WALL SYSTEM, TALL WALL ENGINEERING, ADDITIONAL FND CUTS FOR ENTRY PORCH AND COVERED CONCRETE PATIO, LATERAL ANALYSIS OF ROOM WITH INTERIOR DIMENSIONS OVER 34'. ITEMS TO BE ADDRESSED BEFORE ISSUANCE.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/15/1999 | | PEND |
|
|
|
|
Routing - PUBLIC WORKS | 1/29/1999 | | 2/25/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 1/29/1999 | | 2/25/1999 | | PASS |
|
|
|
per dave abo and mike hall
|
Routing - PUBLIC WORKS GRADING | 2/24/1999 | | 2/24/1999 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 1. Comply with CFH99-0001
|
Routing - PUBLIC WORKS GRADING | 2/3/1999 | | 2/3/1999 | | FAIL |
Rita DeYoung
|
|
|
No engineer stamped foundation plan submitted. Contacted Doug Unger (engineer). Also notified engineer and contractor that this will be a Category 1 and will require a Hillside Development application. Faxed application to Prestige Custom Homes.
|
Application received | | | 1/29/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 2/25/1999 | | | | PEND |
|
|
|
|