(F) Reprint permit | | | 3/5/2001 | | DONE |
|
|
|
|
CHANGE STATUS TO (FNL) | | | 2/13/2001 | | DONE |
|
|
|
|
BLD-Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
|
|
|
###-#### c/n removed c/c issued #18246 2/11/00 5:19:59 PM
|
BLD-Final | 12/29/1999 | 12/30/1999 | 12/30/1999 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 12:27:41. Contact: ###-####. Elec. Insp. In progress- C/N issued. Attil allesses/ energy seal/ garage house door.
|
BLD-Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | P | FAIL |
Jim Storey
|
|
|
tammy ###-####. Called and canceled.
|
INSP - Framing/Rough-in | 7/29/1999 | 8/2/1999 | 8/2/1999 | A | PASS |
Russ Owen
|
|
|
08/02/99 407 - CHUCK ###-#### INSULATION
|
INSP - Framing/Rough-in | 7/26/1999 | 7/26/1999 | 7/26/1999 | A | FAIL |
Russ Owen
|
|
|
/ / 407 - OK TO INSULATE STILL HAVE FRAMING CORRECTIONS.
|
INSP - Framing/Rough-in | 7/23/1999 | 7/26/1999 | 7/26/1999 | A | FAIL |
Jim Storey
|
|
|
07/26/99 301 - trans to russ in the area
|
INSP - Framing/Rough-in | 7/19/1999 | 7/19/1999 | 7/19/1999 | P | FAIL |
Russ Owen
|
|
|
07/19/99 407 - still has corrections.
|
INSP - Framing/Rough-in | 7/15/1999 | 7/15/1999 | 7/15/1999 | P | FAIL |
Russ Owen
|
|
|
07/15/99 407 - left corrections,mechanical,gas logs and framing corrctio
|
INSP - Framing/Rough-in | 7/14/1999 | 7/14/1999 | 7/14/1999 | P | NR |
Russ Owen
|
|
|
07/14/99 407 - need truss,mechanicaland gas logs.
|
INSP - Framing/Rough-in | 7/28/1999 | 7/29/1999 | 7/9/1999 | A | CANC |
Jim Storey
|
|
|
07/29/99 301 - russ called and said ti canc this insp.
|
INSP - Framing/Rough-in | 5/26/1999 | 5/26/1999 | 5/26/1999 | P | PART |
Jim Storey
|
|
|
05/26/99 301 - SHEER OK
|
Plan Reviewer's activity | | | 4/14/1999 | | PASS |
|
|
|
Resubmitted on 4-8-99 because plans were lost. Did review and meeting with Tammi on 4-14-99 to go over changes. $250 review fee might be waved, will ask Marlene.
|
INSP - Concrete | 3/8/1999 | 3/8/1999 | 3/8/1999 | P | PART |
Jim Storey
|
|
|
03/08/99 301 - footting ok
|
Issue PAID IN FULL permit | | | 2/18/1999 | | |
|
|
|
|
Telephone call | | | 2/17/1999 | | PASS |
|
|
|
talked to tammy rourk to verify plans are ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/16/1999 | | PEND |
|
|
|
|
Inspection Record Card- Bld | | | 2/16/1999 | | |
|
|
|
|
Plan assigned to (SAM) | 2/12/1999 | | 2/16/1999 | | PASS |
Steve Munroe
|
|
|
02/16/99 15:17:21 SAM - this action updated by action script from <<>> in Case No. BLD99-0304
|
Plan assigned to (DJO) | 2/3/1999 | | 2/12/1999 | | PEND |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 2/12/1999 | | 2/12/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 2/11/1999 | | 2/11/1999 | | PASS |
|
|
|
brought new site plans and plan.
|
Office Staff conference/action | | | 2/8/1999 | | HOLD |
|
|
|
plans in rejection drawer tamarah is bringing in a new site plan. pe
|
Routing - PLANNING | 2/3/1999 | | 2/3/1999 | | HOLD |
|
|
|
failed side set back needs to be 20' in rejected drawer ROGER JONES HAS PLANS, HE IS CHECKING WITH SCOTT SPJUTE.
|
Telephone call | | | 2/3/1999 | | HOLD |
|
|
|
called left message that failed, set-backs. 9:25 /pe
|
Office Staff conference/action | | | 2/3/1999 | | HOLD |
|
|
|
called and left message set-backs failed.pe ROGER JONES HAS PLANS HAS BEEN IN CONTACT WITH ARCHITECT. ROGER JONES IS CHECKING WITH SCOTT SPJUTE. ON THIS.
|
Application received | | | 2/2/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 2/12/1999 | | | | PEND |
|
|
|
|