BLD-Final | 10/26/1999 | 10/26/1999 | 10/26/1999 | P | PASS |
Alan Hauser
|
|
|
Karen ###-#### C/C #18228
|
BLD-Final | 10/21/1999 | 10/22/1999 | 10/22/1999 | P | FAIL |
Tom Arcoraci
|
|
|
KAREN ###-#### REINSPECT Last C/N not complete 42 re/insp.
|
BLD-Final | 10/18/1999 | 10/19/1999 | 10/19/1999 | P | FAIL |
Jim Sly
|
|
|
BRAD--- ###-#### FN OCC--COM LOCK BOX ON BACK TO GAR--#H 3 TIMES TO H THEN 2 COUNTER TO A ONCE CLOCKWISE TO N C/N need elect. Final and misc. corr.
|
INSP - Energy code compliance | 6/14/1999 | 6/15/1999 | 6/15/1999 | P | PASS |
Tom Arcoraci
|
|
|
06/15/99 408 - ###-#### DAVE//INSULATION
|
INSP - Framing/Rough-in | 6/14/1999 | 6/14/1999 | 6/14/1999 | P | PASS |
Tom Arcoraci
|
|
|
06/14/99 408 - Dave ###-####
|
INSP - Framing/Rough-in | 6/11/1999 | 6/11/1999 | 6/11/1999 | P | FAIL |
Jim Sly
|
|
|
06/11/99 316 - Not ready...Complete prev corr......
|
INSP - Framing/Rough-in | 6/10/1999 | 6/10/1999 | 6/10/1999 | P | FAIL |
Jim Sly
|
|
|
06/10/99 316 - C/N.....Too many corr to list.....
|
INSP - Framing/Rough-in | 6/8/1999 | 6/9/1999 | 6/8/1999 | A | FAIL |
Jim Sly
|
|
|
06/09/99 316 - C/N...Need Mech, air infiltr......
|
INSP - Framing/Rough-in | 6/3/1999 | 6/4/1999 | 6/4/1999 | P | PART |
Jim Sly
|
|
|
06/04/99 316 - Shear wall OK
|
INSP - Framing/Rough-in | 6/1/1999 | 6/2/1999 | 6/2/1999 | A | FAIL |
Jim Sly
|
|
|
06/02/99 316 - Need plans for shear.
|
INSP - Framing/Rough-in | 5/10/1999 | 5/10/1999 | 5/10/1999 | P | FAIL |
Jim Sly
|
|
|
05/10/99 316 - C/N...Need appr plans
|
INSP - Foundation | 4/14/1999 | 4/14/1999 | 4/14/1999 | P | PASS |
Jim Sly
|
|
|
04/14/99 316 - Foot, wall and rebar for (2) story condition....OK
|
INSP - Foundation | 4/13/1999 | 4/13/1999 | 4/13/1999 | P | PART |
Jim Sly
|
|
|
04/13/99 316 - Foot and 2bars OK...Setbks appear OK
|
Issue PAID IN FULL permit | | | 3/29/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/22/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/1999 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/22/1999 | | PEND |
|
|
|
|
Plan assigned to (SAM) | 2/9/1999 | | 3/22/1999 | | PASS |
Steve Munroe
|
|
|
03/22/99 09:08:26 SAM - this action updated by action script from <<>> in Case No. BLD99-0326
|
Plan assigned to (DJO) | 2/4/1999 | | 2/9/1999 | | PEND |
Dan Overy
|
|
|
|
Plan Reviewer's activity | | | 2/9/1999 | | PEND |
|
|
|
Called builder to let him know plans need to be updated and have engineering done. 3/12/99-Called and left a message that they have one week to get the bracing uses addressed. They provided the engineering. 3/19/99-Called and left a message that this is the last day to get the bracing addressed, then the permit will be voided and plans mailed to him unless he contacts me.
|
Routing - PUBLIC WORKS | 2/4/1999 | | 2/5/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 2/4/1999 | | 2/4/1999 | | PASS |
|
|
|
|
Application received | | | 2/4/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 2/5/1999 | | | | PEND |
|
|
|
|