Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-00346
StatusExpired
Name HOLLAND & HART
Site Address 101 S CAPITOL BLVD
Project NameUS BANK - 15TH FLR
Customer Number 
ePlanReviewNo
Description
To remodel an existing office tenant by increasing and modifying the front entry area and selective interior spaces per approved plans on file. Existing area was 6,723 sq.ft. and after this remodel will be 6,905 sq.ft. Work to include new relocating and installing new front entry doors, new interior partitions for conference rooms, clerical areas and installation of miscellaneous interior doors and ceiling changes. NOTE: This building is fully fire sprinklered and is a high rise. Demolition work performed under BLD99-0463. (P.C.#099-99)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013  
INSP - Final8/11/19998/12/19998/12/1999AFAIL
Details
08/12/99 338 - ned to move exit sign
INSP-Final Inspection8/11/19998/11/19998/11/1999PPART
DetailsRick Jackson
cell ###-#### -phil fn need exit sign at door to core
INSP - Final8/11/19998/11/19998/11/1999PFAIL
Details
08/11/99 338 - need to move exit sign
INSP - Framing/Rough-in4/21/19994/21/19994/22/1999PPART
Details
04/26/99 338 - made k th ecover
INSP - Framing/Rough-in3/23/19993/23/19993/23/1999PPART
Details
ok to cover 1-side and cover behind the ele anf fire insp
Telephone call  3/10/1999 PASS
TALKED TO PHIL ALLEN AT ###-#### TO VERIFY PLANS ARE READY
Issue PAID IN FULL permit  3/10/1999
Print Occupancy Form  3/10/1999
Inspection Record Card- Bld  3/10/1999
Routing - PLAN CHECK2/24/1999 3/9/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/9/1999 PASS
testing condition printout  3/9/1999
Plan assigned to (MYS)2/8/1999 3/9/1999 PASS
DetailsMarlene Southard
Plan resubmittals received  3/8/1999
Received a resubmittal letter and accompanying documentation responding to my plan review.
testing condition printout  3/4/1999
Routing - FIRE2/22/1999 2/24/1999 PASS
Plan Review Completed(1st rev)  2/24/1999 FAIL
UBC issue
Plan routing begun/TENANTS  2/21/1999
Route to PLAN CHECK and FIRE.
Routing - PLAN CHECK2/21/1999 2/21/1999 FAIL
2/21/99 - Completed a preliminary review and forwarded to Floyd for his input prior to sending out review to architect. In the meantime a demolition permit was prepared so the contractor could get started. 3/1/99 - Sent copy of plan review to the architect (not approved).
Plans ACCEPTED BY PLAN TECH  2/9/1999 PASS
Received Certificate of Value  2/9/1999 PASS
Application received  2/8/1999
Recd Pcfee & Taken To Pln CK  2/8/1999
Fee Review-notes3/10/1999  
CHANGED VALUES-CHANGED VALUES AGAIN