(U.S. BANCORP) This building is not fire sprinklered. To remodel three different areas within an existing bank building. An existing restroom in the basement is being modified to create a Men's and a Women's restroom. A unisex restroom accessible to the disabled is being created on the first floor. A break room, vending area, and two "coupon booths" are being created on the first floor. All work shall be per the approved drawings, applicable codes, and plan review conditions on file. Selective demolition was permitted under BLD99-0350. PC-100-99 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes3/15/1999 8/23/1999
values changed
Letter of compliance  6/3/1999 PASS
Letter of Compliance #16586 issued 6-3-99.
INSP - Final6/1/19996/1/19996/1/1999 PART
Details
06/02/99 338 - made ok for l/.c
INSP-Final Inspection5/27/19995/28/19995/28/1999APASS
DetailsRick Jackson
U.S. BANCORP, BASEMENT & 1ST FLOOR, TIM - ###-#### occ approved
INSP - Framing/Rough-in3/26/19993/29/19993/26/1999P
DetailsUnknown
Scheduled by Hello!. Contact phone is [3714608].
(F) Reprint permit  3/17/1999
Issue PAID IN FULL permit  3/16/1999
PLANS/APPL TAKEN TO FRONT DESK  3/15/1999 PASS
Print Occupancy Form  3/15/1999
Routing - PLAN CHECK3/11/1999 3/15/1999 PASS
Telephone call  3/15/1999 PASS
talked to tim hendrix to verify plans are ready
Inspection Record Card- Bld  3/15/1999
Plan assigned to (CJW)2/10/1999 3/15/1999 PASS
DetailsCarl Westfall
03/15/99 10:59:59 CJW - this action updated by action script from <<>> in Case No. BLD99-0351
Plan Review Completed(1st rev)  3/11/1999 PASS
Routing - FIRE3/9/1999 3/11/1999 PASS
Print permit w/o conditions  3/9/1999
testing condition printout  3/9/1999
Routing - PLAN CHECK2/12/1999 3/9/1999 PASS
Plan Reviewer's activity  3/5/1999 PASS
UBC plan review started March 5, 1999 and finished March 9, 1999. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS2/10/1999 2/12/1999 PASS
Plan routing begun/TENANTS  2/10/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Application received  2/9/1999
Plans ACCEPTED BY PLAN TECH  2/9/1999 PASS
Received Certificate of Value  2/9/1999 PASS