HEWLETT PACKARD - TO CONSTRUCT A 7830 SQUARE FOOT, ONE STORY TEN METER TEST CHAMBER AND CORRIDOR LINK ADDITION WITH A 1960 SQUARE FOOT BASEMENT AT THE NORTHEAST CORNER OF BUILDING ONE. THIS BUILDING ADDITION IS CONSTRUCTED OF A STEEL FRAME WITH METAL STUD EXTERIOR WALLS, METAL ROOF SYSTEM AND CONCRETE FLOORS. THIS BUILDING ADDITION IS FOR THE FUTURE INSTALLATION OF AN APPROXIMATE 4380 SQUARE FOOT, ALUMINUM PANEL, INSULATED TEST CHAMBER SUPPLIED BY CHAMBER MANUFACTURER. THE TEST CHAMBER WILL REQUIRE A SEPARATE TENANT IMPROVEMENT PERMIT APPROVAL. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR ALLOWABLE AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH99-0015/PC#103-99/JCM - GRADING PERMIT BLD99-0366
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes2/24/1999 1/28/2000 DONE
Letter of compliance  1/5/2000 DONE
Letter of Compliance #18221 issued 1-5-00.
BLD-Final12/29/199912/30/199912/30/1999APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/29/1999 at 15:18:30. Contact: . Ok for perm.
BLD-Final12/28/199912/29/199912/29/1999AFAIL
DetailsTom Arcoraci
CHRIS ###-#### REINSPECTION. No one at site.
Code Occupancy Approval  12/22/1999 PASS
Insp - 12/22/99 @4:30 p.m. - meets compliance with Design Review Permit(s)
FIRE-Final Inspection11/30/199912/1/199912/1/1999PPASS
DetailsJoe Tawney
chris hardt--###-#### fire fn insp Reinsp. Ok for perm. Occ.
BLD-Final12/1/199912/1/199912/1/1999PFAIL
DetailsTom Arcoraci
chris ###-#### not ready.
BLD-Framing/Rough-in10/15/199910/18/199910/18/1999PPART
DetailsTom Arcoraci
cell ###-####--ted fr--link & test chamber 1st floor Grid ok, partial ok to cover
FIRE-Final Inspection9/22/19999/23/19999/23/1999APART
DetailsRick Jackson
randy ###-#### Ok on relocation of maint. Valve on fire hydrant
CHANGE STATUS TO (I)  9/17/1999 DONE
Receive PAYMENT IN FULL  9/13/1999 DONE
INSP-Sprinkler Rough-in/Hydro6/22/19996/22/19996/22/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND HYDRO TEST
INSP-Sprinkler Rough-in/Hydro6/21/19996/21/19996/21/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON UNDERGROUND PIPING
INSP-Sprinkler Rough-in/Hydro6/18/19996/18/19996/18/1999 FAIL
DetailsJoe Tawney
/ / 406 - UGRND HYDRO FAILED, UNCOVER PIPING
INSP-Sprinkler Rough-in/Hydro6/16/19996/16/19996/16/1999 NH
DetailsJoe Tawney
/ / 406 - UG INSP CONTR NOT THERE AT SET TIME
INSP-Final Inspection6/14/19996/14/19996/14/1999PFAIL
DetailsJoe Tawney
06/14/99 406 - UNDERGROUND INSP FAIL COVERED NOT INSPECTED
INSP - Concrete5/17/19995/18/19995/18/1999APASS
DetailsTom Arcoraci
05/18/99 408 - SPECIAL INSP ON SITE
INSP - Foundation4/22/19994/23/19994/23/1999APART
DetailsTom Arcoraci
###-#### MTI WILL BE ON SITE
Received partial PAYMENT  4/23/1999
INSP - Concrete4/15/19994/16/19994/16/1999APART
DetailsTom Arcoraci
04/16/99 408 - pouring at 10 am rebar for slab ongrade Mike ###-####
INSP - Concrete4/7/19994/9/19994/9/1999APART
DetailsTom Arcoraci
04/09/99 408 - Mike 1-###-####
Issue & PRINT FEE-DUE permit  4/6/1999
Telephone call  4/5/1999
talked to dick hunt gave dollar amount
PLANS/APPL TAKEN TO FRONT DESK  4/5/1999 PASS
Print Occupancy Form  4/5/1999
Inspection Record Card- Bld  4/5/1999
Routing - PLAN CHECK3/10/1999 4/5/1999 PASS
Plan assigned to (JCM)2/10/1999 4/5/1999 PASS
DetailsJohn Menard
Plan resubmittals received  3/31/1999 PEND
Received resubmittals from Boucher, Mouchka and Larson Architects, forwarded same to John Menard DAR 3/30/99
Routing Off Site - STRUCTURAL3/22/1999 3/23/1999 PASS
SENT RESUBMITTALS TO CONSULTING ENGINEER. DAR 3/22/99
Plan resubmittals requested  3/22/1999 PEND
MAILED RICH BROOKS A LETTER REQUESTING REVISIONS THAT WERE NOT DONE ON THE LAST RESUBMITTAL. FAXED RICH BROOKS A COPY OF THIS LETTER AT 11:30, 03/23/99. JCM
Plan resubmittals received  3/19/1999
RECEIVED FOUR COPIES OF REVISED CIVIL, ARCH., LANDSCAPE, ELECT., STRUCT., AND MECH. PLANS PLUS ASSOCIATED PAPER WORK. ROUTED THREE COPIES TO JOHN M. AND KEPT ONE COPY AT MY DESK. KMM
Plan Review Completed(1st rev)  3/10/1999 FAIL
ubc issues
Routing - FIRE3/5/1999 3/10/1999 PASS
need fire alarm plans - no rough in allowed....need sprinkler submittal
Plan resubmittals requested  3/4/1999 PEND
MAILED RICH BROOKS AT BOUCHER-MOUCHKA-LARSON ARCHITECTS REQUESTING REVISIONS.
Routing - PLAN CHECK2/17/1999 3/4/1999 PEND
Plan resubmittals requested  3/1/1999 PEND
FAXED RICH BROOKS AT BOUCHER-MOUCHKA-LARSON ARCHITECTS A COPY OF THE STRUCTURAL PLAN REVIEW COMMENT LIST REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL2/10/1999 3/1/1999 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM 2-17-99 SENT OUT TO ENG. ONE COPY OF REVISED CALCS. KMM
Routing - PLANNING2/16/1999 2/17/1999 PASS
PER DRH 99-0015
Routing - PLUMBING2/12/1999 2/16/1999 PASS
Plan resubmittals received  2/16/1999
RECEIVED THREE COPIES OF REVISED CALCS. ROUTED ONE TO OUTSIDE ENG. AND TWO TO JOHN M. KMM
Routing - PUBLIC WORKS2/10/1999 2/12/1999 PASS
Plans ACCEPTED BY PLAN TECH  2/10/1999 PASS
Received Certificate of Value  2/10/1999 PASS
Plan assigned to (MYS)2/9/1999 2/10/1999 PASS
DetailsMarlene Southard
Plan routing begun/NEW & ADDTN2/10/1999 2/10/1999