Permit Information
Permit NumberBLD99-00392
StatusFinaled
Name RONALD W VANAUKER
Site Address 500 S 10TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel an existing tenant space of 2,170 s.f. located on the first floor of a 22,178 s.f. three story building. To remove approximately 60 feet of interior non-bearing walls & construct approximately 80 lineal feet of new non-bearing walls to create a new private office and conference rooms and enlarge existing office areas within the existing space. Construction to be metal studs with 5/8" type 'x' sheetrock cover per notes on plan. All per approved plans, notes & plan review comments attached to plans. Building is fully fire sprinkled for purpose of adding third floor per section 506 UBC. NOTE: EXISTING 1-HOUR EXIT COORIDOR SERVING THIS TENANT SPACE TO BE MAINTAINED. FIRE DEPARTMENT APPROVAL OF SPRINKLER SYSTEM & MODIFICATIONS THERETO FOR CODE COMPLIANCE IS A CONDITION OF FINAL OCCUPANCY AND ISSUANCE OF A CERTIFICATE OF OCCUPANCY. PC#99-107/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/25/2011  
Permanent occupancy  4/7/1999 PASS
Perm. Occ. Cert. #7722 issued 4-7-99 to Meyers & Pluckebaum.
INSP - Final4/5/19994/5/19994/5/1999PPASS
Details
04/05/99 338 - made ok for occ
Permanent Occupancy 4/5/19994/5/1999 DONE
Details
INSP - Final3/25/19993/29/19993/29/1999APASS
DetailsRick Jackson
###-#### occ approved
INSP - Final3/25/19993/29/19993/29/1999PPART
Details
03/29/99 338 - ###-####
INSP - Framing/Rough-in2/25/19992/26/19993/1/1999APART
Details
02/26/99 338 - MADE OK TO COVER 1ST FLOOR WITH ELE INSP APPROVALS
INSP - Framing/Rough-in2/19/19992/22/19992/24/1999APART
Details
02/24/99 338 - NO ANSWER NO RESP PERSON ON THE JOBSITE
Issue PAID IN FULL permit  2/18/1999
Inspection Record Card- Bld  2/16/1999
Print Occupancy Form  2/16/1999
Telephone call  2/16/1999 PASS
talked to cynthia to verify plans are ready
Plan assigned to (DRS)2/11/1999 2/12/1999
DetailsDan Stuart
PROCESSING AS A FAST TRACK PERMIT.
Routing - PLAN CHECK2/12/1999 2/12/1999 PASS
BASED ON APPLICATION, THAT BUILDING IS FULLY SPRINKLED, AND FILE THAT CLASSIFIES THE BUILDING CONSTRUCTION TYPE III-N WHICH ALLOWS ONLY 2 STORIES PER TABLE 5-B I HAVE NOTED THAT PER SECTION 506 UBC THE THIRD LEVEL WAS ADDED TO THE III-N STRUCTURE UNDER THE CINDITION THAT BUILDING IS FULLY SPRINKLED.
Plan Review Completed(1st rev)  2/12/1999 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/12/1999 PASS
PROCESSING FOR ISSUANCE IOF PERMIT
Print Pending Permit.LaserJet4  2/12/1999 PASS
PROCESSING FOR ISSUANCE OF PERMIT. MODIFICATIONS REQUIRED FOR SPRINKLER SYSTEM COVERAGE OF AREAS CREATED OR MODIFIED AS A RESULT OF THIS TENANT IMPROVMENT REMODEL WILL BE REVIEWED & APPROVED BY FIRE FIELD INSPECTOR.
PLANS/APPL TAKEN TO FRONT DESK  2/12/1999 PASS
PROCESSING FOR ISSUANCE OF PERMIT.
Print Pending Permit.LaserJet4  2/12/1999 PASS
Print Pending Permit.LaserJet4  2/12/1999 PASS
Meeting  2/11/1999
MET WITH GAYLE JENSEN TO REVIEW PLAN FOR POSSIBLE STATUS AS FAST TRACK PERMIT. PLAN QUALIFIES AS IT IS AN EXISTING TENANT SPACE , CONSTRUCTION INVOLVES INTERIOR NON-BEARING WALLS THAT ARE NO PART OF A RATED SWALL SYSTEM AND IS AN OFFICE OCCUPANCY.
Application received  2/11/1999