Permanent Occupancy | | 9/21/1999 | 9/21/1999 | | DONE |
|
|
|
|
BLD-Final | 9/20/1999 | 9/21/1999 | 9/21/1999 | A | PASS |
Carl Dependahl
|
|
|
Kevin, ###-#### - I have the card, Carl - Cathy Ok for C/O
|
Permanent occupancy | | | 9/21/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #7902 issued 9-21-99 to Carl's Jr. restaurant.
|
Code Occupancy Approval | | | 9/13/1999 | | DONE |
Carol Montgomery
|
|
|
Meets compliance with DR98-0222
|
Code Occupancy Approval | | | 8/17/1999 | | FAIL |
|
|
|
Inspection for Final - NOT READY - above-grade H/c signs (2) not in. Removed plants from ne planter along Milwaukee to put in sidewalk - plants not replaced.
|
INSP-Final Inspection | 7/2/1999 | 7/2/1999 | 7/2/1999 | P | PASS |
Rick Jackson
|
|
|
occ approved
|
INSP-Final Inspection | 7/2/1999 | 7/2/1999 | 7/2/1999 | A | FAIL |
Rick Jackson
|
|
|
test hood system and balance report
|
INSP - Final | 7/1/1999 | 7/2/1999 | 7/2/1999 | P | FAIL |
|
|
|
07/02/99 338 - Kevin ###-####
|
Temporary occupancy | | | 7/2/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3865 issued 7-2-99 to Carl's, Jr.
|
INSP - Framing/ Rough-in | 6/14/1999 | 6/14/1999 | 6/14/1999 | | PART |
Carl Dependahl
|
|
|
/ / 340 - DRAFT STOPS IN; COMPLETE 1HR AT HOOD
|
INSP - Framing/Rough-in | 6/10/1999 | 6/11/1999 | 6/11/1999 | A | PART |
Carl Dependahl
|
|
|
06/11/99 340 - ###-####//FINAL FRAMING; still need 1hr around hoods per
|
INSP - Final | 6/10/1999 | 6/10/1999 | 6/10/1999 | P | FAIL |
Carl Dependahl
|
|
|
06/10/99 340 - Kevin ###-#### KEEP C/N
|
INSP - Framing/Rough-in | 6/7/1999 | 6/8/1999 | 6/8/1999 | A | FAIL |
Carl Dependahl
|
|
|
06/08/99 340 - ###-#### KEVIN//FINAL FRAMING; keep c/n, ok to insul.pend
|
INSP - Framing/Rough-in | 6/3/1999 | 6/3/1999 | 6/3/1999 | | FAIL |
Carl Dependahl
|
|
|
06/03/99 340 - ###-####//FRAMING; ext walls ok for efis
|
INSP - Framing/Rough-in | 6/2/1999 | 6/3/1999 | 6/3/1999 | A | FAIL |
Carl Dependahl
|
|
|
06/03/99 340 - ###-####//FRAMING c/n ,draftstops.ok to install efis
|
INSP - Framing/Rough-in | 5/26/1999 | 5/27/1999 | 5/27/1999 | A | FAIL |
Carl Dependahl
|
|
|
05/27/99 340 - ###-####//ROOF NAILING/PARTIAL SHEAR WALL; c/n. add faste
|
INSP - Foundation | 4/30/1999 | 5/3/1999 | 5/3/1999 | A | PART |
Tom Arcoraci
|
|
|
05/03/99 408 - wall ok need spec inspec report and soils report
|
INSP - Foundation | 4/28/1999 | 4/29/1999 | 4/29/1999 | P | PART |
Carl Dependahl
|
|
|
04/29/99 340 - footing/ uffer ground/ property lines/ Kevin ###-####;pen
|
INSP - Foundation | 4/27/1999 | 4/28/1999 | 4/28/1999 | A | CANC |
Carl Dependahl
|
|
|
04/28/99 340 - property line setback/ footing/ Late afternoon Kevin 850-
|
(F) Reprint permit | | | 4/27/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/26/1999 | | |
|
|
|
|
Routing - PLAN CHECK | 4/5/1999 | | 4/7/1999 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 2/16/1999 | | 4/7/1999 | | PASS |
John Menard
|
|
|
|
Print Occupancy Form | | | 4/6/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/6/1999 | | |
|
|
|
|
Routing - PLUMBING | 4/5/1999 | | 4/5/1999 | | PASS |
|
|
|
|
CHANGE STATUS TO (P) | | | 3/30/1999 | | |
|
|
|
should be in the pend status not ready
|
Routing - PLUMBING | 3/25/1999 | | 3/25/1999 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 3/24/1999 | | 3/25/1999 | | PEND |
|
|
|
|
Routing - PLANNING | 3/19/1999 | | 3/24/1999 | | PASS |
|
|
|
approved per DRH98-0222.
|
Routing - PLAN CHECK | 3/12/1999 | | 3/19/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/18/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED DRAWINGS. SHEETS, COVER, A1.1, A6.1, A7.2, A7.6. ROUTED TO JOHN M. KMM
|
Routing - FIRE | 3/9/1999 | | 3/11/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/2/1999 | | 3/9/1999 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/5/1999 | | 3/8/1999 | | PASS |
|
|
|
ONE COPY OF REVISED DRAWINGS SENT TO OUTSIDE ENG. VIA PDQ. KMM ONE COPY OF REVISED CALCS. PLUS ONE COPY OF RESPONSE ITEMS. KMM
|
Plan resubmittals requested | | | 3/8/1999 | | PEND |
|
|
|
COMMENT LIST MAILED TO JOHN DAY AT DESIGN RESOURCES REQUESTING PLAN REVISIONS.
|
Plan resubmittals received | | | 3/3/1999 | | PEND |
|
|
|
RECEIVED RESUBMITTALS FROM DESIGN RESOURCES,FORWARDED SAME TO JOHN MENARD. DAR 3/3/99
|
Routing - PLUMBING | 3/1/1999 | | 3/2/1999 | | FAIL |
|
|
|
|
Routing - PLANNING | 2/19/1999 | | 3/1/1999 | | FAIL |
|
|
|
Plans approved for CUP98-0089. Design Review failed plans due to handicap parking locations (condition of approval #1b/DRH98-0222).
|
Plan resubmittals requested | | | 2/19/1999 | | PEND |
|
|
|
FAXED JOHN DAY AT DESIGN RESOURCES A COPY OF THE CONSULTING ENGINEER'S COMMENT LIST REQUESTING REVISIONS.
|
Routing - PUBLIC WORKS | 2/16/1999 | | 2/19/1999 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/16/1999 | | 2/18/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 2/16/1999 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/16/1999 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 2/12/1999 | | 2/16/1999 | | PASS |
Marlene Southard
|
|
|
|
Application received | | | 2/12/1999 | | |
|
|
|
|
Received Certificate of Value | | | 2/12/1999 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/12/1999 | | |
|
|
|
|
Routing Off Site - C.D.H | 2/12/1999 | | 2/12/1999 | | PASS |
|
|
|
|