Fee Review-notes | 4/30/1999 | | 8/21/2002 | | DONE |
|
|
|
|
BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PASS |
Russ Owen
|
|
|
call Pat first; Phone #: ###-####shell core ok perm oc. 7/29/2002 2:08:35 PM
|
FIRE-Final Inspection | 7/24/2002 | 7/25/2002 | 7/25/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled. structural inspector to verify the thumbturn has been removed from the rear door 7/25/2002 10:38:42 AM
|
Code Occupancy Approval | | | 7/25/2002 | | CLOS |
|
|
|
OK SO SIGNED FINAL.
|
FIRE-Final Inspection | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | FAIL |
Troy Cobbley
|
|
|
remove thumbturns on the exterior doors, provide approved hardware for the second floor offices 6/26/2002 1:30:55 PM
|
BLD-Conference | 6/25/2002 | 6/26/2002 | 6/26/2002 | P | PART |
Russ Owen
|
|
|
###-#### Pat. went over final requirements 6/26/2002 4:28:33 PM
|
BLD-Conference | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PART |
Russ Owen
|
|
|
PAT ###-#### OR ###-#### FOR CONF . new details for glass railings from engineer ok. 5/6/2002 12:07:13 PM
|
BLD-Conference | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PART |
Russ Owen
|
|
|
###-####went over handrails. 3/21/2002 4:33:32 PM
|
FIRE-Final Inspection | 3/19/2002 | 3/20/2002 | 3/20/2002 | P | NR |
Troy Cobbley
|
|
|
Inspection was really a conference. Went over fire extinguisher locations, permanent address location, change out of door hardware to approved type 3/20/2002 4:28:24 PM
|
BLD-Other | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/19/2002 3:40:00 PM
|
BLD-Conference | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Russ Owen
|
|
|
###-#### or ###-#### Pat call to meet
|
BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | CANC |
Russ Owen
|
|
|
JOHN ###-#### LOCK BOX # 193 This is not ready needs other required signatures. 2/28/2002 10:23:24 AM
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Russ Owen
|
|
|
PAT ###-#### rear window at stair not resolved will need temp glass,framing c/n complete ok to insulate. 1/1/2002 2:46:51 PM
|
BLD-Framing/Rough-in | 4/24/2001 | 4/30/2001 | 4/30/2001 | A | PART |
Russ Owen
|
|
|
reinspection pat ###-#### still has c/n will recall. 11/30/2001 4:21:19 PM
|
BLD-Framing/Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 17:13:45. Contact: ###-####.c/n posted. 3/2/2001 11:33:41 AM
|
BLD-Conference | 3/2/2001 | 3/2/2001 | 3/2/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 07:25:40. Contact: ###-####.c/n posted. 3/2/2001 11:33:49 AM
|
BLD-Framing/Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | FAIL |
Russ Owen
|
|
|
###-####partial will recall. 3/1/2001 5:33:50 PM
|
BLD-Conference | 2/22/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 2/22/2001 8:17:50 AM Conf with elect contr regarding exit and emerg lights. Approved plans not on site.
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 2/13/2001 11:12:18 AM went over requirements with bld and mec contractor.
|
BLD-Framing/Rough-in | 11/8/2000 | 11/8/2000 | 11/8/2000 | P | PART |
Dave Hannah
|
|
|
SHEAR PANEL--PAT-- ###-####
|
BLD-Framing/Rough-in | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | NR |
Carl Dependahl
|
|
|
shear panel\\###-####
|
BLD-Framing/Rough-in | 11/3/2000 | 11/3/2000 | 11/3/2000 | P | FAIL |
Carl Dependahl
|
|
|
shear panel-- pat- ###-#### or ###-####
|
BLD-Conference | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | PASS |
Tom Arcoraci
|
|
|
Don ###-####
|
BLD-Foundation | 1/7/2000 | 1/10/2000 | 1/10/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/07/2000 at 13:07:41. Contact: ###-####. Wall rebar appears ok.. Still need "soils" test. Contractor stated it's been performed.
|
BLD-Conference | 1/7/2000 | 1/7/2000 | 1/7/2000 | P | PASS |
Carl Dependahl
|
|
|
Met w/builder onsite, need soils test report. Pour at own risk.
|
BLD-Footing | 12/16/1999 | 12/17/1999 | 12/17/1999 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 17:32:53. Contact: ###-####. Need submit soils test; set-backs ok.
|
BLD-Footing | 12/16/1999 | 12/17/1999 | 12/16/1999 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 13:37:14. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/16/1999 at 17:31:36.
|
BLD-Footing | 12/15/1999 | 12/16/1999 | 12/16/1999 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 10:45:41. Contact: ###-####. Rained out; recall.
|
BLD-Footing | 12/15/1999 | 12/15/1999 | 12/15/1999 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 10:15:39. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/15/1999 at 10:43:56.
|
(F) Reprint permit | | | 8/17/1999 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 8/16/1999 | 8/16/1999 | 8/16/1999 | | PASS |
|
|
|
impact fee certificate 99-5557 $24702.00 paid
|
Issue PAID IN FULL permit | | | 8/16/1999 | | |
|
|
|
|
Telephone call | | | 8/13/1999 | | |
|
|
|
talked to scott pat will be in on monday will call me
|
Telephone call | | | 8/4/1999 | | PASS |
|
|
|
scott took down the info. that the permit was ready.
|
Telephone call | | | 4/28/1999 | | |
|
|
|
PAT CALLED WILL BE TAKING PLANS TO ACHD WILL CALL NEXT MONTH MIDDLE
|
Routing - PLAN CHECK | 4/8/1999 | | 4/13/1999 | | PEND |
|
|
|
|
Plan assigned to (JCM) | 2/19/1999 | | 4/13/1999 | | PASS |
John Menard
|
|
|
|
Routing - PLANNING | 4/13/1999 | | 4/13/1999 | | PASS |
|
|
|
Approved by Conditional Use Staff and Design Review Staff per DRH98-0082 and DRH99-0053.
|
Telephone call | | | 4/13/1999 | | |
|
|
|
left message gave dollar amount told pat he needed something from achd impact fees
|
Print Occupancy Form | | | 4/13/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/13/1999 | | 4/13/1999 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/1999 | | |
|
|
|
|
Routing - PLUMBING | 4/8/1999 | | 4/8/1999 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/7/1999 | | PASS |
|
|
|
PLAN REVISIONS REVIEWED AND APPROVED AS SUBMITTED WITH REDLINED NOTES. PROJECT WAITING FOR DESIGN REVIEW AND PLUMBING APPROVALS.
|
Plan resubmittals received | | | 4/6/1999 | | PEND |
|
|
|
Received resubmittals from Mike Fairchild, forwarded to John Menard. DAR 4/6/99
|
Plan resubmittals received | | | 4/5/1999 | | PASS |
|
|
|
RECEIVED RESUBMITTALS FROM MIKE FAIRCHILD, ARCHITECT, FORWARDED SAME TO JOHN MENARD. DAR 4/5/99
|
Routing - FIRE | 4/1/1999 | | 4/1/1999 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/31/1999 | | 4/1/1999 | | PEND |
|
|
|
|
Plan Review Completed(1st rev) | | | 3/31/1999 | | FAIL |
|
|
|
ubc, ufc, planning & plumbing fails
|
Routing Off Site - STRUCTURAL | 3/30/1999 | | 3/31/1999 | | PASS |
|
|
|
Structural resubmittals forwarded to consulting structural engineeres. DAR 3/30/99
|
Routing - FIRE | 3/30/1999 | | 3/31/1999 | | FAIL |
|
|
|
need fire flow information and locate one more hydrant
|
Plan resubmittals requested | | | 3/30/1999 | | PEND |
|
|
|
MAILED MIKE FAIRCHILD A COPY OF THE PRELIMINARY PLAN REVIEW COMMENT LIST REQUESTING REVISIONS.
|
Routing - PLAN CHECK | 3/24/1999 | | 3/30/1999 | | PEND |
|
|
|
|
Plan resubmittals received | | | 3/29/1999 | | |
|
|
|
THREE COPIES OF REVISED SHEET A-12 PLUS THREE COPIES OF STRUCTURAL RESPONSE CALCULATIONS. ROUTED TO JOHN M. KMM
|
Plan resubmittals received | | | 3/25/1999 | | PEND |
|
|
|
Received resubmittals from Mike Fairchild, forwarded to sets to Tempra Wilson and two sets to John Menard. DAR 3/25/99
|
Routing Off Site - STRUCTURAL | 3/24/1999 | | 3/25/1999 | | FAIL |
|
|
|
Resubmitted plans and calcs. to go to outside eng. contacted PDQ to take plans out. kmm
|
Plan resubmittals requested | | | 3/25/1999 | | PEND |
|
|
|
FAXED MIKE FAIRCHILD A COPY OF THE STRUCTURAL COMMENTS FROM THE CONSULTING ENGINEER REQUESTING ADDITIONAL REVISIONS.
|
Plan resubmittals received | | | 3/24/1999 | | PEND |
|
|
|
Received 3 sets of resubmittals from Mike Fairchild, forwarded one set of plans to Tempra Wilson and two sets to John Menard. DAR 3/24/99
|
Routing Off Site - STRUCTURAL | 2/19/1999 | | 3/3/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
|
Routing - PLUMBING | 2/25/1999 | | 2/26/1999 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 2/19/1999 | | 2/25/1999 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | 2/19/1999 | | 2/19/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/18/1999 | | PASS |
|
|
|
|
Received Certificate of Value | | | 2/18/1999 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 2/18/1999 | | 2/18/1999 | | |
Marlene Southard
|
|
|
|
Application received | | | 2/18/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/18/1999 | | |
|
|
|
|