Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-00548
StatusFinaled
Name DAVID R TURNBULL
Site Address 12302 W EXPLORER AVE
Project NameMEEKER ONE BLDG
Customer Number 
ePlanReviewNo
Description
To construct approximately 33 feet of interior non-bearing walls to create two private office spaces,within an existing Lobby Reception Area, of approximately 280 sq. feet. To relocate existing lighting & mechanical fixtures within the existing suspended ceiling system. To adjust and add to fire sprinkler system as needed to provide compliance with sec. 904 UBC. To add a 3'-0" X 6'-8" door for each office with a sidelight. Glazzing to be safety glass. Door hardware to meet accessiblity requirements of Ch. 11 UBC. Lateral bracing of walls to be provided by extending framing to structure above or attach to ceiling grid and brace grid per ES Report No. 4071 (copy attached to plans). All per approved plans & attachments. PC#99-144 / drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/14/2016 DONE
Case Summary (BLD)  9/22/2014 DONE
Letter of compliance  4/14/1999 PASS
Letter of Compliance #16549 issued 4-14-99.
Temporary occupancy  4/5/1999 PASS
Temp. Occ. Cert. #3811 issued 4-5-99 to ITT Tech Institute.
INSP - Final4/2/19994/2/19994/2/1999 PASS
DetailsJim Sly
/ / 316 - FINAL OK
INSP - Final4/2/19994/2/19994/2/1999 PASS
DetailsJoe Tawney
/ / 406 - FINAL OK FOR CERT OF COMPLETION
INSP - Final3/31/19994/1/19994/1/1999PFAIL
DetailsTom Arcoraci
04/01/99 408 - ###-####
INSP-Final Inspection3/23/19993/23/19993/23/1999PPART
DetailsJoe Tawney
03/23/99 406 - OK ON R. I. OF SPKLRS
INSP - Framing/Rough-in3/15/19993/15/19993/15/1999 PASS
DetailsJim Sly
/ / 316 - OK
INSP - Framing/Rough-in3/15/19993/15/19993/15/1999PPASS
DetailsJim Sly
03/15/99 316 - STEVE ###-####
INSP - Framing/Rough-in3/11/19993/11/19993/11/1999PFAIL
DetailsJim Sly
03/11/99 316 - C/N.....Need electr and sprinkler approvals.
Print Pending Permit.LaserJet4  3/3/1999 PASS
Plan assigned to (DRS)3/2/1999 3/3/1999
DetailsDan Stuart
Telephone call  3/3/1999
called gc permit ready
Inspection Record Card- Bld  3/3/1999
Print Occupancy Form  3/3/1999
PLANS/APPL TAKEN TO FRONT DESK  3/3/1999 PASS
Routing to permit desk for issuance of a permit.
Inspection Record Card- Bld  3/3/1999
Print Occupancy Form  3/3/1999
Routing - PLAN CHECK3/2/1999 3/3/1999 PASS
Plan review comments attached to plans and is a part of the approved plan as a condition of this permit.
Issue PAID IN FULL permit  3/3/1999
Meeting  3/2/1999
Met with Wright Bros. representative to review scope of project. Plan can be processed as a fast track permit.
Application received  3/2/1999