Fee Review-notes | 5/24/1999 | | 11/29/1999 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/22/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #8025 issued 11-22-99 to the Critter Clinic.
|
Permanent Occupancy | | 11/18/1999 | 11/18/1999 | | DONE |
|
|
|
|
BLD-Final | 11/17/1999 | 11/18/1999 | 11/18/1999 | P | PASS |
Carl Dependahl
|
|
|
Critter Clinic, ###-#### - Tom, I have the occ. req. card - Cathy Ok for perm. C/O.
|
CHANGE STATUS TO (TMP) | | | 10/29/1999 | | DONE |
|
|
|
|
Temporary occupancy | | | 8/18/1999 | | PASS |
|
|
|
Temp. Occ. Cert. #3888 issued 8-18-99 to the Critter Clinic.
|
INSP - Final | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | PART |
Tom Arcoraci
|
|
|
08/12/99 408 - ok for temp occ
|
INSP-Final Inspection | 8/9/1999 | 8/9/1999 | 8/9/1999 | P | PASS |
Joe Tawney
|
|
|
08/09/99 406 - FINAL OK FOR PERM OCC
|
INSP - Framing/Rough-in | 7/7/1999 | 7/7/1999 | 7/7/1999 | A | PART |
Tom Arcoraci
|
|
|
OK TO COVER ENTRY OK TO DRYWALL ONE SIDE INTERIOR AFTER OTHER ROUGH INS ARE MADE
|
INSP - Framing/Rough-in | 7/7/1999 | 7/7/1999 | 7/7/1999 | P | FAIL |
Wes Worcester
|
|
|
07/07/99 342 - SCOTT ###-#### no answer, no one on site, ?????
|
INSP - Concrete | 6/16/1999 | 6/17/1999 | 6/17/1999 | A | PART |
Tom Arcoraci
|
|
|
06/17/99 408 - ###-####//grouting @ 10:00
|
INSP - Foundation | 6/2/1999 | 6/3/1999 | 6/3/1999 | P | PASS |
Tom Arcoraci
|
|
|
06/03/99 408 - ###-####//FOOTING POURING @ 2:00
|
INSP - Foundation | 5/26/1999 | 5/27/1999 | 5/27/1999 | P | PASS |
Tom Arcoraci
|
|
|
05/27/99 408 - Larry ###-#### pager
|
(F) Reprint permit | | | 5/26/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/24/1999 | | |
|
|
|
|
Telephone call | | | 5/24/1999 | | PASS |
|
|
|
lynn ###-####
|
Print Occupancy Form | | | 5/24/1999 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/13/1999 | | 5/21/1999 | | PASS |
|
|
|
RESUBMITTALS SENT TO STRUCTURAL ENGINEER. DAR 5/13/99
|
Plan resubmittals received | | | 5/21/1999 | | PEND |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM OSCA AT LARRY KNOPP'S, FORWARDED SAME TO MIKE OTTO. DAR 5/21/99
|
Plan resubmittals requested | | | 5/21/1999 | | |
|
|
|
REQUESTED ARCHITECT TO PROVIDE CORRECTED SHEET PER REVIEWING ENGINEERS REQUEST. MLO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/1999 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 3/29/1999 | | 5/21/1999 | | PASS |
Mike Otto
|
|
|
|
Telephone call | | | 5/18/1999 | | PEND |
|
|
|
LETTER FROM OWNER REGARDING NUMBER OF EMPLOYEES MISSING FROM RESUBMITTAL. ARCHITECTS OFFICE CONTACTED. MLO
|
Routing - PLAN CHECK | 5/14/1999 | | 5/17/1999 | | PASS |
|
|
|
|
Application received | | | 5/13/1999 | | AA |
|
|
|
|
Plan resubmittals received | | | 5/13/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A2, A5, A6, A8, M1, E1, E2, THREE COPIES OF SPECIFIC ANCHOR BOLT DRAWING ONE RESPONSE LETTER DATTED 5-12-99 AND TWO COPIES OF RESPONSE LETTER FROM TREASURE VALLEY ENG. DATED 5-12-99. ROUTED TO MIKE OTTO. KMM
|
Routing - FIRE | 4/19/1999 | | 4/20/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 4/20/1999 | | FAIL |
|
|
|
ubc issues
|
Routing - PLAN CHECK | 4/15/1999 | | 4/19/1999 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/29/1999 | | 4/19/1999 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG.
|
Plan resubmittals requested | | | 4/19/1999 | | FAIL |
|
|
|
CORRECTIONS SENT TO ARCHITECT. MLO
|
Routing - PLANNING | 4/13/1999 | | 4/15/1999 | | PASS |
|
|
|
Approved per DRH99-0026 by TKW and per CUP98-0163 by TC.
|
Routing - PUBLIC WORKS | 4/13/1999 | | 4/13/1999 | | PASS |
|
|
|
|
Routing - PLUMBING | 4/6/1999 | | 4/9/1999 | | PASS |
|
|
|
|
Routing - PLANNING | 3/19/1999 | | 4/6/1999 | | FAIL |
|
|
|
Still need to comply with conditions of DRH98-0240 prior to sign-off
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/1999 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 3/8/1999 | | 3/29/1999 | | PASS |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 3/19/1999 | | 3/19/1999 | | FAIL |
|
|
|
REQUIRES PROOF OF LEGAL LAND DIVISION, PLAT DOES NOT AGREE WITH LEGAL DESCRIPTION, PER JIM RICH 3/19/99 DAR
|
Routing - PUBLIC WORKS | 3/10/1999 | | 3/18/1999 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN INFORMATION, PER BM REQUIRES PROOF OF LEGAL LAND DIVISION AND SITE DOESN'T COMPLY WITH RECORDED PLAT AND/OR LEGAL DESCRIPTION PER JIM RICH. DAR 3/18/99
|
Plans ACCEPTED BY PLAN TECH | | | 3/10/1999 | | PEND |
|
|
|
RECEIVED THREE ADD. CIVIL DRAWINGS. WILL ROUTE TO PW, P&Z, FIRE,. CANNOT ROUTE TO OUTSIDE ENG. UNTIL I RECEIVE DRAWINGS AND CALCS. FOR THE PRE ENG. ROOF SYSTEM AND SUPPORTING MEMBERS. I FAXED A CERT. OF VALUE TO BRIAN FOR THE GRADING AND DRAINAGE PERMIT. ACHD DRAWINGS WERE PICKED UP ON 3-8-99. KMM 3-18-99 I spoke with David Sly and Brian Murphy about the grading and drainage for Critter Clinic. The grading and drainage will be done under the permit for the Walgreens (BLD99-0705) which is located at the same site. I told Mr. Sly that Critter Clinic will have to have the approved grading and drainage on site when they get ready to do Critter Clinic. kmm 3-29-99 RECEICED ENG. FOR THE PRE ENG. BLD WILL ROUTE TO OUTSIDE ENG. KMM
|
Plan routing begun/NEW & ADDTN | 3/8/1999 | | 3/10/1999 | | |
|
|
|
|
Plan assigned to (MYS) | 3/5/1999 | | 3/8/1999 | | |
Marlene Southard
|
|
|
|
Application received | | | 3/5/1999 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/5/1999 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/5/1999 | | HOLD |
|
|
|
SPOKE WITH BRIAN ATKINS OF K2 AT ###-#### ABOUT PROJECT. TOLD I NEED 1.) THREE ADDITIONAL CIVIL SETS 2.) THREE COPIES OF PLANS FOR PRE ENG. ROOF SYSTEM AND SUPPORTING MEMBERS PLUS CALCS. 3.) PICKUP ACHD SETS 4.) WILL DO A GRADING AND DRAINAGE PERMIT AFTER I RECEIVE CERT. OF VALUE AND CIVIL COPIES. KMM SPOKE TO HIM ABOUT TIME FRAMES AND THAT ROUTING WILL NOT START FOR THE BUILDING UNTIL I RECEIVE STRUCT. COPIES. AND CALCS. ROUTING WILL NOT START FOR GRADING UNTIL I RECEIVE CERT. OF VALUE AND THREE ADDITIONAL CIVIL COPIES. KMM. 3-9-99 SPOKE WITH JOHN M. I WILL START INHOUSE ROUTING AFTER I RECEIVE CIVIL SHEETS WHILE I AM WAITING FOR PRE. ENG. PLANS AND CALCS. KMM
|
Received Certificate of Value | | | 3/5/1999 | | PASS |
|
|
|
|