Voucher Form | | | 5/2/2000 | | DONE |
|
|
|
|
Voucher Form | | | 5/2/2000 | | DONE |
|
|
|
|
Fee Review-notes | 4/13/1999 | | 1/28/2000 | | DONE |
|
|
|
|
Permanent Occupancy | | 12/27/1999 | 12/27/1999 | | DONE |
|
|
|
|
BLD-Final | 12/23/1999 | 12/27/1999 | 12/27/1999 | A | PASS |
Jim Sly
|
|
|
Final reinspect- Younce Dental :) this is the one we talked about. Ok for perm. occ. providing all required signatures obtained.
|
Permanent occupancy | | | 12/27/1999 | | DONE |
|
|
|
Perm. Occ. Cert. #8062 issued 12-27-99 to Younce Dental.
|
BLD-Final | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | CANC |
Tom Arcoraci
|
|
|
###-#### Not ready
|
FIRE-Final Inspection | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PART |
Joe Tawney
|
|
|
###-#### Ty Reinsp. Ok for perm. Occ.
|
BLD-Final | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | PART |
Jim Sly
|
|
|
TY--- ###-#### FN OCC C/N.. Obtain perm. Occ. Staus within 90 days.
|
Temporary occupancy | | | 10/28/1999 | | PART |
|
|
|
Temp. Occ. Cert. #3935 issued 10-28-99 to Younce Dental.
|
FIRE-Final Inspection | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | FAIL |
Joe Tawney
|
|
|
Ty ###-#### Reinsp. Fail smoke seals, paperwork
|
BLD-Final | 10/27/1999 | 10/27/1999 | 10/27/1999 | P | FAIL |
Alan Hauser
|
|
|
Ty ###-#### C/N firestop 1hr ceiling.
|
Code Occupancy Approval | | | 10/25/1999 | | FAIL |
|
|
|
Inspection for occupancy - still remains to be done: small portion of landscaping curbing at the south side of building, blow in bark and hydroseed remaining portion of property to the south of development.
|
FIRE-Final Inspection | 10/20/1999 | 10/20/1999 | 10/20/1999 | P | FAIL |
Joe Tawney
|
|
|
tye ###-#### Final fail C/N issued
|
BLD-Framing/Rough-in | 10/19/1999 | 10/19/1999 | 10/19/1999 | P | PART |
Jim Sly
|
|
|
tye ###-#### grid Ceiling grid ok
|
BLD-Framing/Rough-in | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | FAIL |
Jim Sly
|
|
|
grid ceiling tye ###-#### Ceiling grid not ready
|
INSP - Framing/Rough-in | 9/15/1999 | 9/15/1999 | 9/15/1999 | P | PASS |
Jim Sly
|
|
|
|
INSP - Framing/Rough-in | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | FAIL |
Jim Sly
|
|
|
COMPLETE DRAFTSTOP DOOR LATCHES AND HOLES
|
INSP - Framing/Rough-in | 9/2/1999 | 9/2/1999 | 9/2/1999 | P | FAIL |
Jim Sly
|
|
|
09/02/99 316 - Complete prev corr
|
INSP - Framing/Rough-in | 8/26/1999 | 8/27/1999 | 8/27/1999 | P | PART |
Jim Sly
|
|
|
08/27/99 316 - Conversation/Tye allowed to rock Bsmnt walls and 1 side M
|
INSP - Framing/Rough-in | 8/24/1999 | 8/25/1999 | 8/25/1999 | A | FAIL |
Jim Sly
|
|
|
08/25/99 316 - Cancelled by Wright Bros
|
INSP - Framing/Rough-in | 8/23/1999 | 8/23/1999 | 8/23/1999 | P | FAIL |
Jim Sly
|
|
|
08/23/99 316 - C/N...Truss bracing, fix draftstops, .....
|
INSP - Framing/Rough-in | 8/18/1999 | 8/18/1999 | 8/18/1999 | P | PART |
Jim Sly
|
|
|
08/18/99 316 - Shear wall (int)....OK
|
INSP - Framing/Rough-in | 8/10/1999 | 8/10/1999 | 8/10/1999 | P | PART |
Jim Sly
|
|
|
08/10/99 316 - Shear wall...OK
|
INSP - Framing/Rough-in | 8/4/1999 | 8/4/1999 | 8/4/1999 | P | FAIL |
Jim Sly
|
|
|
08/04/99 316 - C/N...Engineer to OK HPAHD 22 strap locations...complete
|
INSP - Foundation | 6/7/1999 | 6/7/1999 | 7/6/1999 | P | FAIL |
Jim Sly
|
|
|
06/07/99 316 - Cancelled by contr
|
INSP - Foundation | 6/25/1999 | 6/28/1999 | 6/28/1999 | A | PART |
Jim Sly
|
|
|
06/28/99 316 - Remainder of footings and rebar appear OK
|
INSP - Foundation | 6/15/1999 | 6/16/1999 | 6/16/1999 | A | PART |
Alan Hauser
|
|
|
06/16/99 350 - talked to ty, had special inspector on site
|
INSP - Foundation | 6/7/1999 | 6/8/1999 | 6/8/1999 | A | FAIL |
Alan Hauser
|
|
|
06/08/99 350 - done by #316
|
INSP - Foundation | 6/8/1999 | 6/8/1999 | 6/8/1999 | | PART |
Jim Sly
|
|
|
/ / 316 - FOOTING FOR BSMNT ONLY...OK (2500PSI)
|
(F) Reprint permit | | | 5/10/1999 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/7/1999 | | |
|
|
|
|
Telephone call | | | 4/30/1999 | | PASS |
|
|
|
talked to david davies to verify plans are ready
|
Print Occupancy Form | | | 4/30/1999 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/30/1999 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/1999 | | PASS |
|
|
|
|
Plan assigned to (MLO) | 3/18/1999 | | 4/28/1999 | | PASS |
Mike Otto
|
|
|
|
Plan resubmittals received | | | 4/27/1999 | | PEND |
|
|
|
PLAN RESUBMITTALS RECEIVED FROM DAVID DAVIES, ARCHITECT,(PLUMBING PLANS FROM ELKHORN ENGINEERS) FORWARDED SAME TO MIKE OTTO. DAR 4/27/99
|
Routing - PLUMBING | 4/21/1999 | | 4/21/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/19/1999 | | FAIL |
|
|
|
ARCHITECT PROVIDE ONE SET OF UNDER SIZED PLANS WHICH WERE REJECTED. MLO
|
Routing - PLAN CHECK | 4/14/1999 | | 4/15/1999 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/14/1999 | | |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS 5.22, 5.24, 5.23, 3.31, 3.36, 3.41, 7.00 PER O7 APRIL 1999 REVIEW COMMENTS. FROM DAVID DAVIES. ROUTED TO MIKE O. KMM ARCHITECTURAL SHEETS ONLY. PLUMBING RESUBS NOT RECEIVED YET. MLO
|
Routing - PUBLIC WORKS | 4/14/1999 | | 4/14/1999 | | PASS |
|
|
|
|
Routing - FIRE | 4/12/1999 | | 4/13/1999 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 4/13/1999 | | PASS |
|
|
|
plumbing, UBc, Public works issues
|
Plan resubmittals requested | | | 4/9/1999 | | FAIL |
|
|
|
corrections mailed and faxed to architect. mlo
|
Routing - PLAN CHECK | 4/1/1999 | | 4/9/1999 | | FAIL |
|
|
|
|
Routing - PLUMBING | 3/26/1999 | | 4/1/1999 | | FAIL |
|
|
|
|
Routing - PLANNING | 3/23/1999 | | 3/26/1999 | | PASS |
|
|
|
Approved for DRH99-0003 compliance. Pending CU review. Tkw Approved for cup98-0129 compliance.
|
Routing - PUBLIC WORKS | 3/18/1999 | | 3/23/1999 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISIONS, PER BRIAN MURPHY. DAR 3/23/99
|
Plan assigned to (MYS) | 3/17/1999 | | 3/18/1999 | | |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/18/1999 | | PEND |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/17/1999 | | |
|
|
|
|
Application received | | | 3/17/1999 | | |
|
|
|
|