Permit Information
Permit NumberBLD99-00861
StatusFinaled
Name JESS GROVES
Site Address 2141 S BROADWAY AVE
Project NamePINON RETAIL
Customer Number 
ePlanReviewNo
Description
(PINON RETAIL/TSUNAMI SPORTS) Fire sprinklers used to allow unseparated storage areas. To remodel an existing 10,670 square foot building for a new retail tenant. Work includes modifying 2 existing restrooms to be accessible to the disabled, constructing interior and exterior nonbearing walls, and building an exterior canopy and roof tower all per approved drawings, engineering, and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. See BLD99-1219 for the demolition permit. See BLD99-0872 for the grading permit. DRH98-0237 PC-227-99 **CJW** (7-8-99) ONLY THE STORAGE ROOM IS REQUIRED TO BE FIRE SPRINKLERED.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/16/2012 DONE
DetailsTim L. Woodard
Fee Review-notes5/24/19995/24/19992/11/2000 DONE
ok
Permanent occupancy  10/15/1999 DONE
Perm. Occ. Cert. #7947 issued 10-15-99 to Pinion Retail.
Permanent Occupancy 10/14/199910/14/1999 DONE
Details
BLD-Final10/14/199910/14/199910/14/1999PPASS
DetailsTom Arcoraci
MIKE-- ###-#### FN OCC INSP Ok for perm.
Permanent occupancy  10/14/1999  
Code Occupancy Approval  10/14/1999 PASS
THIS PROJECT IS TO PLANS NOW, HOWEVER THE NORTH BUILDING WAS REQUIRED TO MATCH THE PINON BUILDING. THIS WAS NOT DONE AS THE NEW TYPE METAL ROOF IS ONLY ON 1/2 OF THIS NORTH BUILDING AND THE REMAINING WAS THE OLD OOD PAINTED DARK BROWN, I NOTIFIED MARTY OF THIS AND HE CALLED BUILDERS AND REVIEWED FILE, PER MARTY'S OK I SIGNED OFF FINAL AND RELEASED BOND.
BLD-Final9/15/19999/16/19999/16/1999PPART
Details
TEMP OCC OK, SIGNED TEMP COLUMN
FIRE-Final Inspection9/15/19999/16/19999/16/1999APASS
DetailsJoe Tawney
REINSPEC OK FOR PERM OCCUPANCY
Temporary occupancy  9/16/1999 PART
Temp. Occ. Cert. #3923 issued 9-16-99 to Pinon Retail.
Code Occupancy Approval  9/16/1999 FAIL
LANDSCAPE, PAINT AND PATIO BLOCKS NOT IN PLACE (ALSO REQUIRED FENCE), BID TO COMPLETE JOB IS FOR 13,130 + 10% = TOTAL BOND REQUIRED $14,443.

BOND POSTED 9-16-99 FOR THE REQUIRED $14,443 AND TEMPORARY SIGNED OFF.
FIRE-Final Inspection9/15/19999/15/19999/15/1999PFAIL
DetailsRick Jackson
DONE BY 406;REINSPC FAIL, C/N NOT COMPLETE
FIRE-Final Inspection9/14/19999/14/19999/14/1999PFAIL
DetailsRick Jackson
SPRINKLER HEADS OBSTRUCTED BY OVERHEAD DOOR AND PAINTED HEADS
Print Occupancy Form  9/13/1999 DONE
Inspection Record Card- Bld  9/9/1999 DONE
INSP - Framing/Rough-in7/23/19997/26/19997/26/1999APASS
DetailsJim Storey
07/26/99 301 - MIKE ###-####
INSP-Conference7/13/19997/13/19997/13/1999APART
DetailsRick Jackson
discussed with general about sprinkler removal and coverage of storage room with sprinklers
Telephone call  7/8/1999 PASS
After lengthy discussion with Pt McKeegen, Architect, and Carl Wesfall is has bee determined that the sprinkler system is only required by UBC 309.2 in the storage area.
Telephone call  7/8/1999 PASS
After lengthy discussion and research with Pat McKeegan (Architect) and CJW it has been agreed that sprinklers are required by UBC 309.2 in only the storage area.
INSP - Framing/Rough-in7/2/19997/2/19997/2/1999PPART
DetailsJim Storey
07/02/99 301 - front ok for cover
INSP - Framing/Rough-in6/17/19996/17/19996/17/1999PPART
DetailsJim Storey
06/17/99 301 - south wall ok for cover
INSP - Framing/Rough-in6/9/19996/10/19996/10/1999APART
DetailsJim Storey
06/10/99 301 - bathrooms ok for cover only
INSP - Foundation5/25/19995/26/19995/26/1999APASS
DetailsJim Storey
05/26/99 301 - ###-#### \\Tsunami Sport
Issue PAID IN FULL permit  5/25/1999
Plan assigned to (CJW)4/2/1999 5/24/1999 PASS
DetailsCarl Westfall
05/24/99 14:09:26 CJW - this action updated by action script from <<>> in Case No. BLD99-0861
Telephone call  5/24/1999 PASS
Routing - PLANNING5/21/1999 5/24/1999 PASS
approved per DRH98-0237.
PLANS/APPL TAKEN TO FRONT DESK  5/24/1999 PASS
Routing - PLAN CHECK5/24/1999 5/24/1999 PASS
Routing Off Site - A.C.H.D5/21/19995/21/19995/21/1999 PASS
as per letter dated on 5/20/99, no impact fee due as per jeff lowe
Routing - PUBLIC WORKS5/17/1999 5/21/1999 PASS
Routing - PLAN CHECK5/21/1999 5/21/1999
Plan resubmittals received  5/20/1999
RECEIVED SIX SHEETS 1 OF 1 CIVIL. ROUTED TO PW KMM
Routing - PLANNING4/9/1999 5/17/1999 PASS
applicant must submit documentation for the remodel work of the existing 5,000 sq. ft. retail building per Design Review conditions. PAT MCKEEGAN CALLED AND SAID A LETTER WAS SUBMITTED TO MARTY STATING HIS PLANS TO REPAINT THE BUILDING TO MATCH THE PINON RETAIL BUILDING. I FOUND LETTER IN FILE. PER SCOTT SPUTE, I WILL SIGN OFF FOR MARTY AND FILL MARTY IN ON THE NEW ACTION WHEN HE RETURENS FROM VACATION. SRIGGS 5-17-99.
Routing - PLAN CHECK4/20/1999 5/17/1999
Ready to route back to Public Works.
Plan resubmittals received  5/14/1999
received two copies of revised civil sheet. routed to carl w. kmm
Routing - PUBLIC WORKS5/7/1999 5/10/1999 FAIL
REQUIRES DRAINAGE PLAN REVISIONPER BRIAN MURPHY. DAR 5/11/99
Routing - FIRE4/19/1999 4/19/1999 PASS
FDC issues - field to verify
Plan Review Completed(1st rev)  4/19/1999 FAIL
PW and planning
Routing - PLAN CHECK4/14/1999 4/16/1999 PASS
testing condition printout  4/16/1999
Print permit w/o conditions  4/16/1999
Plan Reviewer's activity  4/14/1999 PASS
UBC plan review started April 14, 1999 and finished April 16, 1999. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS4/5/1999 4/9/1999 FAIL
REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. DAR 4/9/99 SEWER SEVRICE FROM STRUCTURE TO DENVER STREET MAY CONFLICT WITH POND. STROM DRAIN IN PARKING LOT TO DI ON BROADWAY SHOWEN CONNECTING TO 36" SAN SEWER. REVISE TO CONNECT TO STORM DRAIN - CONFIRM CONNECTION TO STORM DRAIN. PER JOHN MEGAHERS DAR 4/9/99
Plan routing begun/TENANTS  4/2/1999
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  4/1/1999 PASS
Recd Pcfee & Taken To Pln CK  3/31/1999
Received Certificate of Value  3/31/1999 PASS
Application received  3/31/1999
ck amount did not match value amount-should have been $593.74-ck amount is $913.44