Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberBLD99-00881
StatusFinaled
Name GEORGE & NADINE WILHELM
Site Address 729 N 15TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remove interior bearing & non-bearing walls in South half off existing fininshed basement to provide an open office concept. Structural engineering provided for new concrete footings & columns. All per approved plans, engineering & note. NOTE: Basement area & distance to exiting reviewed with Lan Smith, Assistant Fire Chief - sprinkler system is not required in basement. Conditions list as part of permit/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/12/2011 DONE
Letter of compliance  7/12/1999 PASS
Letter of Compliance #17877 issued 7-12-99.
INSP - Final7/2/19997/8/19997/8/1999PPASS
DetailsWes Worcester
07/08/99 342 - 07/06/99 342 - DEDE ###-#### CALL FIRST
INSP - Final7/6/19997/6/19997/6/1999AFAIL
DetailsWes Worcester
need electrical
INSP - Framing/Rough-in5/7/19995/10/19995/10/1999APART
Details
05/10/99 338 - need to remove combustable paper from insulation in the c
INSP - Framing/Rough-in4/28/19994/30/19994/30/1999APART
Details
04/30/99 338 - made ok to cover
Print Occupancy Form  4/2/1999
Inspection Record Card- Bld  4/2/1999
Telephone call  4/2/1999
talked to dede gave dollar amount
Issue PAID IN FULL permit  4/2/1999
Print Pending Permit.LaserJet4  4/1/1999 PASS
Approved as noted, attached & engineering.
PLANS/APPL TAKEN TO FRONT DESK  4/1/1999 PASS
Telephone call  4/1/1999
Call from Lan Smith concerning need for sprinkler system in basement or additional exits. Lan Determined that the North wall at 45 foot width had one exit and it was closer than 75 travel distance from opposite end of basement and therefore no aditional requirements were needed. Okay as is.
Routing - PLAN CHECK4/1/1999 4/1/1999 PASS
Plan approved for interior remodel per plans, engineering and review of requirements of sprinkler system with Lan Smith, Assistant Fire Chief.
Plan assigned to (DRS)4/1/1999 4/1/1999 PASS
DetailsDan Stuart
Application received  4/1/1999
Plan Reviewer's activity  3/27/1999
Fax to Lan Smith to let him know that Dede Wilhelm was going to contact him concerning exiting & sprinkler system requirments in 2100 sq. ft. basement.
Meeting  3/23/1999
Met with Dede Wihelm, Wilhelm & Associates to review proposal. Question arose as to sprinkler requirements based on total area of basement & exits from basement. Suggested she contact Lan Smith, Asst. Fire Chief for review of exits & separation and I would hold plans until I was notified.