Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-00929
StatusFinaled
Name BOISE RESEARCH CENTER INC
Site Address 6148 N DISCOVERY WAY
Project NameBRC APOLLO BLDG
Customer Number 
ePlanReviewNo
Description
To construct a 3,050 sq.ft. office tenant and 934 sq ft of core area restrooms and access hallway per approved plans on file. Work to include, construction of one-hour rated tenant demising wall, construction of interior non combustible partitions to divide area into for individual offices, one open office area, break room and conference room vestibual area and core area restrooms. The installation of a suspended ceiling system, Miscelaneous interior finishes. Mechanical, electrical and plumbing. NOTE: This building is fully fire sprinklered for area increase. Any alteration or modification to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. All required signatures must be obtained from each inspeciton department to obtain a Certificate of Occupancy prior to occupying space. (P.C.#245-99) *RMH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/10/2001  
(F) Reprint permit  8/26/1999
Fee Review-notes4/30/1999 8/23/1999
Fee Review-notes4/12/1999 8/23/1999
Permanent Occupancy 7/20/19997/20/1999 DONE
Details
Permanent occupancy  7/20/1999 PASS
issued cert. of occ. for integricare 7/20/99 cert. #7845
INSP - Final7/16/19997/19/19997/19/1999APASS
DetailsTom Arcoraci
07/19/99 408 - Dennis ###-####
INSP-Final Inspection7/13/19997/14/19997/14/1999APASS
DetailsJoe Tawney
07/14/99 406 - REINSP OK FOR PERM OCC
INSP-Final Inspection7/8/19997/9/19997/9/1999AFAIL
DetailsJoe Tawney
07/09/99 406 - FINAL FAIL DUCT DET NOT HOOKED UP, EMERG LIGHTS, EXT
INSP - Framing/Rough-in6/24/19996/24/19996/24/1999PFAIL
DetailsJim Sly
06/24/99 316 - Need Mech R.I approval
INSP - Framing/Rough-in6/21/19996/21/19996/21/1999PFAIL
DetailsTom Arcoraci
06/21/99 408 - ceiling grid dennis ###-#### cn left
INSP-Sprinkler Rough-in/Hydro6/21/19996/21/19996/21/1999 PART
DetailsJoe Tawney
/ / 406 - OK ON SPKLR ROUGH IN 2 CORR ITEMS
INSP - Framing/Rough-in6/8/19996/8/19996/8/1999PFAIL
DetailsJim Sly
06/08/99 316 - C/N...Need mech and sprinkl insp...firestop 1hr.....
Issue PAID IN FULL permit  5/10/1999
Plan assigned to (R_H)4/12/1999 5/7/1999 PASS
Details
05/07/99 14:21:52 RMH - this action updated by action script from <<>> in Case No. BLD99-0929
Print Occupancy Form  5/7/1999
Print Pending Permit.LaserJet4  5/7/1999 PASS
Plan Reviewer's activity  5/7/1999 PASS
RECEIVED MECHANICAL PLANS, MADE NOT ON PLANS AND ON PLAN REVIEW NOTES ABOUT ACCESSIBLE PASS THROUGH WINDOW.
Inspection Record Card- Bld  5/7/1999
Telephone call  5/7/1999 PASS
talked to robin to verify plans are ready
Plan resubmittals received  5/7/1999
RECEIVED ONE COPY OF REVISED SHEET A2.1 ROUTED TO RON HILL. KMM
PLANS/APPL TAKEN TO FRONT DESK  5/7/1999 PASS
Routing - PLAN CHECK4/19/1999 5/7/1999 PASS
Plan resubmittals received  5/5/1999
Received one copy of hvac plan from TML. Contacted Larry Crocket to let him know that I need one more copy. I routed the one I received to Ron Hill. kmm
Routing - PLAN CHECK4/13/1999 4/19/1999 FAIL
Routing - FIRE4/19/1999 4/19/1999 PASS
Plan Review Completed(1st rev)  4/19/1999 FAIL
ubc issues
Plan resubmittals received  4/19/1999 PEND
RECEIVED PLAN RESUBMITTALS FORM STEED CONSTRUCTION. ATTACHED SAME TO PLANS. DAR 4/14/99
Plan Reviewer's activity  4/19/1999 FAIL
Faxed requirements to Gordan Mcdonald. Will route to fire department.
Routing - PUBLIC WORKS4/12/1999 4/13/1999 PASS
Plan routing begun/TENANTS  4/12/1999
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plan assigned to (MYS)4/7/1999 4/12/1999
DetailsMarlene Southard
Received Certificate of Value  4/7/1999 PASS
Application received  4/7/1999
Plans ACCEPTED BY PLAN TECH  4/7/1999 PASS
REQUIRES RECORD DECLARATION FORM. FAXED ONE TO DAVE OF STEED. KMM
Recd Pcfee & Taken To Pln CK  4/7/1999